HSEQ Prestentation PMT Project
HSEQ Prestentation PMT Project
HSEQ Prestentation PMT Project
Step 1: Identify the hazards. Step 2: Decide who might be harmed and how. Step 3: Evaluate the risks and decide on precautions. Step 4: Record your findings and implement them. Step 5: Review your assessment and update if necessary.
4
Risks Assessment:
Electrocution of Personal. Falling from heights. Falling of tools & Tackles from heights. Return of supply from consumer ends (UPS, Generators etc.) Worse conditions of working tools .i.e. rust on metals, improper & weak insulations. Hopeless condition of existing network while dismantling job is to be done. Lines not properly grounded or de-energized.
5
Risk Assessment:
E l e c t r o c u t i o n o f P e r s o n a l .
P i c k a x i n g o f U / G c a b l e ( H .T & L .T ) w h i l e e x c a v a t i o n , i s d o n e f o r erection of poles, identification of U/G cable for jointing or just simple excavation for laying of U/G Cable fair chances of flashovers & Tr i p p i n g o f f e e d e r s .
D a m a g i n g Lines etc. of Gas Pipes, Water
Do & Donts:
Do the do's not the don'ts! Being safe is like breathing - you never want to stop. Do your work with pride, put safety in every stride. Don't be a fool, cause safety is cool, so make that your rule. Don't be a fool, use the proper tool.
10
A. Safety means working freely without following the safety rules set up by your company. B. Safety means a complete understanding of your work and knowledge of every step that must be taken and the realization that mistakes could be costly to yourself and to the company. C. Safety means working with following the safety rules set up by your company, but ignoring the importance of PPEs & SPEs. D. None of above.
Q No.03: What is Risk? A. B. C. D. State of Enjoyment State of Excitement State of Happiness A source of Danger
By Engr. Naveed Memon
11
A. B. C. D.
Any source of Potential Damage Any source of Electric Shock Any source of Voltage None of above. Q No.05: What is the main reason(s) for electrocution for live line worker (Lineman)?
A. B. C. D.
Negligence in Shutdown Improper Isolation from live System Improper Grounding All of above.
Q No.06: While working on heights (e.g. pulling, jointing, of wires) what equipments are necessary to be used by a person? A. Insulated tools & Gloves B. Safety Belt, Full body Harness & Gloves C. PPEs & SPEs D. Safety Belt & Insulated Tools.
12
Q No.07: What is the International Standard for using Full Body Harness while working on heights? A. B. C. D. Above 6 Feet At 6 Feet Below 6 Feet Both (a) & (b). Q No.08: What is Toolbox Talk? A. B. C. D. Telling a Story to a Site Supervisor Talking about working tools with Site Supervisor Talking about box of safety tools A kind of discussion before carrying out the Site work about, following safety rules, sort of work & sites conditions etc Q No.09: When TBT form is to be filled?
A. B. C. D.
execution of any kind of site work Middle of work After completion of site work There is no need of filling of TBT form before or after carrying out the work.
By Engr. Naveed Memon
13
Q No.10: While a person using/working on Bamboo Ladder it should be.. A. Kept against the wall only B. Should be held in position by at least a person standing near the feet of Ladder & tightened by a rope as well. C. Should be tightened by a rope D. Left Free Q No.11: It is very safe when working with electricity on slippery or wet surfaces. A. True B. False Q No. 12: What should be done if tools are not in good condition? A. B. C. D. Replace them Repair them (if required) Both (a) & (b) None of above
14
Q No. 13: Use --------------- in case of Electric Fire. A. B. C. D. Dry Sand Wet Sand Carbon Powder Water. Q No. 14: When Lifting, Handling & Installation of PMTs are to be performed, what necessary checks are strictly to be done? A. B. C. D. E. Crane & Boom (Moving Arm of Crane)s conditions along with other PPEs. Over all Cranes Fitness. Crane Operators Experience. Fitness Certificate of Crane All of above.
Q No.15: Housekeeping is A. Neat & Clean Working Environment. B. Well-managed work place C. Communication Cables & Electric Appliances wires tied up neatly D. All of above.
By Engr. Naveed Memon
15
A. True B. False
Q No.17: If proper Shut down is not arranged dont execute the Site job. A. True B. False \ Q No.18: What is First Aid? A. B. C. D. Initial Medical Treatment Full Medical Treatment Last Medical Treatment None of above. Q No.19: What are distribution Voltage Levels in KESC? A. B. C. D. 11 KV,& 415 Volts 11 KV & 220 Volts 415 Volts & 220 Volts None of above
By Engr. Naveed Memon
16
A. B. C. D.
Health, Safety, Exercise & Quality Health, Safety, Environment & Quality House, Safety, Environment & Quantity None of above.
17