SSV DT

You might also like

Download as pptx, pdf, or txt
Download as pptx, pdf, or txt
You are on page 1of 18

Network statistics

SSV DT Handling and Plots SSV KPI Handling

SSV DT REPORT PROCESS

6th

Sept 2012

Objectives

To understand and maintain uniformity of SSV Reports Facilitate smooth approval of Reports by Customer Easy handling of SSV reports

SSV DT Tools and software

Tools and Software Software Probe version(V200R003C01SPC300) Assistant version 3.3 soft dongle type Auxiliary softs(Franson Gpsgate etc.)

Tools Laptop(P/A software installed) E270 Data card Phones + USB cables(U120E, U6100 or U8800) GPS Inverter Compass Audit tools(tape measure, inclinometer, camera etc)

Things to note
Initial Optimization both RF and KPI optimization should be performed on new sites before, during and after SSV DT. Improve coverage and quality if bad If changes are done, do show previous data and the data after impact of change. If for example there was a swap on site, DT plot should be generated for before and after the swap correction as evidence. Before SSV, DT engineer should predict possible routes on Google earth to test all three sectors as best as possible. If all three sectors are not driven due to certain issues it should be stated and backed by evidence such as pictures in report. Audit & site changes must be done and well noted before DT. All changes(azimuth , swap, tilt, coordinates) done on site which are different from planned data should be logged in the SSV Audit Tracker

Lock Band before SSV DT is done Drive should continue until handover or coverage becomes poor , DT should be in limit of 1.5Km Throughput Data information should be displayed using strictly Probe.

SSV General Flow


Live Site Parameter/KPI monitoring

NPO Planning

SSV Audit Tracker

Perform SSV DT
SSV Report

Log files

NPO Server

BSC owner Review


SSV Report rejected SSV Report approved

Victor Review
SSV Report rejected SSV Report approved

VDF Review

SSV Report approved

PAC

SSV Process
SITE INFORMATION
Market Site name,Site ID/Cluster ID Latitude/Longitude General location Date BTS Type Site Config VF Project EKUASI, WEB7311 / WE_TAK_BSC01
4.930167/ -1.725833

Western Region 12-22-2011 DBS3900 S2/2/2

ANTENNA INFORMATION
Cell ID
17311 27311 37311

Antenna type
80010122 80010122 80010122

Mech tilt
0 0 0

Elect Tilt
4 4 4

Azimuth
80 220 330

RF Height
23.4 23.4 23.4

CELL PARAMETER

Cell ID

BCCH

TCH

MAIO

HSN

17311 27311 37311

48 53 57

61;62;63;64;65;66;67;68;69;70;71;72;73;74;75;76;77;78;79;80;81;82;83 61;62;63;64;65;66;67;68;69;70;71;72;73;74;75;76;77;78;79;80;81;82;83 61;62;63;64;65;66;67;68;69;70;71;72;73;74;75;76;77;78;79;80;81;82;83

0 2 4

0 0 0

These tables should be filled carefully to conform with planned parameters(Asset/ITI DB). Audit should be done on site and if there is any variation on site especially with coordinates, azimuth, Mech tilt, antenna type and height it should be well noted and corrected. Issues concerning coordinates should be feedback to planning.

DT Plots 1. CELL ID DISTRIBUTION


Display cell ID along routes served by respective sectors

Synchronize sector colour with plots in assistant and note to resolve sector swap. Display Cell ID for sectors

Display site name

The cell ID distribution plot should be generated as above taking note of scale, legend and grid lines, before DT is performed DT engineer should first check for sector swap and take audit on site and compare with Asset/ITI DB. DT should be done to test all three sectors as best as possible. If all three sectors are not all tested due to unavailability of access route it should be commented and backed with snapshots from Google earth or pictures taken from site. Note that DT should begin from the site.

2. C/I ON BCCH CARRIER

gend should be in this mat.

The C/I on BCCH Carrier plot should be generated as above taking note of scale and grid lines.

3. RXLEV_SUB

Legend should be in this format. It is very important

The Rxlev_Sub plot should be generated as above taking note of scale, legend and grid lines. Before DT is performed DT engineer should confirm azimuth with Asset/ITI DB. DT should be done to test all three sectors as best as possible. Coverage is of the highest priority in SSV DT and so should be noted well, if coverage is poor DT engineer should try to improve or comment to explain issue in report and make recommendations as like the example shown in the next slide

The rxlev(coverage) was poor within that area and report could have been rejected but with comments indicating an undulating terrain backed by snapshots from Google Earth which was added to the report as remarks rectified the problem and report was finally approved. And so when DT engineer encounters such problems it should be well noted

RX LEVEL_SUB TABLE AND GRAPH Legend Count 497 140 375 Percentage(%) 23.20 6.54 17.51

-64dBm ~ -10dBm -68dBm ~ -64dBm -73dBm ~ -68dBm -78dBm ~ -73dBm -85dBm ~ -78dBm -100dBm ~ -85dBm Total

220
470

10.27
21.94

440
2142

20.54
100.00

Rx_Level(Sub) 100.00

2000 1500

60.00 1000 500 0 -64dBm ~ - -68dBm ~ - -73dBm ~ --78dBm ~ - -85dBm ~ - -100dBm ~ 10dBm 64dBm 68dBm 73dBm 78dBm -85dBm Discrete Cummulative 40.00 20.00 0.00

The Rxlev_Sub Table and Graph samples should be generated exactly as shown above with the correct Legend as displayed on the rxlev_sub plot.

Percentage(%)

80.00

Counts

4. RXQUAL_SUB
Legend should be in this format. It is very important

The RxQual_Sub plot should be generated as above taking note of scale, legend and grid lines.

RXQUAL_SUB TABLE AND GRAPH

Legend 0~4 4~6 6~7 Total

Count
2098 181 81

Percentage(%)
88.9 7.67 3.43

2360

100

The RxQual_Sub Table and Graph samples should be generated exactly as shown above with the correct Legend as displayed on the rxqual_sub plot. Use graph template sheet to aid to generate samples as same as in the rxlev_sub samples.

4. HANDOVER EVENT PLOT

The handover pictogram should be displayed clearly with a visible font size

Legend should be in this format. It is very important

Legend showing count of successful Handovers should be in this format as well. It is very important

The HANDOVER EVENT plot sholud be generated as shown above taking note of legend, scale and grid lines. Intercell Handover sholud be shown as best as possible. If there are pingpong handovers due to overshooting or between intercells DT engineer sholud take note to correct the problem or add remarks to explain the issue.

PS Data should be done using strictly Probe and data graphs should be displayed as shown in sample below:

EDGE

Throughput (DL) Data

Data Download Thresholds

Type of Download Data Transfer


Total Download Size
EDGE >= 2MB GPRS >=1MB

Maximum Transfer Rate


Download Average Rate

<300kbps
<=215kbps

<70kbps
<=60kbps

Data download thresholds must be in range as shown above as monitored in Probe

SSV KPI
KPI statistics should be queried for 5 days If KPI statistics for a site dont meet threshold it should be escalated to BSC owner to rectify problem. At the last section of the SSV report, the summary heading DT engineer should change site ID to that of the respective site.
KPI
Call Setup Success Rate Handover Success Rate Call Drop Rate CS SDCCH Drop Rate TCH Congestion Rate SDCCH Congestion Rate TCH Traffic DL TBF Estab Success

Target
98% 95% 2% 2% 2% 2% N/A 98%

Sample ssv report

DL TBF Drop
PS UL TBF Estab Success HW_UL TBF Drop

6%
98% 6%

THANK YOU

You might also like