Draft 5000.02 The Defense Acquisition Management Framework.

User Needs

The Materiel Development Decision precedes entry into any phase of the acquisition framework Entrance criteria met before entering phase Evolutionary Acquisition or Single Step to Full Capability

Technology Opportunities & Resources

A
Materiel Solution Analysis
Materiel Development Decision

B
Technology Development

(Program Initiation) Engineering and Manufacturing Development & Demonstration


Post-CDR Assessment

IOC
Production & Deployment
LRIP/IOT&E

FOC
PIR

Operations & Support

Pre-Systems Acquisition

FRP Decision Review

Systems Acquisition

Sustainment

= Decision Point

= Milestone Review

Post Implementation Review (PIR) Capability Needs Satisfaction & Benefits Analysis CCA LSS Support Slides 1

Draft 5000.02 Requirements and Acquisition Process Flow.

DoD Strategic Guidance Joint Operating Concepts Joint Functional Concepts

ICD Initial Capabilities Document MDD Materiel Development Decision AoA Analysis of Alternatives DAB Defense Acquisition Board CDD Capability Design Document CPD Capability Production Document EMDD Engineering and Manufacturing Development and Demonstration

Gap Analysis

DAB Materiel Solution ICD MDD Analysis JROC AoA A

DAB Technology CDD1 B Development JROC DAB A Technology Development CDD2 JROC EMDD Increment 1 CPD1 JROC

DAB C DAB B EMDD CPD2 Increment 2 JROC DAB Technology A Development CDD3 JROC DAB B EMDD Increment 3 CPD3 JROC DAB C DAB C

...

CCA LSS Support Slides

Developing, Delivering and Verifying Capability

DOTLPF Plan and Execute Change of Processes and Culture Post Implementation Review (PIR) Assesses PIR Outcome Of Investment By Measuring MOEs

Capability Based Analysis Establishes Need and CBA MOEs that Define Need Fulfillment

MDD

FRPD

IOC

FOC

Develop System Requirements, Acquire System and conduct OT&E on Key Performance Parameters (KPPs)

CCA LSS Support Slides

CCA in the JCIDS & Acquisition Management Systems

Analyze

Select

Control

Evaluate

Concept Concept Development Refinement

Technology Development

System Development & Demonstration

Production & Deployment

Operations & Support

Concept Decision MS Capability Based Assessment

8. GIG 9. IA Strategy 10. Modular 11. Registration

MS B
12. PIR Plan

MS C/FSDD
12. PIR

ICD

CDD

CPD

IOC

FOC

FCB

JROC

MDA CCA

JROC

MDA CCA

DOT&E

JROC

MDA CCA Update

MDA

1. Core Function Need to be Performed by Gov 2. Outcome-based Performance Measures 3. BPR 4. No Private or Gov better

5. AoA 6. EA 7. Acquisition Measures

CCA LSS Support Slides

CCA Elements in the JCIDS CBA Process


3. Output is needed capabilities and their associated tasks, attributes & standards (MOEs) 2. Facilitates development of measures of effectiveness (MOEs) 1. Provides fundamental tasks and measures required for CBA PIRD CPD

4. Identifies functional area metrics and identifies MOEs 12. IT Architecture will contain MOEs & MOE measures

13. PIR Informs JCIDS Process

5. Core function need to be performed by government

11. Reports MOEs but no Change Management Project 10. Initiates nonmateriel Change Management Project

6. Summary of FAA/FNA Includes MOEs

7. Change Management Analysis & Benchmarking

9. May satisfy as AIS AoA 8. No private or other government organization better performs CCA function LSS Support

Slides

PIR in the Defense Acquisition Lifecycle


FCB/Sponsor MOEs ICD CDD CPD TEMP PIR Plan
FCB: Functional Capabilities Board ICD: Initial Capabilities Document CDD: Capability Development Document CPD: Capability Production Document MOE: Measure of Effectiveness

PIR

TEMP

FOT&E Platform Readiness Assessments CC Exercise results OT&E DT&E Integration & Test
User Satisfaction Surveys Annual CFO Report Input Mission Readiness Assessments ROI Computation War Games

Contract Build

SEP

MS A MS B

MS C

IOC
CCA LSS Support Slides

PIR

FOC
6

Requirements and Acquisition Process Depiction with PIR Feedback Loop


Overarching Policy NSS/NMS/Joint vision Joint Capstone Policy

Functional Area Analysis

Functional Area Functional Concept Integrated Architecture Feedback

D O T M L P F
DOTLPF Change - Materiel Process Analysis of Materiel Approaches

MS B

CDD MS A CPD

MS C

JROC DAB AoA ICD CD Concept Refinement Technology Development

JROC DAB

JROC

DAB

Demo

Increment 1

PIR

MS B Demo

MS C Increment 2

PIR

MS B Demo

MS C Increment 3

PIR

Oversight
Requirements
Integrated Decision Meetings

Acquisition

CCA LSS Support Slides

Life Cycle of a DoD Business Need


Problem Space
CBA MOEs FCB/PSA

Verification of Business Need


PIR Plan

ICD
CDD CPD

PIR

Verification of Solution
TEMP

TEMP

OT&E DT&E Integration & Test


DT&E: Development Test OT&E: Operational Test PIR: Post-implementation Review 8

Contract

Solution Space
Build
FCB: Functional Capabilities Board ICD: Initial Capabilities Document CDD: Capability Development Document CPD: Capability Production Document

SEP

CCA LSS Support Slides