HSEQ Prestentation PMT Project

You might also like

Download as pptx, pdf, or txt
Download as pptx, pdf, or txt
You are on page 1of 18

1

KESC Engineering & Construction Department.

Safety of PMT Project.


Toolbox Talk of AEs, Supervisors & representative of the contractor before execution of work at site (Both formats .i.e. Toolbox Talk Form & Safety inspection forms provided by HSEQ Department to be properly understood & filled by the personal that will be present at the site). Qualification of Personnel of the contractor should be according to the trade.
3

Step 1: Identify the hazards. Step 2: Decide who might be harmed and how. Step 3: Evaluate the risks and decide on precautions. Step 4: Record your findings and implement them. Step 5: Review your assessment and update if necessary.
4

When working on O/H Lines (H.T, L.T & Installation of PMT)

Risks Assessment:
Electrocution of Personal. Falling from heights. Falling of tools & Tackles from heights. Return of supply from consumer ends (UPS, Generators etc.) Worse conditions of working tools .i.e. rust on metals, improper & weak insulations. Hopeless condition of existing network while dismantling job is to be done. Lines not properly grounded or de-energized.
5

When working on U/G Cables (H.T & L.T)

Risk Assessment:
E l e c t r o c u t i o n o f P e r s o n a l .

P i c k a x i n g o f U / G c a b l e ( H .T & L .T ) w h i l e e x c a v a t i o n , i s d o n e f o r erection of poles, identification of U/G cable for jointing or just simple excavation for laying of U/G Cable fair chances of flashovers & Tr i p p i n g o f f e e d e r s .
D a m a g i n g Lines etc. of Gas Pipes, Water

D u e t o w e i g h t o f t h e C a b l e D r u m & H .T c a b l e 3 0 0 m m 2 i t s h a n d l i n g could be risky if not properly handled.

By Engr. Naveed Memon

Safety Measures for minimizing or mitigating the Risks & Hazards.


Proper & Regular Toolbox talk with AEs, Supervisors & authorized personal of the contractors Proper isolation to prevent/mitigating electrocution of the personal. Safety equipments including safety belts, safety harnesses, safety helmets, proper safety dress, safety shoes & safety gloves must be used while working on O/H lines to minimize the Hazards & Risks. Lines properly grounded & de-energized. Cutting tools must be in good conditions while dismantling, safety gloves must be used along with other safety tools to avoid the risk of cutting. While excavation job for U/G cables is to be done safety uniform including safety shoes, gloves & safety helmet with visor must be worn to mitigate the risk of flashovers.
7

Safety Measures for minimizing or mitigating the Risks & Hazards.


Due to weight of the H.T Cable 300mm2 it must be handled with care. Test lamp must be included in tool box of the lineman. Proper use of safety signs & tags is pretty necessary. Work must be done in well synchronized manner between different department (Operations, SSM, Concerned NTW centers IBCs, VIBCs & UGM). Log book to be maintained for incidents God forbidden if occur.

Do & Donts:
Do the do's not the don'ts! Being safe is like breathing - you never want to stop. Do your work with pride, put safety in every stride. Don't be a fool, cause safety is cool, so make that your rule. Don't be a fool, use the proper tool.

Don't be safety blinded, be safety minded.


Don't fix the blame, fix the problem! Don't learn safety by accident! Don't lose your head to gain a minute! Every accident - every - time if it's predictable it's preventable!"
9

10

Q No.01: What is Safety?

A. Safety means working freely without following the safety rules set up by your company. B. Safety means a complete understanding of your work and knowledge of every step that must be taken and the realization that mistakes could be costly to yourself and to the company. C. Safety means working with following the safety rules set up by your company, but ignoring the importance of PPEs & SPEs. D. None of above.

Q No.02: How many Parts of Safety Oath of KESC (Safety Ahudnama)? A: 2 B: 3 C: 1 D: 0

Q No.03: What is Risk? A. B. C. D. State of Enjoyment State of Excitement State of Happiness A source of Danger
By Engr. Naveed Memon

11

Q No. 04.No: What is Hazard?

A. B. C. D.

Any source of Potential Damage Any source of Electric Shock Any source of Voltage None of above. Q No.05: What is the main reason(s) for electrocution for live line worker (Lineman)?

A. B. C. D.

Negligence in Shutdown Improper Isolation from live System Improper Grounding All of above.

Q No.06: While working on heights (e.g. pulling, jointing, of wires) what equipments are necessary to be used by a person? A. Insulated tools & Gloves B. Safety Belt, Full body Harness & Gloves C. PPEs & SPEs D. Safety Belt & Insulated Tools.

By Engr. Naveed Memon

12

Q No.07: What is the International Standard for using Full Body Harness while working on heights? A. B. C. D. Above 6 Feet At 6 Feet Below 6 Feet Both (a) & (b). Q No.08: What is Toolbox Talk? A. B. C. D. Telling a Story to a Site Supervisor Talking about working tools with Site Supervisor Talking about box of safety tools A kind of discussion before carrying out the Site work about, following safety rules, sort of work & sites conditions etc Q No.09: When TBT form is to be filled?

A. B. C. D.

execution of any kind of site work Middle of work After completion of site work There is no need of filling of TBT form before or after carrying out the work.
By Engr. Naveed Memon

13

Q No.10: While a person using/working on Bamboo Ladder it should be.. A. Kept against the wall only B. Should be held in position by at least a person standing near the feet of Ladder & tightened by a rope as well. C. Should be tightened by a rope D. Left Free Q No.11: It is very safe when working with electricity on slippery or wet surfaces. A. True B. False Q No. 12: What should be done if tools are not in good condition? A. B. C. D. Replace them Repair them (if required) Both (a) & (b) None of above

By Engr. Naveed Memon

14

Q No. 13: Use --------------- in case of Electric Fire. A. B. C. D. Dry Sand Wet Sand Carbon Powder Water. Q No. 14: When Lifting, Handling & Installation of PMTs are to be performed, what necessary checks are strictly to be done? A. B. C. D. E. Crane & Boom (Moving Arm of Crane)s conditions along with other PPEs. Over all Cranes Fitness. Crane Operators Experience. Fitness Certificate of Crane All of above.

Q No.15: Housekeeping is A. Neat & Clean Working Environment. B. Well-managed work place C. Communication Cables & Electric Appliances wires tied up neatly D. All of above.
By Engr. Naveed Memon

15

Q No.16: 100 near misses lead to one Major Accident.

A. True B. False
Q No.17: If proper Shut down is not arranged dont execute the Site job. A. True B. False \ Q No.18: What is First Aid? A. B. C. D. Initial Medical Treatment Full Medical Treatment Last Medical Treatment None of above. Q No.19: What are distribution Voltage Levels in KESC? A. B. C. D. 11 KV,& 415 Volts 11 KV & 220 Volts 415 Volts & 220 Volts None of above
By Engr. Naveed Memon

16

Q No.20: HSEQ is short form of

A. B. C. D.

Health, Safety, Exercise & Quality Health, Safety, Environment & Quality House, Safety, Environment & Quantity None of above.

By Engr. Naveed Memon