Design of Storage Tank Foundation

You might also like

Download as ppt, pdf, or txt
Download as ppt, pdf, or txt
You are on page 1of 14

DESIGN OF STORAGE TANK FOUNDATON (R.C.C.

RING BEAM)

DESIGN DATA
O.D. OF TANK, ( D ) = 6.0m = 19.69 ft HEIGHT OF TANK, ( H ) = 7.5m = 24.61 ft SPECIFIC GRAVITY OF LIQUID (SG)= 0.85 WEIGHT OF WATER IN TEST CONDITION (WW) = 200 Te EMPTY WEIGHT , (Tank+Bottom Pl.) 11.75+1.96 Te (WE) = 13.71Te TEST WEIGHT, (Weight of water in tank in test condition) WH = WW +WE = 214Te OPERATING WEIGHT, WT =(WW x SG +WE)= 183.71Te STEEL REINFORCEMENT GRADE FE415 CONCRETE GRADE Nominal Mix 1: 1.5 : 3 TANK BASE LEVEL1200 Above FGL S.B.C. OF SOIL AT 2.0m DEPTH=16.74te/m2 BASIC WIND SPEED (Vb) = 47 m/sec SEISMIC ZONE III

1.0 CALCULATION OF WIND FORCE (REF IS 875 PART 3)


BASIC WIND SPEED (Vb) = 47 m/sec K1 = 1 , 50 YEAR OF SERVICE K2 = 1 , CATEGORY 2 CLASS A K3 = 1 DESIGN WIND SPEED Vz = Vb X K1 X K2 X K3 = 47 m/sec = 169.2 km/hr = 105.14 mph DESIGN WIND PRESSURE Pz = 0.6 x (Vz)^2 =1325.4 N/m2 = 135.11 kg/m2 WIND FORCE ACTING ON THE TANK SHELL =Pz x O.D x Height x SHAPE FACTOR(0.7) = 4252.5 kg CORRESPONDING WIND MOMENT AT BASE M WIND = Wind force x Height /2.0 = 15947kg.m

CALCULATION OF SEISMIC FORCE ( REF IS 1893 )


MOMENT AT BASE OF TANK = ZI { C1WsXs)+ (C1WrHt)+ (C1W1X1) +(C2W2X2)} WHERE, Z = SEIMIC ZONE FACTOR = 0.2, I = IMPORTANCE FACTOR = 1.5 C1 = LATERAL EARTHQACKE COEFFICENT = 0.60 (Ref. API 650 E 3.31 )

CALCULATION OF SEISMIC FORCE ( REF IS 1893 ) (Contd.)


CONSTANT D = 19.68 ft, H = 24.60 ft D/H= 0.8 FACTOR K = 0.58 ( REF API 650 FIG E 4 ) NATURAL PERIOD OF THE FIRST SLOSHING MODE, SECOND T = K ( D ) 0.5 = 0.58 ( 19.68 ) 0.5 = 2.57 sec < 4.5 sec SITE COEFFICIENT S = 1.5 HENCE LATERAL FORCE COEFFICIENT C2 = 0.75 S/T = (0.75) x 1.5/2.57 = 0.4377

CALCULATION OF SEISMIC FORCE ( REF IS 1893 ) (Contd.)

CONSTANT OPERATING WEIGHT, WT = 185.30 Te = 185300 kg = 407660 lbs H = MAXIMUM DESIGN LIQUID LEVEL = 24.60 ft REF FIGURE E2 API 650 FOR D/H VALUE OF 0.8, EFFECTIVE MASSES W1 /WT = 0.82 W1 = 0.82 x WT = 0.82 x 407 = 334281.20 lbs W2 /WT = 0.24 W2 = 0.24 x WT = 0.24 x 407660 = 97838.40 lbs REF FIGURE E3 API 650 FOR D/H VALUE OF 0.8, CENTROID OF SEISMIC FORCE X1 /H = 0.44 X1 = 0.44 x 0.24 = 10.824 ft X2 /H= 0.75 X2 = 0.75 x 0.24 = 18.45 ft

WS = TOTAL WEIGHT OF TANK SHELL = 8216 kg = 18075.20 lbs

CALCULATION OF SEISMIC FORCE ( REF IS 1893 ) (Contd.)


CALCULATION OF C.G. OF SHELL
HT OF COURS E (cm) 250 125 125 125 125 -

SHELL COURSE t1 t2 t3 t4 t5 TOTAL

THICKNESS (cm)

AREA (a) cm2

DISTANCE OF CG (Y) FROM BOTTOM (cm) 125.00 312.50 437.50 562.50 687.50 -

ay

1.0 0.6 0.6 0.6 0.6 -

250 75 75 75 75 550

31250.00 23437.50 32812.50 42187.50 51562.50 181250.00

CALCULATION OF SEISMIC FORCE ( REF IS 1893 ) (Contd.)


DISTANCE OF C.G. FROM BOTTOM XS = a1y1+a2y2+a3y3+a4y4+a5y5 a1+a2+a3+a4+a5 = 181250 550 = 329.545 cm = 10.81 ft HT = ACTUAL HEIGHT OF TANK = 24.60 ft Wr = WEIGHT OF TANK ROOF = 1130 kg = 2486 lbs M = ZI { (C1WsXs) + (C1WrHt) + (C1 W1 X 1) + (C2W2X2) } ZI = 0.2 x 1.5 = 0.3 C1WsXs = 0.6 x 18075.20 x 10.81 = 117235.75 C1WrHt = 0.6 x 2486 x 24.60 = 36693.36 C1W1X1 = 0.6 x 334281.20 x 10.824 = 2170955.82 C2W2X2 = 0.4377 x 97838.40 x 18.45= 790100.35 SUM= 3114985.28

CALCULATION OF SEISMIC FORCE ( REF IS 1893 ) (Contd.)


TURNING MOMENT AT BOTTOM OF THE SHELL (SEISMIC) M = 0.3 x 3114985.28 = 934495.6 lbs ft = 127431.21 kg-m THE MOMENT DUE TO SEISMIC IS MORE THAN MOMENT DUE TO WIND (M WIND=15946.88 kg m), (Ref. Page 1), HENCE SEISMIC MOMENT IS GOVERNING FOR DESIGN OF PAD AND RING BEAM. CHECK OF PRESSURE AT TANK PAD CASE-1 = TEST WEIGHT CONDITION Pt = WH /A WH = TOTAL TEST WEIGHT = 215.30 Te A = (/4) D2 = 28.26 m2 Pt = 215.30/ 28.26 = 7.62 T/m2 < 20 T/m2 THE TANK IS RESTING ON COMPACTED SAND FILLING SO SBC OF COMPACTED SAND SHALL NOT BE LESS THAN 20 T/m2

CALCULATION OF SEISMIC FORCE ( REF IS 1893 ) (Contd.)


CASE-2 = OPERATING WEIGHT + SEISMIC FORCE Pressure at tank pad, Po = WT/A + M/Z Z = I/Y = (D^4 /64)/(D/2) = (D3) / 32 = 3.14 X 6^3 32 = 21.195 m3 HERE WT = 185.30 Te = 127.43 Te.m = (185.30/ 28.26) + (127.43/ 21.195) = 6.55 + 6.01

M Po

Po1 = 12.56 Te/m2 < 1.25 X 20 = 25 Te/m2 (PERMISSIBLE PRESSURE IS INCREASED BY 25% FOR SEISMIC CONDITION) Po2 = 0.54 Te/m2 , SINCE Po2 IS +VE, NO UPLIFTING OF TANK

CHECK OF SOIL PRESSURE AT BOTTOM OF RING BEAM AT 2.0 m DEPTH BELOW FGL

COMPACTED SAND

CHECK OF SOIL PRESSURE AT BOTTOM OF RING BEAM AT 2.0 m DEPTH BELOW FGL.
FOR CASE 1 (TEST WEIGHT CONDITION) TANK PAD LEVEL IS KEPT 1200 mm ABOVE FINISHED GROUND LEVEL. DENSITY OF SAND TAKEN AS 1.8 t/m3 (Ref. Soil handbook) NET PRESSURE AT FOUNDATION LEVEL Ptf = 7.62 + 1.2 x 1.8 = 9.78 Te/m2 < 13.6 Te/m2 (SBC AT 2.0 m BELOW FGL) FOR CASE 2 (OPERATING WEIGHT + SEISMIC) Pof = 12.56 + 1.2 x 1.8 = 14.72 Te/m2 < 1.25 x 13.60 = 17.0 Te/m2 THE ALLOWABLE SHALL BE 17.0 Te/m2 UNDER SEISMIC CONDITION AS PER EIL STANDARD NET ALLOWABLE PRESSURE OF THE SOIL AT THE FOUNDING LEVEL OF RING WALL pt = w x H + 1.8 x h1 HERE w = DENSITY OF FLUID (t/m3); 1.00 t/m3 FOR WATER H = 7.5 m ; h1 = 1.2m pt = (1.0 x 7.5) + (1.8 x 1.2) = 9.66 Te/m2 < 13.60 Te/m2 HENCE O.K.

R.C.C. DESIGN OF RING BEAM

SAND

R.C.C. DESIGN OF RING BEAM


MAXIMUM PRESSURE AT PAD LEVEL = 12.56 Te/m2 SAY 12.6 Te/m2 EQUIVALENT HEIGHT OF SAND (HI) = 12.6/1.8 = 7 m H = 2.0 + 1.2 = 3.2m, D = 6.0 0.3 = 5.7m LATERAL PRESSURE DUE TO FILLED SAND p1 = KA.Y.H = 1/3 x 1.8 x 3.2 = 1.92 Te/m2 LATERAL PRESSURE DUE TO SURCHARGE LOAD p2 = KA.Y.HI = (1/3) 1.8 x 7 = 4.2 Te/m2 TOTAL LATERAL PRESSURE AT BOTTOM OF RING BEAM P = p1 + p2 =1.92 + 4.2 = 6.12 Te/m2 = 6120 kg/m2 HOOP TENSION = P x d/2 = 6120 x 5.7/2 = 17442 kg/m AREA OF STEEL OF HOOP TENSION (At) = 17442/2300 = 7.6 cm2/m USE 12 AS CIRCULAR RING BAR AREA OF 12 = 1.13 cm2 (at) SPACING OF BAR = (at /At) x 100 = 1.13 x 100/7.6 = 14.9 cm c/c AS PER API 650 MIN LOOP TENSION AREA = 0.0025 x THICKNESS = 0.0025 x 30 x 100 = 7.5 cm2/m HENCE PROVIDE 12 @ 150mm c/c AS CIRCULAR RING BAR. VERTICAL REINFORCEMENT AS PER API 650 MINIMUM AREA OF STEEL FOR VERTICAL BAR = 0.0015 x 30 x 100 = 4.5 cm2 USE 12 at = 1.13 cm2 SPACING OF BAR = 1.13 x 100/ 4.5 = 25.11 cm c/c PROVIDE 12 @ 200mm c/c AS VERTICAL BAR REINFORCEMENT IN OUTER FACE OF BEAM PROVIDE SAME REINFORCEMENT AS CALCULATED ABOVE WHICH IS MORE THAN NOMINAL REINFORCEMENT REQUIRED FOR TEMPERATURE AND SHRINKAGE ETC.