Ppap Guidelines For Submission: Supplier Production Part Approval Process
Ppap Guidelines For Submission: Supplier Production Part Approval Process
Ppap Guidelines For Submission: Supplier Production Part Approval Process
PACKAGE WILL BE SUPPLIED FREE OF CHARGE DOCUMENTATION MUST BE IN ENGLISH PURCHASE ORDER # INCLUDED ON PACKING SLIP & PSW SHEET SAMPLES OF PARTS AS REQUIRED SIGNED WARRANT FROM SUPPLIER CORRECT SUBMISSION LEVEL PER HEC PURCHASING
CHANGE IN SUB-SUPPLIER
TAB 1 REQUIREMENTS
SAMPLE PARTS WITH APPROPRIATE IDENTIFICATION MULTIPLE CAVITY TOOLING WILL REQUIRE SAMPLES FROM EACH CAVITY
TAB 2 REQUIREMENTS
CURRENT RELEASED XXXXX DRAWING NUMBERED TO CORRESPOND WITH DIMENSIONAL LAYOUT
10
TAB 3 REQUIREMENTS
LAYOUT RESULTS INCLUDING ALL BLUEPRINT NOTES
11
TAB 4 REQUIREMENTS
MATERIAL / FUNCTIONAL RESULTS
12
TAB 5 REQUIREMENTS
APPEARANCE APPROVAL FORM (IF APPLICABLE) SEE NEXT SLIDE FOR EXAMPLE
13
14
TAB 6 REQUIREMENTS
PROCESS CAPABILITY STUDIES / CPK REPORT (IF APPLICABLE) SEE NEXT SLIDE FOR EXAMPLE
15
16
TAB 7 REQUIREMENTS
PROCESS CONTROL PLAN (IF APPLICABLE) FORMAT PER AIAG MANUAL ADVANCED PRODUCT QUALITY PLANNING AND CONTROL PLAN (APQP)
17
TAB 8 REQUIREMENTS
PROCESS PFMEA (IF APPLICABLE) FORMAT PER AIAG MANUAL POTENTIAL FAILURE MODE AND EFFECTS ANALYSIS (FMEA THIRD EDITION)
18
TAB 9 REQUIREMENTS
DESIGN DFMEA (IF APPLICABLE) FORMAT PER AIAG MANUAL POTENTIAL FAILURE MODE AND EFFECTS ANALYSIS (FMEA THIRD EDITION)
19
TAB 10 REQUIREMENTS
GAGE STUDIES AS REQUIRED BY HEC QUALITY ENGINEERING PER AIAG MEASUREMENT SYSTEMS ANALYSIS (MSA)
20
TAB 11 REQUIREMENTS
FLOW CHART OF PROCESS PER AIAG ADVANCED PRODUCT QUALITY PLANNING AND CONTROL PLAN (APQP) MANUAL
21
TAB 12 REQUIREMENTS
PURCHASE ORDER NUMBER AND TOOL NUMBER (IF APPLICABLE)
22
TAB 13 REQUIREMENTS
AIAG PPAP WARRANT PAGE SEE NEXT SLIDE FOR EXAMPLE
23
24
TAB 14 REQUIREMENTS
SUPPLIER REQUEST FOR ENGINEERING APPROVAL (SREA) SEE NEXT SLIDE FOR EXAMPLE
25
26
TAB 15 REQUIREMENTS
CHANGE IN APPROVAL STATUS (CAS) IF APPLICABLE SEE NEXT SLIDE FOR EXAMPLE
27
29
TAB 18 REQUIREMENTS
IMDS REGISTRATION REQUIREMENTS MUST BE APPROVED BY IMDS COORDINATOR
30
TAB 19 REQUIREMENTS
PACKAGING APPROVAL FORM (IF APPLICABLE) SEE NEXT SLIDE FOR EXAMPLE
31
32
TAB 20 REQUIREMENTS
SERIES TEST REPORT OR SPECIAL CHARACTERISTICS LIST