Professional Documents
Culture Documents
L
L
CONSTRUCTION INDUSTRY
BY
E.MOHANRAJ
Senior Project Manager, L & T
MODERN TRENDS IN ROADS
CONSTRUCTION INDUSTRY
ECONOMIC DEVELOPEMENT
PROJECT MANAGEMENT
RESOURCE MANAGEMENT
MODERN TECHNOLOGY AND
CONSTRUCTION METHODS
MODERN TREND IN WORLD
DEVELOPEMENT
Economic development
– GDP( Gross Domestic Product) GROWTH
INDIAN GDP growth in past 3 Yrs.
Growth Rates of Real GDP
(Base Year : 1999-2000) (Per cent)
2000-01 to
2004-05 2005-06
2003- 2004- 2005-
Sector
2002-03 04 05 06 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
(Average
Agricu -0.2 10.0 0.7 3.9 3.5 -0.2 -1.2 1.5 3.4 4.0 2.9 5.5
lture
Indust 5.2 6.6 7.4 6.6 8.0 8.1 6.8 9.5 6.3 7.0 7.9
ry
Servic 6.6 8.5 10.2 10.3 10.0 8.2 10.6 11.6 10.1 10.3 9.7 11.0
es
3.4 5.9 10.9 12.5 12.1 8.9 6.8 20.8 13.5 12.4 12.3 11.5 12.0
Constr
uction
Real 4.6 8.5 7.5 8.4 7.9 6.7 7.0 8.6 8.5 8.4 7.5 9.3
GDP
at
Factor
Cost
Size
India has an extensive road network of 3.3 million kms –
the second largest in the world
4. Roads carry about 61% of the freight and 85% of the
passenger traffic
5. Highways/Expressways constitute about 66,000 kms
(2% of all roads) and carry 40% of the road traffic
6. The Government of India spends about Rs.18000
crores (US $ 4 billion) annually on road development
PRESENT TREND IN INDIAN
ROADS
4. The ambitious National Highway Development Project
(NHDP) of the Government is at an advanced stage of
implementation. Key sub-projects under the NHDP
include:
a. The Golden Quadrilateral (GQ-5846 kms of 4
lane highways)
b. North-South & East-West Corridors (NSEW-
7300 kms of 4 lane highways)
THE SPECIFICATION
– the clarity will reveal misunderstandings
– the completeness will remove contradictory
assumptions
Guesstimation
– make your guesstimates of the simple tasks at the
bottom of the work break down structure and look
for the longest path through the sequence diagram
– use the experience from previous projects to
improve your guesstimating skills
ESTABLISHING CONTROLS
– milestones (clear, unambiguous targets of what, by
when)
– established means of communication
PROJECT MANAGEMENT
ESTIMATE
– STANDARDISING AND TRANSFERING THE DETAILS OF
INITIAL PROJECT REPORT(DPR)
– FOLLOWING MARK NUMBER CONCEPT
PLANNING TOOLS
– PRIMAVERA
– MSPROJECT
ONLINE MONITORING
– IT ENABLED MONITORING SYSTEM- CEMA-EIP
NEUTRAL CONTRACTUAL CONDITION
– FIDIC
– MORTH
TRAINING
MODERN TRENDS IN ROADS
CONSTRUCTION
ECONOMIC DEVELOPEMENT
PROJECT MANAGEMENT
RESOURCE MANAGEMENT
MODERN TECHNOLOGY AND
CONSTRUCTION METHODS
RESOURCE MANAGEMENT
USE OF NEW HIEGHER CAPACITY EQUIPMENT
– EXCAVATOR
– MOTORGRADER
– SOIL COMPACTOR
– SENSOR PAVER
– HOT MIXPLANT
– WMM PLANT
– CONCRETE BATCHING PLANT
– TRANSIT MIXERS
– BOOM PLACER
– TRAILER TIPPERS
Latest Resources Applications
Bitumen Pressure
Drum Mix Plant Distributor
Available from 15 Spraying width
TPH to 120 TPH from 2.4 to 9 mtr.
Capacity. by extension bar.
Mr.A.M.Naik
(During Project Lakshya-HR speech)
PLANNING & MONITORING –
FRAME WORK IN ECC Division
PC at Project Site
In Web
www.lntecc.com
Knowledge Management
L&T Coloured Concrete
Background
In the past when architects and designers mentioned concrete, people rarely
got excited. It usually meant a dull, grey, visually unappealing appearance.
Today though, thanks to new technological advances, concrete can be cast in a
variety of finishes and colours offering architects and the construction
industry a material that is both eminently practical and aesthetically pleasing.
Coloured Concrete
We are using world class pigments for producing Coloured Concrete which
has following characteristics.
QC QA QMS
PLANNING
SURVEY
FABRICATION
PROCESS CONTROL
REINF. YARD
STORES
QC LAB
MR
Date Legend
Prepared by Next Rev. Holidays
QM-Dept. Audit Planned
Approved by MR Latest Rev. Audit performed
Construction Quality Assessment System
CONQUAS
The Construction Quality Assessment System or CONQUAS
was developed by the Building and Construction Authority
(BCA) in conjunction with the major public sector agencies
and the various leading industry professional bodies to
measure the quality level achieved in a completed project.
Blood Donation
Medical Checkup
Weekly visit by a doctor to
labour camp.
3M - MEN MACHINE & MATERIAL
Inspection of condition
Storage
Maintenance of MSDS
MATERIAL
Access and Egress
FREQUENCY RATE OF ACCIDENT AND MANHOURS WORKED
500 4.00
Manhours worked (in Millions)
450
3.50
400
3.00
350
2.50
300
250 2.00
200
1.50
150
1.00
100
0.50
50
0 0.00
1995- 1996- 1997- 1998- 1999- 2000- 2001- 2002- 2003- 2004- 2005-
1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006
Manhours Worked 225.1 267.2 306.6 375.5 320 278.8 283.6 332.6 377.9 447.5 454
Frequency Rate 3.79 3.02 2.04 1.53 1.40 1.28 1.04 0.8 0.59 0.44 0.34
Company A 2.72
Company B 2.01
E&C Division 0.25
Incident happen just
because we see things differently
PHOTOGRAPHS
53m span bowstring girder arch bridge at Irugur on Coimbatore bypass in Tamil Nadu.
World-class concrete slipform paving machine in operation on Mumbai - Pune
Expressway
Intersection on the 162km Sambalpur - Rourkela expressway in Orissa.
24km concrete-paved six-lane Mumbai-Pune
Expressway in Maharashtra.
4 laning of existing 2-lane carriageway from
Kancheepuram to Walajahpet in Tamil Nadu.
4 laning of Satara - Kolhapur road for MSRDC
Ghat section of 8.4km Khandala-Lonavala bypass.
A section of 28 km Coimbatore bypass road
Six lane expressway - Jaipur - Kishangarh Road Project
Toll Plaza at Jaipur for Jaipur - Kishangarh Road Project.
THANK YOU