Professional Documents
Culture Documents
X Cap
X Cap
2010/04/21 Jerry Lu
Our target
Optimization 2
-75 dBm
Optimization 1
14dB
Main working object: CINR of CPE Our information was from : 1. Drive test login data 2. Customers complaint 3. WSM system data
Copyright 2007, Global Mobile Corp.
CINR is poor:
1.Poor coverage
blocking (shadow)
too far from RAS
CINR is poor:
How to do :
no dominate server
too many carrier in the same area
1 A C 3 4 B 2
Optimization 1 : 1,2,3,4
Optimization 2 : A,B,C
Optimization 1
CINR is poor& RSSI is poor
CPE CINR< 7
The KPI we used before. We cant identity where is the poor coverage problem area.
CPE CINR< 7
CPE CINR< 14
CPE RSSI<-75,CINR< 14
RSSI <-75
CPE CINR< 14
4 2 3
4 2
According to RSSI will attenuate by distance We filter the sample points too far from RAS
Optimization 2
CINR is poor & RSSI is Good
10
RSSI >-75
CPE CINR< 14
1 A C 4 B 3 2
RSSI CINR
-65 25
-70 20
-75 15
-80 10
-85 5
Copyright 2007, Global Mobile Corp.
11
Scanner Best Server Top1 Preamble power Filter: Top1 Channel = 396 (2600.00MHz) Top 2 Channel = 396 (2600.00MHz) Top 1 preamble Power >-75 Top 2 preamble Power >-80 Interference is not in 2600 this area.
A C B
12
Scanner Best Server Top1 Preamble power Filter: Top 1 Channel = 436 (2610.00MHz) Top 2 Channel = 436 (2610.00MHz) Top 1 preamble Power >-75 Top 2 preamble Power >-80 Interference is not in 2610 this area.
A C B
13
Scanner Best Server Top1 Preamble power Filter: Top1 Channel = 476 (2620.00MHz) Top 2 Channel = 476 (2620.00MHz) Top 1 preamble Power >-75 Top 2 preamble Power >-80 Interference is in 2620 this area.
A C B C
A B
14
A C C
A B
15
Attentopn: 1. We still have to take care mapping nothing area. 2. The CINR should be good near the RAS.
SCN Top1>-75,TopN>-80
CPE CINR< 7
16
PI 57 PI 24
Change 110004FA_ID
A B
PI 77
PI 24
Change
110004FA_ID
17
Recommend 1
Filter setting
Urban (Taipei city) :
Top1>-75,TopN>-80
Suburban (Hsinchu) :
Top1>-80,TopN>-85
18
Recommend 2
We get to know some information when we analysis problem in this area. 1. CINR of CPE quality information 2. RSSI of CPE power information 3. Preamble Index of CPE coverage of RAS 4. BS-ID of CPC coverage of sector 5. RSSI of Scanner best server Top1 & TopN (N=2,3) for optimization reference
19
CPE RSSI
CPE CINR
Optimization 2
RSSI
CPE RSSI<-75,CINR< 14
CINR
Optimization 1
20
A C B
CPE BS-ID
21