SM CITY SUCAT

Jan.02Jan.08,2014
Prepared by: Jerome U. Villasanta RE Reviewed by: Julius O. Salacup RE
Noted by: Bernabe T. Salazar Jr. ROM
Engineering Design & Development

SMSC Weekly Report | Week 1

Table of Contents
1. General Information 1.1. Photos 1.2. Basic Information 1.3. Tenants Information 2. Technical Reports and Updates 2.1. Utilities Interruption 2.2. Utilities Consumptions 2.2.1. Daily Non-Potable Water Consumption Monitoring 2.3. Equipment Updates 2.3.1. Genset 2.3.2. Air Handling Units 2.3.3. Cooling Towers 2.3.4. Chillers 2.3.5. Elevators/Escalators Repair 2.3.6. (Any Other Equipment Utilities that undergo Major Maintenance/Repair)

SMSC Weekly Report | Week 1

Engineering Design & Development

Table of Contents
2.4 Lightings 2.4.1 Mall Lightings 2.4.2 Logos 2.4.2.1 SM Logos 2.4.2.2 Tenants Logos 2.5 Rest Rooms 2.6 Water Leaks 2.6.1 Photo of the Roof 2.6.2 Weather 3. Materials Withdrawals Monitoring 3.1. Materials requested within the week 3.2. Materials withdrawn within the week 4. RFW 5. SMR 6. Issues and Needs List

SMSC Weekly Report | Week 1

Engineering Design & Development

1. General Information

SMSC Weekly Report | Week 1

Engineering Design & Development

1.1. Photo and Basic Information


Bldg. A Bldg. B

SMSC GENERAL INFORMATION SHEET


86 GP DR. A SANTOS AVENUE, SAN DIONISIO, PARAAQUE CITY DATE OF OPENING: CFA: FOOD TENANTS: OPEN PARKING: PARKING FOR PWD: Bldg. A July 2001, Bldg. B November 11, 2005 126,987.92 sq.m. 43 1,346 slots 18 Slots CINEMA SEATING CAPACITY CINEMA 1: 361 CINEMA 2: 582 CINEMA 3: 584 CINEMA 4: 428 LAND AREA: TOTAL LEASABLE AREA: NON-FOOD TENANTS: MOTORCYCLE PARKING: 100,812.31 sq.m. 77,137.17sq.m. 161 126 slots

SMSC Weekly Report | Week 1

Engineering Design & Development

1.2. Basic Information

Leasable Area : 77,137.17 sq. m Common Area : 126,987.92 sq. m Percentage of Leasable from Common Area: 60.74 %

SMSC Weekly Report | Week 1

Engineering Design & Development

1.3. Tenants information

Total

Vacant

Constructing

CFA

204

19 Long Term 4 Short Term

54,892.51 sq. m

SMSC Weekly Report | Week 1

Engineering Design & Development

2. Technical Report and Updates

SMSC Weekly Report | Week 1

Engineering Design & Development

2.1. Utilities Interruptions

Utilities Power Water

Status (Dec.26-Jan.01) Week 53 No Interruption No Interruption

Status (Jan.02-Jan.08) Week 1 No Interruption No Interruption

Gas
Equipment Breakdowns Numbers of AAR

No Interruption
Chiller 3B For Overhauling Cooling Tower 1B Misaligned Fan Pulley

No Interruption
Chiller 3B For Overhauling Cooling Tower 1B Misaligned Fan Pulley

SMSC Weekly Report | Week 1

Engineering Design & Development

2.2. Utilities Consumptions


Utilities Consumption (Dec.26-01) Week 53 Consumption (Jan.02-Jan.08) Week 1

Power
Potable Water Gas

115, 250 KWH


General use : 3, 192 m3 Cooling Tower A & B : 656 m3 10, 672 Liters 23Li (W/O-Load test) 3 Genset Bldg. A 15 Li (W/O-Load test) 2 Genset Bldg. B

89,850 KWH
General use : 2,916 m3 Cooling Tower A & B : 558m3 7,318 Liters 23Li (W/O-Load test) 3 Genset Bldg. A 15 Li (W/O-Load test) 2 Genset Bldg. B

Diesel

SMSC Weekly Report | Week 1

Engineering Design & Development

2.2.1. Daily Non-Potable Water Consumption Monitoring


Jan.02
Cooling Tower TTP (Production) TTP Makeup water (Potable water) Mall (main Meter) STP Discharge

Jan.03 n/a n/a

Jan.04 n/a n/a

Jan.05 n/a n/a

Jan.06 n/a n/a

Jan.07 n/a n/a

Jan.08 n/a n/a

n/a n/a

n/a
n/a

n/a
n/a

n/a
n/a

n/a
n/a

n/a
n/a

n/a
n/a

n/a
n/a

n/a

n/a

n/a

n/a

n/a

n/a

n/a

Note: No non-potable water supply in SMSC.


Engineering Design & Development

SMSC Weekly Report | Week 1

2.3. Equipment Updates 2.3.1. Genset (update/major works)


Building A Specific Gravity Generator G1 A Running Hours 562 Battery 1 Battery 2 Battery 3 Battery 4 1.28
GREEN

Volts 24

1.28
GREEN

1.28
GREEN

1.28
GREEN

G2 A

339

1.27
GREEN

1.27
GREEN

1.27
GREEN

1.27
GREEN

25

G3 A

270

1.27
GREEN

1.27
GREEN

1.27
GREEN

1.27
GREEN

25

SMSC Weekly Report | Week 1

Engineering Design & Development

2.3. Equipment Updates 2.3.1. Genset (Update/major works)


Building B Specific Gravity Generator Running Hours Battery 1 1.27 GREEN 1.27 GREEN Battery 2 1.27 GREEN 1.27 GREEN Volts

G1B G2B

282 212

25 25

SMSC Weekly Report | Week 1

Engineering Design & Development

2.3.2. AHUs (Major Works/Activities)


DATE Jan.02 Jan.03 Jan.04 Jan.05 Jan.06 Jan.07 Jan.08 ACTIVITY Cleaning of AHU A17GF & A16GF Cleaning of AHU A13AGF & A15GF Cleaning of AHU A26TF & A21SF Cleaning of AHU A26TF & A22SF Cleaning of AHU A16SF & A12SF Cleaning of AHU A23SF & A24SF Cleaning of AHU A16GF & A20SF

SMSC Weekly Report | Week 1

Engineering Design & Development

2.3.3. Cooling Tower


Cleaning of Cooling Tower
DATE Jan.02 ACTIVITY
Cleaning of CT # 4 Bldg. A Cleaning of CT # 3 Bldg. B

Jan.03
Jan.04 Jan.05 Jan.06 Jan.07 Jan.08

Cleaning of CT # 5 Bldg. A Cleaning of CT # 1 Bldg. B


Cleaning of CT # 6 Bldg. A Cleaning of CT # 2 Bldg. B Cleaning of CT # 1 Bldg. A Cleaning of CT # 3 Bldg. B Cleaning of CT # 2 Bldg. A Cleaning of CT # 1 Bldg. B

Cleaning of CT # 3 Bldg. A Cleaning of CT # 2 Bldg. B


Cleaning of CT # 4 Bldg. A Cleaning of CT # 3 Bldg. B

SMSC Weekly Report | Week 1

Engineering Design & Development

2.3.4. Chillers
PREVENTIVE MAINTENANCE OF CHILLERS
Date Chiller No. Remarks

1/8/2014 1/8/2014

4 5

Swabbing Swabbing

SMSC Weekly Report | Week 1

Engineering Design & Development

2.3.5. Elevator/Escalator
Equipment

Total

Non Operational

On-Going Repairs

Target Date of Completion

Cause

Remarks

Elevator Escalator Dumbwaiter PWD Lift Car Lift Moving Walk

5 16 0 0 0 2

0 0 0 0 0 0

0 0 0 0 0 0

N/A N/A N/A N/A N/A N/A

N/A N/A N/A N/A N/A N/A

SMSC Weekly Report | Week 1

Engineering Design & Development

2.3.6 Major work done with in the week


Replacement of busted lights at substation area

SMSC Weekly Report | Week 1

Engineering Design & Development

2.4. Lightings
2.4.1. Mall Lightings
Brand # of Busted as of January 08 Average Life Total # of installed lamp (with the same brand) Connection (Vertical/Horizontal)

Sylvania Karo Osram GE Philips

0 0 1 0 30

Vertical Vertical Vertical Vertical Vertical

SMSC Weekly Report | Week 1

Engineering Design & Development

2.4.2. Logos
2.4.2.1 SM Logos Total Number of Logos 4 Total number repaired/replaced lights 0
# busted lamp replaced

Details

Location

Type

Remarks Busted LED already reported to DO Busted LED already reported to DO Busted LED already reported to DO Busted LED already reported to DO

Logo 1

Entrance 1 Bldg A

LED LED LED LED

0 0 0 0

Logo 2 Logo 3 Logo 4

Entrance 6 Bldg B West Parking Bldg B South Parking Bldg B

SMSC Weekly Report | Week 1

Engineering Design & Development

2.4.2.2 Tenants Logos


Total number repaired/replaced lights
0
# busted lamp replaced 0

Total Number of Logos 120 (tenants logo)

Details Total Tenant's Logo

Location Bldg. A & Bldg. B

Type LED

Remarks All Tenant Logo are Operational

SMSC Weekly Report | Week 1

Engineering Design & Development

2.5. Restrooms
Total number of fixture repaired during the week
Fixtures
Total # of Fixture Total Number repaired for the week Total number of fixture that is not repaired yet 0 0 0 0

Remarks

Water Closet Urinal Sink Floor Drain Faucet Wash Tub

61 49 40 96 40 12

1 0 0 0 1 2

Declogging water closet at female CR 2nd.flr. Bldg. B Repair water leak of flush valve at 2nd.floor & Repair toilet bowl EMB 2 Declogging toilet bowl 2nd.flr female CR Bldg. B Declogging of water closet at carpark Bldg. A Replacement of wash faucet at carpark Declogging of wash tub at carpark & 2nd.flr. Female CR Bldg. B
Engineering Design & Development

0 0

SMSC Weekly Report | Week 1

2.6. Water Leaks


Location Total number of Total number water leaks as rectified of January 08 Total number Remarks schedule to be rectified (Target date)

Tenant Affiliates Common Area Utility Room

SMSC Weekly Report | Week 1

Engineering Design & Development

2.6.1 Roof Photo

Bldg. A

Bldg. B

SMSC Weekly Report | Week 1

Engineering Design & Development

2.6.2 Weather

Jan.2 Actual Temp 87 Lo 74 Hist. Avg. 86 Lo 69

Jan.3 Actual Temp 86 Lo 73 Hist. Avg. 86 Lo 69

Jan.4 Actual Temp 87 Lo 73 Hist. Avg. 86 Lo 69

Jan.5 Actual Temp 85 Lo 73 Hist. Avg. 86 Lo 69

Jan.6 Actual Temp 87 Lo 75 Hist. Avg. 86 Lo 69

Jan.7 Actual Temp 86 Lo 75 Hist. Avg. 86 Lo 69

Jan.8 Actual Temp 87 Lo 74 Hist. Avg. 86 Lo 69

Note: The weather

condition on the table is based on Accuweather.com

***All temperature are in degrees Fahrenheit.

SMSC Weekly Report | Week 1

Engineering Design & Development

3. Materials Monitoring
3.1 Materials requested within the week.
MSRS # Material Requested QTY Amount Purpose Remarks

814292

Electrical tape Double deadlock

3 1

For replacement due to re-arrange of kiosk For replacement due to defective double deadlock at 2nd.flr.Bldg B

SMSC Weekly Report | Week 1

Engineering Design & Development

3.2. Materials withdrawn within the week.


MSRS # Material Requested QTY Amount Purpose Remarks

SMSC Weekly Report | Week 1

Engineering Design & Development

4. RFW (under TFPI)

DISAPPROVED

TOTAL RFW

New RFW

Mall Related

Tenant Related

For Quotation

For SMR

For PO

Work InProgress

Previous

21

12

10

Current

21

12

10

SMSC Weekly Report | Week 1

Engineering Design & Development

Remarks

OTHERS

DONE

5. SMR

Total

Completed

Cancelled

Outstanding

Remarks/Status

Previous Week Current week

56

40

16

56

40

16

SMSC Weekly Report | Week 1

Engineering Design & Development

6. Issues and Needs List (not SMR)


Description Status Target Date

SMSC Weekly Report | Week 1

Engineering Design & Development

Thank You!

SMSC Weekly Report | Week 1

Engineering Design & Development

You might also like