Professional Documents
Culture Documents
Handover Optimisations
Handover Optimisations
February 13 2008
0. Inter-system Measurements 1. Decision to perform SRNS Relocation (UE Involved) 2. Relocation Required 3. Relocation Request Establishment of Radio Access Bearers 3. Relocation Request Ack 4. Relocation Command 6a. HO FROM UTRAN COMMAND (25.331) [incl. RADIO BEARER RECONFIGURATION] 5. Forwarding of data 7. Forward SRNS Context 7. Forward SRNS Context 6b. Handover Access (44.160) 6c. Physical Infomation (44.160) 6d. RADIO BEARER RECONFIGURATION COMPLETE (44.118) 8. Relocation Detect
HO Preparation Phase
HO Execution Phase
MAC
MAC
RRC
9. Relocation Complete
6b. Han d
o ve r Ac
270 ms
cess (o n DCH )
250+20 ms
6 c.
l Inform Physica
ation (o
n PD C H
8. Relocation Detect
6 d . Rad
io Beare
r R e co n
figuratio
n C o mp
lete (on
DCH )
270 ms
250 ms
9. Relocation Complete
No Activation Time
RNC Handover Handover to SAS
50 mS
UAS
U-IMS
N-IMS
SAS
S-BSS
Synchronisation
Handover Access
Uplink Disruption 2120 mS Downlink Disruption 1850 mS Physical Information
50 + 20 mS 270 mS 60 mS 60 mS
OK
270 mS
Downlink Restarted
Uplink Restarted
270 mS
+ SAS processing 50 + Satellite Synchronisation 160 + 100 mS + Handover Access propagation 270 mS + S-BSS Timing calculation 250 + 20 mS + Physical Information Propagation 270 mS + Satellite Reconfiguration 320 + 20 mS + SAS Processing 50 + 20 mS + RBR Propagation 270 mS + VoIP Reconfiguration DL:390 / UL:660 mS + Trigger Re-Invite 60 mS + Network reconfiguration 60 mS + Downlink RTP propogation 270 mS + OK propagation 270 mS + Uplink RTP propagation 270 mS
What can we do
+ Problem is sequential nature of activities + Network signals Activation Time for Handover + Move VoIP reconfiguration forward into Activation Period
+ Use ATC network for VoIP reconfiguration + High speed connection low transmission time + Close to RNC low propagation time
+ Voice maintained to Activation time + No VoIP reconfiguration to perform on (slow) SAT network
Handover Optimisations Peter Price Feb 13 2008 Page 6
UAS
U-IMS
N-IMS
SAS
S-BSS
Synchronisation Handover Access Uplink Disruption 1460 mS Downlink Disruption 1730 mS Physical Information
270 mS 50 + 20 mS 270 mS 160 + 100 mS
270 mS
250 + 20 mS
270 mS
1000 + 120 mS
50 160 + 100 mS 270 mS 250 + 20 mS 270 mS
+ Satelite Reconfiguration
+ SAS Processing + RBR Propagation
320 + 20 mS
50 + 20 mS 270 mS
+ VoIP Reconfiguration
+ Downlink RTP propogation + Uplink RTP propagation
Handover Optimisations Peter Price Feb 13 2008 Page 8
DL:270 / UL:0 mS
270 mS 0 mS Small Uplink Improvement 120 mS
+ Voice maintained to Activation time + Shorter delay in SAT system + No VoIP reconfiguration to perform on (slow) SAT network
UAS
U-IMS
N-IMS
SAS
S-BSS
Re-Invite
120 mS
Synchronisation
Handover Access
OK Physical Information
270 mS
Activation
Uplink Disruption 340 mS Downlink Disruption 630 mS Uplink Restarted Downlink Restarted
270 mS
RBR Complete
50 + 20 mS 270 mS
320 + 20 mS
50 + 20 mS 270 mS
+ VoIP Reconfiguration
+ Downlink RTP propogation + Uplink RTP propagation
Major Downlink Improvement 1000 + 120 ms
DL:270 / UL:0 mS
270 mS 0 mS Major Uplink Improvement 1000 + 120 mS
Optimal Solution
Handover Optimisations Peter Price Feb 13 2008 Page 11
Potential Problems
+ Activation Time >1200 mS required
+ Could lose ATC cell before activation time
+ Will not always happen + No worse than original case
UAS
U-IMS
N-IMS
SAS
S-BSS
Re-Invite
120 mS
Synchronisation
160 + 100 mS
OK
Handover Access
270 mS 250 + 20 mS
Physical Information
270 mS
Activation
Uplink Disruption 340 mS Downlink Disruption 630 mS Uplink Restarted
270 mS
RBR Complete
50 + 20 mS 270 mS
Downlink Restarted
Changes Required
+ UMTS AS
+ Modify handling of Handover to allow overlap + Additional state(s) for handling IMS + Additional state(s) for handling PDP Context reconfigure
+ SAT AS
+ Additional state(s) to handle Timing Acquistion synchronisation + Additional state(s) to handle Activation Time synchronisation
+ SAT Layer 1
+ Preemption control of ATC Layer 1
+ Network
Handover Optimisations Peter Price Feb 13 2008 Page 15