HP BYPASS OPERATION`
RAISING OF STEAM PARAMETER DURING TURBINE ROLLING PARALLEL OPERATION WITH TURBINE ON LOAD REJECTION PREVENTING SAFETY VALVES OPENING AT RAISED STEAM PRESSURES.

HPBP OPENING CRITERIA


HPBP DOWN STREAM TEMPERATURE < 380 Deg C CRH DRAIN POT LEVEL NOT HIGH

CONDENSER VACUUM > -0.8 Ksc

FAST OPENING OF HP BYPASS


GENERATOR BREAKER OPENS TURBINE LOAD SHEDDING RELAY OPERATED PR. COTROLLER DEVIATION HIGH (>10%) DEPRESSING OF FAST OPEN PUSH BUTTON FROM UCB

MAIN STEAM LINE

BP-1
BPE-1 BPE-2

BP-2

BD

BFP DISCHARGE

CRH LINE

MAIN STEAM LINE

BP
BDE

BD

BFP DISCHARGE CRH LINE

Injection water Pr. > 25 Ksc


Exhaust steam Pr. < 19 Ksc Condenser Wall Temp. < 90 DegC Condenser Vacuum > -0.8 Ksc

HRH LINE

LBP-1 LBPE-1 LBPE-2

LBP-2

LBPE-4

LBPE-3

CEP DISCHARGE TO CONDENSER TO CONDENSER

HRH LINE

LBP-1 LBPE-1 LBPE-2

LBP-2

NRV

CEP DISCHARGE TO CONDENSER TO CONDENSER

AUTO SHUT-OFF OF LP BYPASS

CONDENSER VACUUM LOW ( BACK PR. > 220 mm of Hg.)


SPRAY WATER PR. LOW (<10 Ksc) CONDENSER WALL TEMP. HIGH ( > 90*C ) LPBP DOWN STREAM PR. HIGH ( > 19 Ksc )

ACI
ON / OFF AUTO / MANUAL SELECTOR CONTROL OIL

FIXED SET POINT

MAX GATE
SLIDING SET POINT FUNCTION GENERATOR 1st Stage Throttle Pr.

LPBP EHC

HRH PR.
SIGNAL OIL

HP-LP BYPASS CAPACITY

60% OF FULL LOAD CAPACITY

REHEAT PROTECTION
Turbine Trips & HP-LP bypass does not open. It will trip the Boiler after 5 Sec of turbine trip.

ARMING -----200 T/Hr STEAM FLOW THROUGH REHEATER