Maintenance of Distribution
Maintenance of Distribution
SAFETY
Before carrying out any maintenance work, all the safety procedures should be strictly adhered to. SAFETY FIRST,SAFETY NEXT,SAFETY ALWAYS
Replacement of burnt out lead wires. Load balancing on all three phases. Peak load recording on transformers at least once in a week. Load condition Balancing of loads.
Alignment of G.O.S unit. Replacement of entire unit if even one limb gets worn out / burnt out.
Maintenance of UG Cable.
Avoid overload.
Observe for crack, damage, etc in cable termination/Pothead.seal them using M-seal compounds wherever necessary.
Replacement of burnt out/ worn out spares immediately. Cleaning of contacts, spout insulators. Checking of tripping mechanism.
Service mains
All meter terminal covers should be sealed. Grounding at the meter board and at sealable cutouts should be properly done by the consumer as per norms and this has to be verified periodically. Inspection of meters- MNR,sticky meters,direct connections to be immediately reported and action taken . Any defects noticed in the consumers premises after the point of commencement of supply,to be brought to the notice of the consumer.