HP BYPASS OPERATION`
RAISING OF STEAM PARAMETER DURING TURBINE ROLLING PARALLEL OPERATION WITH TURBINE ON LOAD REJECTION PREVENTING SAFETY VALVES OPENING AT RAISED STEAM PRESSURES.
BP-1
BPE-1 BPE-2
BP-2
BD
BFP DISCHARGE
CRH LINE
BP
BDE
BD
HRH LINE
LBP-2
LBPE-4
LBPE-3
HRH LINE
LBP-2
NRV
ACI
ON / OFF AUTO / MANUAL SELECTOR CONTROL OIL
MAX GATE
SLIDING SET POINT FUNCTION GENERATOR 1st Stage Throttle Pr.
LPBP EHC
HRH PR.
SIGNAL OIL
REHEAT PROTECTION
Turbine Trips & HP-LP bypass does not open. It will trip the Boiler after 5 Sec of turbine trip.