Horana Project Financials
Horana Project Financials
Horana Project Financials
Establish effective supply system of packing material to USL and grow with them from Rs 374 m to Rs 750 m with in 3 years period by reducing cost factors and improving communication method and direct business relationship.
35
30 25
20
15 10 5 0
2010/11 2011/12 2012/13 2013/14 2014/15
3
Phoenix Turnover Rs m
Year 2010/11 2011/12 2012/13 2013/14 2014/15 PC 72 114 168 180 300 TB 95 95 98 114 150 Food 2 8 49 80 150 Tube Total 169 217 315 374 750 %
22 45 19 101
PC TB Food Tube
150
500
400 300
80 49 2 95 72
150
150
200
100 0
8 95
114
98
114 300
168
180
2010/11
2011/12
2012/13
2013/14
2014/15
4
Current Situation
Operating in two different location
PC and Food items at Makandura Tooth brush at Welisara
PC Production
PRODUCT QTY MC CT MC HR CAPACITY UTILIZATION
1 PBC 50 ml 2 PBC 100 ml 3 PBC 200 ML 4 Vaseline 100 ml 5 Vaseline 300 ml 7 Ponds 100 g 8 Lux 120 ml 9 lux 220 ml
10 Ponds TV100 ml
11 Domex 250 ml 12 Domex 500 ml 13 PBC Lids 14 Ponds Lids
30,000
30,000 50,000 500,000 30,000
BM - 03
BM - 28 BM - 28 IM - 50 IM - 50
550
300 250 1200 400
64
118 235 490 IM - 50 - 90 % 88
6
Labour Allocation
01
01 01 0.5 1.5 02 07 01 0.5 0.5 2.5
QC
Total Printing Labeling & Sleeving Prod; Super; FG Total
0.5
05 09 0.5 1.0 10.5
Per shift Production -07 Supporting service - 05 Shift total - 12 Total - 36 (3 shift) Day shift - 10.5 Total - 47 nos
Project Plan
Including 4 no of steps
Shifting all FG stock to Horana and supply to USL as a daily basis Relocate BM and IM Relocate Tooth brush operation Establish new Tube machine
FG Storage
Maintaining 2 weeks buffer stock To eliminate delivery issues Reduce our stock holding cost Minimize the communication gap Hand over pallet by pallet Use fork leaf
PBC 50 ml PBC 100 ml PBC 200 ML Vaseline 100 ml Vaseline 300 ml Ponds 100 g Lux 120 ml lux 220 ml Ponds TV100 ml Domex 300 ml Domex 500 ml PBC Lids Ponds Lids Phoenix Jar
65000 130000 13000 135000 10000 25000 10000 25000 13000 25000 25000 250000 13000 50000
10
Requirements
No of pallet required 140 nos Required space - 6800 sqft
11
Other
Printing
BM - 03 BM - 12 BM - 15 BM - 19 BM - 28 IM - 50 Total RM QC Prod; Super: Maintenance Total Shift Total Labeling & Sleeving FG Total Shift total Grand Total
Conveyor with deflashing Conveyor with deflashing Conveyor with deflashing Conveyor with deflashing Deflashing Lid closing unit
12
03
Other
Day
13
Option - 3
BM 28 replaced by New 3 layer machine In addition to other product Can be produced Dove containers Carder not change BM 28 can be used for another products
14
15
16
Containers
Product Domex 300 ml Monthly Qty Monthly Turn Annual Over Rs Turnover Rs 25,000 200,000 2,400,000
Dove 200 ml
25,000
Total
225,000
425,000
2,700,000
5,100,000
These moulds can be produced on new 3 layer machine USL will provide the Domex mould and Dove mould we have to make.
17
Lids
Product Monthly Qty Monthly TO Rs 1,320,000 770,000 990,000 Annual TO Rs 15,840,000 9,240,000 11,880,000 Moulds Cost USL USL USL Vaseline 100 ml 240,000 Sunslik 100 ml 144,000
Domex lids
Total
80,000
320,000
3,400,000
3,840,000
40,000,000
USL
USL will provide the mould cost, but we have to bear the machine cost Refurbished MC will be ready on mid-June
18
Tube
USL agreed to give us a 50 % of orders Annual Turn over 150 m We have to purchase a Machine
19
Description USL packing buy Phoenix supply Share - % TB Description USL packing buy Phoenix supply Share - %
Tubes Description USL packing buy Phoenix supply Share - %
Cost Benefit
Description Man Power Transport Makandura 47 Rs 1,175,000 Rs 400,000 Horana 32 Rs 800,000 Rs 100,000 Saving per month Rs 375,000 Rs 300,000 Rs 675,000
21
Investment
Required cost per
To start step 1 Rs. To start step 2 Rs
22
23
Thanks