An FMEA is a systematic method for identifying, analyzing, and documenting potential failure modes and their effects on the system, the product and process performance. The possible causes of failure can then be prioritized.
Six Sigma, A Quest for Process Perfection Attack Variation and Meet Goals
\DataFile\Fishbone.mtw \DataFile\FMEAform.xls \DataFile\CopyProc.ppt \DataFile\CopyFMEA.xls \DataFile\CpultPM.ppt \DataFile\CauseEff.ppt 2004 American Society for Quality.
All Rights Reserved.
Define
Measure
Analyze
Improve
Control
Page 2
1. As a Team, how to construct an FMEA and associated Action Plan 2. How the FMEA process ties to process mapping 3. The relationship between Failure Mode, Cause and Effect 4. The different types of FMEAs
Define
Measure
Analyze
Improve
Control
Page 3
Sample FMEA
Company: Copying Company
S Failure Failure E Mode Effects V Must redo copy Must redo copy Must redo copy O D R C E P C Controls T N
Part/ process
Causes
Action Recommended
Resp. Person
Schedule Date
Paper Jam 9
Must redo copy Must redo copy Must redo copy Must redo copy Must redo copy
Existing User notes on copier 5 245 7 misset size 7 User Existing misset notes on control copier 4 140 7 5 Used landscape instead of Tray portrait or 7 vice versa 8 Selection 2 112 align marking not clear Doc moved when lid closed Use Auto Feeder / 4 align ruler 3 84 Use Auto Feeder / 5 align ruler 2 70 Auto select function 3 63 Periodic Cleaning SOP 1 42
Ensure proper weight and type Key Opr paper avail for copiers Place sign over copier outlining standard size enlarge/reduce or reliable mach to clearly indicate standard reduce/enlarge Key Opr
3/1
2/15
7 3 7 147 3 441
2/20
2/15
7 3 2
42 1
42
2/20
2/15
7 2 2
28 1
28
Key Opr
1/20
Placed Note
1/15
8 2 1
16 1
16
Enlarge marks for 8.5 " paper on ruler Key Opr Place sign over copier re "Ensure align prior to copying or use auto Feeder" Key Opr Place sign over copier to encourage user to use auto tray select Key Opr Place cleaning material near copier
1/15
Enlarged marks
1/14
7 2 1
14 1
14
1/15
Displayed Sign
1/14
6 1 1
2/25
2/20
7 2 3
42 1
42
Dirty Glass 6
Maint.
1/15
1/15
6 1 1
Define
Measure
Analyze
Improve
Control
Page 4
Identify ... critical product characteristics and process variables Prioritize ... product and process deficiencies in support of downstream improvement actions
Define
Measure
Analyze
Improve
Control
Page 5
Benefits of FMEAs
Improves the quality, reliability and safety of products. Helps increase customer satisfaction.
Define
Measure
Analyze
Improve
Control
Page 6
FMEA - Level #1
Process - Level #2
Step #1 Step #2 Step #3
FMEA - Level #2
Process - Level #3
Step #1 Step #2 Step #3
FMEA - Level #3
Define
Measure
Analyze
Improve
Control
Page 7
9. Determine Actions/Plan
10. Recalculate RPN Based on Plan 11. Take Action
Define Measure Analyze Improve Control Page 8 FMEA Version 2.1 2004 American Society for Quality.
All Rights Reserved.
FMEA Form
Workbook in Excel
\DataFile\FMEAForm.xls
Define Measure Analyze Improve Control Page 9 FMEA Version 2.1 2004 American Society for Quality.
All Rights Reserved.
Define
Measure
Analyze
Improve
Control
Page 10
First produced in 1950 by Professor Kaoru Ishikawa - Also called the: Ishikawa Diagram Fish Bone Diagram Developed to represent the relationship between some effect and all possible causes influencing the effect.
\DataFile\CausEff.ppt
Enter causes for each of the 6M branches. Expand or add text boxes as required.
Define Measure Analyze Improve Control 2004 American Society for Quality.
All Rights Reserved.
Measurements
Specimen not sufficient
Materials
Personnel
Plastic bags
Environment
Methods
Machines
The Memory JoggerTM
Define
Measure
Analyze
Improve
Control
Page 12
Define
Measure
Analyze
Improve
Control
Page 13
Retrieve Copies
OUTPUT
OUTPUTS(Ys) Copies with: right number right contrast correct orientation right size on right paper
(xs) (xs) N Hinges on Lid C # Copies CR Auto Feeder Button N Glass Clean CR # Copies Required INPUTS (Xs) Operator Copy Machine Paper Power Instructions Document to Copy Product (ys) Doc set correctly Doc set incorrectly Upside Down Sideways
C 8.5 X 14 Landscape
C 8.5 X 14 Portrait C 11 X 14 C Trays with adequate supply of paper
.
Product (ys) Right size selected Size too Small Size too Large
Define
Measure
Analyze
Improve
Control
Page 14
From the Process Map, identify the process step with the most likelihood of having failure modes with significant effects. Use defect data and/or team knowledge about failure modes when selecting process steps. Significant impact to the business? (COPQ, cycle time, fill rate, ...) Use a Cause and Effect Diagram to capture brainstorming results. After completing FMEA Steps #2-7 for all failure modes associated with this process step, return to this step and select the next most likely Heavy Hitter process step. Not all process steps will need to be analyzed by the FMEA.
2004 American Society for Quality.
All Rights Reserved.
Define
Measure
Analyze
Improve
Control
Page 15
From the Process Map, identify the ys that are associated with the process step being investigated.
As the ys are the indications of a successful completion of the process step, they are crucial as a basis for determining failure modes.
Define
Measure
Analyze
Improve
Control
Page 16
Brainstorm failure modes for the selected process step Identify the ways in which the process could fail to generate each of the expected ys.
Eliminate duplicates from brainstorm list. Are the failure modes from the same level of the process? Are the failure modes specific? Are the failure modes the most likely? Do the failure modes provide good coverage of the process step? Have all ys been considered?
Define
Measure
Analyze
Improve
Control
Page 17
Pick the most likely failure mode and brainstorm the most important effects:
FAILURE EFFECTS are the outcome of the occurrence of the failure mode in the process.
The impact on the customer is what the customer experiences as a result of the Failure Mode.
Define
Measure
Analyze
Improve
Control
Page 18
Identify the most likely causes for each failure mode using a Cause and Effect Diagram :
CAUSES are the conditions that bring about the Failure Mode.
Transfer the resulting information to the FMEA form. Assign an occurrence value (1-10) to the likelihood that each particular cause will happen and result in the failure mode. The occurrence score for each cause should be related to the likelihood of that cause resulting in the failure mode and producing the specific associated effect.
Define
Measure
Analyze
Improve
Control
Page 19
Out of cal
Copy Misaligned
Humidity
Environment
Define Measure Analyze
Methods
Improve
Machines
Control
Page 20
Lets create the fish bone diagram on the previous page using Minitab
Give the bones any name you wish Identify a measurable undesirable effect for the head
Define
Open Data File FISHBONE The data have been entered in columns C1 through C6 (normally, you would enter your own data) Go to Stat > Quality Tools > Cause-andEffect The dialog box Cause and Effect Diagram will appear as shown
Define
Measure
Analyze
Improve
Control
Page 22
3
4
1. Highlight Personnel 2. Push Select 3. Personnel will appear in the Causes window next to the Label for Personnel 4. Repeat for all Labels
Define
Measure
Analyze
Improve
Control
Page 23
1. Type Effect: MISALIGNED COPY 2. Type Title: COPY PROCESS FISHBONE 3. Push OK
1 2
3
Define Measure Analyze Improve Control Page 24 FMEA Version 2.1 2004 American Society for Quality.
All Rights Reserved.
O ut of calibration
Misaligned C opy
H umidty
Env ironment
Methods
Machines
Define
Measure
Analyze
Improve
Control
Page 25
Assign a detection value (1-10) based on an assessment of the likelihood that the current control mechanisms will detect the cause of the failure mode before it reaches the customer.
Define
Measure
Analyze
Improve
Control
Page 26
The RPN provides a relative priority for taking action; the bigger the RPN, the more important to address.
Define
Measure
Analyze
Improve
Control
Page 27
Steps 8 and 9
8: Prioritize by RPN Order Use the Sort command in Excel to order the spreadsheet in descending order of Risk Priority Number (RPN).
9: Determine Actions/Plan Based on the causes found, determine actions that will minimize the effect of each cause, in priority order.
Define
Measure
Analyze
Improve
Control
Page 28
Steps 10 and 11
10: Recalculate RPN Based on Plan Assuming the actions are carried out successfully, reassign severity, occurrence and detectability.
Place these new ratings in the predicted columns (ps, po & pd). Assign a rating from 1 to 5 for each action that will show the risk associated with each action (5 being the greatest risk). Place the rating in the risk column.
11: Take Action Based on the risk mitigation column (Risk * prpn), take the actions indicated or reassign actions.
Define
Measure
Analyze
Improve
Control
Page 29
Steps 1-11:
Step 1 Step 2 ID ys Step 4
Company: Your Company Project: Copying Process
S Part/ Failure Failure E process Mode Effects V Retrieve No Copies Copies Copy is wrong size Must redo copy Must redo copy Must redo copy O D R C E P C Controls T N
\DataFile\CopyFMEA.xls
Step 6 Step 9 Step 11
Page 1 of 1 Printed on 4/5/00 2:37 PM Owner__Key Operator__ p R Actual r i Risk Resp. Schedule Compl. p p p p s X Person Date Action Taken Date S O D n k prpn Ensured proper supplier used to provide copy Key Opr 3/1 2/15 7 3 7 147 3 441 paper
FMEA
Action Recommended
Causes
Set Light/ Copy Dark too light Copy Place not Doc into aligned Position properly
Periodic Ensure proper weight and type Maint. 7 441 paper avail for copiers Place sign over copier outlining Existing standard size enlarge/reduce or User notes on reliable mach to clearly indicate standard reduce/enlarge 7 misset size 7 copier 5 245 User Existing misset notes on Place sign to encourage user to control utilize auto settings 7 5 copier 4 140 Used landscape instead of Tray Place note on ruler re tray portrait or selection 7 vice versa 8 Selection 2 112 7 Paper Jam 9
Key Opr
2/20
2/15
7 3 2 42 1
42
Key Opr
2/20
2/15
7 2 2 28 1
28
Key Opr
1/20
Placed Note
1/15
8 2 1 16 1
16
Step 3
Step 5
Step 7 & 8
Step 10
Define
Measure
Analyze
Improve
Control
Page 30
Process FMEA
Helps analyze manufacturing and assembly processes to reduce the occurrence and improve detection of defects. Assists in the development of process control plans. Establishes a priority for improvement activities. Documents the rationale behind process changes and helps guide future process improvement plans. IS PROACTIVE! Should be started when new processes are designed or when old processes are changed.
Define
Measure
Analyze
Improve
Control
Page 31
Score
10 9 8 7 6 5 4 3 2 1
SEVERITY CRITERIA
Hazardous Without Warning Hazardous With Warning Very High High Moderate Low Very Low Minor Very Minor None
OCCURENCE
>=1 in 2 1 in 3 1 in 8 1 in 20 1 in 80 1 in 400 1 in 2,000 1 in 15,000 1 in 150,000 <1 in 1,500,000 Very High Very High High High Moderate Moderate Moderate Low Low Remote
DETECTION
Absolute Uncertainty Very Remote Remote Very Low Low Moderate Moderately High High Very High Almost Certain
Note: When completing a Process FMEA, first assume the material is good and the process is bad. Then assume that the process is good and the material is bad. Lastly, review the process for safety considerations.
Define Measure Analyze Improve Control 2004 American Society for Quality.
All Rights Reserved.
Page 32
Failure
Failure
Part/process
OBTAIN PARTS
Mode
NO PARTS
Effects
Causes
FAILED TO ORDER < LEAD TIME SUPPLIER DIDN'T DELIVER PART FORECAST CHANGED
C 8 8 4
Controls
SOP (MRP) AD-HOCK EXPEDITING SALES
D E T
2 8 10
R P N
160 640 400
Actions
UPDATE LEAD TIMES CABS, Re-Source
P P P P S O D r P n Plans 5 2 1 5 2 2 20 40
WRONG PARTS
8 8
WRONG PART ORDERED SUPPLIER ERROR WRONG PARAMETER WRONG PARAMETER TESTER MALFUNCTION INADEQUATE TEST PROCEDURE
2 4 4 2 2 4
SOP UNCONTROLLED TEST COMPLETED TEST COMPLETED CAL LAB CERTIFICATION DESIGN SPECIFICATION
8 6 10 10 10 10
0 0 5 1 2 20 0 0 0
BAD PART
10 10
2 2
4 4
80 80
0 0
LATE PART
PARTIAL BUILD 8 8 8
FAILED TO ORDER < LEAD TIME SUPPLIER LATE DELIVERY FORECAST CHANGE GROUND PIN LOCATION EXCESSIVE PRESSURE MISSREGISTRATION INCOMPLETE INSERTION
10 10 4 4 2 2 2
SOP (MRB) AD-HOCK EXPEDITING SALES DRAWING / PROCEDURE OPERATOR OPERATOR OPERATOR
2 8
160 640
CABS, Re-Source
0 4 2 2 32 0 0 0 0
10 320 6 6 4 4 144 72 64 64
LOAD FLEX
6 6 8 8
Define
Measure
Analyze
Improve
Control
Page 33
Causes
O C C
Controls
D R E P T N
Completion
Action Plan
One input form to eliminate redundant data entry.
Who
Date
p p p SOD
p r p n
DPU DPU
Data entry is repetitive (same info in several docs) Tst Process Sheet, Nonconforming Tag, SPC, 8 spcl reporting reqs 10 None
4 320
Team
Date
2 1 2
Risk (1-5)
1
DPU
Assocs don't see need for 8 entering PASS info 6 Training Too many codes. Teams Use wrong codes - untrained to limit codes to Training & difficult to extract those meaningful for their Document for 8 area 6 QDB meaningful info Assocs don't see benefits: Crystal Rpts Reports not giving assocs & Point & what's needed to manage Shoot 8 production within Cell 8
Names
Date
1 1 1
Teams
Date
3 1 2
DPU
Not all defect data entered into Data integrity is suspect system
Provide canned reports. Train Assocs how to obtain info & what reports mean.
4 256
DPU
Scrap Tub Make uninformed No link from CABS to requires no data decisions re 10 Supplier Qual DB to be fed to RI Suppliers Not all defect data entered into Data integrity is suspect system Initial setup of Key Characteristic not Takes longer to implement intuitive
10 Policy
DPU
Training 6 Manpower
SPC
Test RTY
Infinity SW not user 4 friendly Defect data captured on paper then input into 6 computer.
Name Print non-conformance tags from data entered in computer (real time). Eliminate scrap tubs (non-conf on all parts). Link QDB to PQS - await disposition till root cause of part failure is determined. 2 200 Names Plan comprehensive training for QDB: Train the trainer for 2 locations. Make system intuitive to require less less training. 6 288 Names Investigate alternate SPC pkgs and methods to make existing system easier to use. 6 192 Team
Establish real time data entry. Provide adequate computers on floor.
Date
2 1 2
Date
3 1 1
Date
2 2 2
Date
2 4 3 24
120
Names
Date
1 1 2
Define
Measure
Analyze
Improve
Control
Page 34
Risk X prpn
4
18
16
40
Design/Product FMEA
Helps to identify potential product failure modes early in the product development cycle. Increases the likelihood that all potential failure modes and their effects on assemblies will be considered. Assists in evaluating product design requirements and test methods. Establishes a priority for design improvement. Documents the rationale behind design changes and helps guide future development projects. IS PROACTIVE! Should be done when new products are designed or existing products are changed.
Define
Measure
Analyze
Improve
Control
Page 35
Does the test really guarantee a failure wont reach the customer?
Causes
Particle in gap Particle in gap Particle in gap Film on parts Particle on coil Particle on magnet Film on parts Film on parts Film on parts
O D R C Controls E P C Detection T N
4 4 4 3 2 2 3 3 3 Sweep Sweep Sweep Sweep Sweep Sweep Sweep Sweep Sweep 4 4 4 3 4 4 3 3 3 80 64 48 45 40 40 36 36 36
Define
Measure
Analyze
Improve
Control
Page 36
Failure Effects
INOP Target loss & Limited Range
S E V
4 2 2
Causes
O D R C E P Controls C T N
Actions
p p p Plans S O D
p r p n
Current # Defects
1 7 2
TSO Failure Target not in RF Fnt End 1090 Rcvr Brg, correct location (SW Brd) Beamform, Align on Display Limited Range No Noticeable RF Fnt End Return Loss Fails Effect Unit Level 1090 Sens Low
4
2 1
Interconnect cable Vendor Improved open 2 Vendor issue 4 32 conn & process Whitmore 4 1 4 16 Dsn Eval to remove Lo Gain 4 IF Fil Adj 4 32 RF hot spot In Work 2 1 4 8 RF Signal Low, Restrict ability of Cables w/poor RF 4 M&TE, Temp 3 24 cables to move DOE? 2 2 3 12 P-Shifter out of SOP, DOE to improve align due to wire 3 Handling 2 24 process DOE? 4 2 1 8 line couplers RF Front End, Addl Equip needed Lease/ Rcvr, Xmission 4 M&TE, Temp 3 24 to determine cause borrow 2 4 1 8 M&TE Capability/ Mod TE repeatability 5 M&TE 4 20 MSE SW 1 2 4 8
32
Define
Measure
Analyze
Improve
Control
Page 37
Defect FMEA
Helps identify the root causes of defects. Establishes a priority for improvement activities. Documents plan of action. Provides methodology to battle initial ground swell of defects. Focuses effort on defects with highest $ impact. IS NOT PROACTIVE!
Define
Measure
Analyze
Improve
Control
Page 38
Scoring Criteria
Use actual defect quantities
Score 10 9 8 7 6 5 4 3 2 1
SEVERITY CRITERIA
Hazardous Without Warning Hazardous With Warning Very High High Moderate
Low
OCCURENCE
Very High Very High High High Moderate Moderate Moderate Low Low Remote
DETECTION
Absolute Uncertainty Very Remote Remote Very Low Low Moderate Moderately High High Very High Almost Certain
Define
Measure
Analyze
Improve
Control
Page 39
Part/ Process
Defect
Causes
Q T Y
D E Controls T
R P N
Actions
p p p Plans S O D
4/23
p r p n
Unit Level Dewetting Solder No/Insufficient Solder (mostly JUnit Level Lead parts) No/Insufficient Soler (mostly JUnit Level Lead parts) Incorrect Unit Level Installation Incorrect Unit Level Installation Unit Level
Solderability of 4 Parts
4 6 4 96
Screen Thick 4 ATA Paste Process 57 & consistency 3 ATA IR Reflow Process Part Installation Instructions ATA Board Handling GAA Drawings and ECO's Speed and 57 pre-heat 50 SOP 50 SOP 50 SOP
5\7
4 6 3 72
4 4 4 4
3 2 2 2
684 DOE on IR reflow Call ATA re problem 400 Send marked dwg Process flow 400 characterization Dwg Stds & ECO 400 procss improvmnt
4/10 3/30
4 6 3 72 4 5 2 40 0
10/15
4 5 2 40
Define
Measure
Analyze
Improve
Control
Page 40
Catapult Exercise
Analyze the Catapult process using the FMEA tool.
(Remember we want to get the most bang for the buck.)
Break into the Catapult teams. We have already constructed a process map. First, we will construct a cause and effect diagram. Then, we will complete at least two failure modes for the most critical step(s) of our process. Appoint a spokesman for your team to debrief the class on your progress, questions, etc. Complete the FMEA (Datafile/FMEAform.xls) for the Catapult process before the second session (We will use this information for our DOE competition).
Measure Analyze Improve Control Page 41 FMEA Version 2.1
1
25 minutes!
2 3 4 5
Define
\DataFile\CpultPM.ppt
INPUTS
INPUTS (Xs) Operator Catapult Ball Rubber Bands Instruction Manual Target Target Location Environment C C C C
Set up Launcher
Process (xs) Cup Position Tension Pin Arm Stop Setting Rubber Band Hook Position C Angle Pin Setting C Safety considerations
Select Ball
Process (xs) C Type C Weight N Size N Color
Measure Distance
Process (xs) C Length C Latteral N Observer N Tape measure
Record Distance
Process (xs) N Paper N Pen C Recorder
OUTPUT
OUTPUTS (Ys ) Ball hits target
. (ys) Product Product (ys) Product. (ys) Product (ys) Right size selected Launcher Setup Right settings Correct Ball Selected Correctly for Desired Incorrect Ball Selected Size too Small Incorrect Setting Distance Size too Large Launcher set Not enough tension incorrectly Wrong Cup Position Stop Wrong Tension Pin Wrong Wrong # Rubber Bands Accident/Injury
Product (ys) Product (ys) Product (ys) Ball successfully Distance Correct Data Recorded away Distance Incorrect Data Errors Ball not successfully away Injury
KEY for (xs) Process Parameters N Noise Parameters C Controllable Process Parameters S SOP Parameters CR Critical Parameters
Define
Measure
Analyze
Improve
Control
Page 42
\DataFile\CausEff.ppt
Ball Set or Pressed
Consistent Measuring
Ball W eight Ball Material Rubberband Strength Rubberband Texture Rubberband Tension
Consistent Release T
Distance
Rubberband Configura Inc line or Level Sec uring to Floor at Fric tion pegs Start Angle Height off Floor Plac ement of Rubberb Stop Angle Top or Bottom of Peg Floor Covering Smooth Release Top or Bottom of Hoo Length of Arm
Environment
Methods
Machines
design
application
environment material
Define
Measure
Analyze
Improve
Control
Page 44
product/process failure modes, related effects, causes, & methods of control. Risk Priority Number (RPN) for action based on failure severity, probability of occurrence and detection capability. Actions/plans to reduce elements of RPN.
to identify critical product/ process parameters. Achieve consensus on solutions and methods of implementation. Detailed product/process understanding.
Define Measure Analyze Improve Control
Page 45
Keys to Success
Identify purpose...BE SPECIFIC! Understand effects...INVOLVE CUSTOMERS & SUPPLIERS! Link to the process map. Use to prioritize efforts, allocate resources. Use as a risk assessment/prioritization tool based on predicted impact. Use to build consensus on prioritization. Encourage creativity...TEAMWORK! PLAN! ASK QUESTIONS!
Define
Measure
Analyze
Improve
Control
Page 46
9. Determine Actions/Plan
10. Recalculate RPN Based on Plan 11. Take Action
Define Measure Analyze Improve Control Page 47 FMEA Version 2.1 2004 American Society for Quality.
All Rights Reserved.
1. As a Team, how to construct an FMEA and associated Action Plan 2. How the FMEA process ties to process mapping 3. The relationship between Failure Mode, Cause and Effect 4. The different types of FMEAs
Define
Measure
Analyze
Improve
Control
Page 48
\DataFile\FMEAform.xls
Define
Measure
Analyze
Improve
Control
Page 49
Scoring Criteria
Score
10 9 8 7 6 5 4 3 2 1
SEVERITY CRITERIA
Hazardous Without Warning Hazardous With Warning Very High High Moderate Low Very Low Minor Very Minor None
OCCURENCE
>=1 in 2 1 in 3 1 in 8 1 in 20 1 in 80 1 in 400 1 in 2,000 1 in 15,000 1 in 150,000 <1 in 1,500,000 Very High Very High High High Moderate Moderate Moderate Low Low Remote
DETECTION
Absolute Uncertainty Very Remote Remote Very Low Low Moderate Moderately High High Very High Almost Certain
Define
Measure
Analyze
Improve
Control
Page 50
Occurrence is an assessment of the likelihood that a particular cause will happen and result in the
failure mode.
Detection is an assessment of the likelihood that the current controls (design and process) will detect
the cause of the failure mode, should it occur, thus preventing it from reaching your customer. The customer in this case could be the next operation, subsequent operations, or the end user.
Current Controls (for both design and process) are the mechanisms which prevent the cause of the
failure mode from occurring, or detect the failure mode, should it occur, before the product reaches your customer. For example, current controls include SPC, inspections, written procedures, training, preventive maintenance and all other activities that ensure a smooth running process.
Critical Characteristics are those items which affect customer safety and/or could result in noncompliance to regulations and thus require controls to ensure 100% compliance. These are usually processsettings such as temperature, time, speed, etc.
Significant Characteristics are those items which require SPC and quality planning to ensure
acceptable levels of capability.
Define
Measure
Analyze
Improve
Control
Page 51
Terminology
A. B. C. D. E. F. G. H. I. J. K. L. M. N. O. P. Q. R. S. T.
Define
Process or Product Name Description of Process or Product being analyzed. Responsible Name of Process Owner. Prepared By - Name of Agent coordinating FMEA study. FMEA Date Dates of Initial and subsequent FMEA Revisions. Process Step/Part Number Description of individual item being analyzed. Potential Failure Mode Description of how the process could potentially fail to meet the process requirements and/or design intent, i.e. a description of a non-conformance at that Potential Failure Effects Description of the effects of the Failure Mode upon the customer, i.e. what the next user of the process or product would experience or notice. SEV (Severity) An assessment of the seriousness of the effect of the potential failure mode Potential Causes Description of how the failure could occur, described in terms of something OCC (Occurrence) Description of how frequently the specific failure cause is expected to Current Controls Description of process controls that either prevent, to the extent possible, DET (Detection) An assessment of the probability that the current controls will detect the potential cause, or the subsequent failure mode. RPN (Risk Priority Number) The product of the Severity, Occurrence, and Detection Rankings i.e. RPN = SEV * OCC * DET. Actions Recommended Actions to reduce any or all of the Occurrence, Severity or Detection rankings. Responsibility Person or group responsible for the Recommended Action. Actions Taken Brief description of actual action and effective date. New SEVERITY Rating after corrective action. New OCCURENCE Rating after corrective action. New DETECTION Rating after corrective action. Resulting new RPN after corrective action.
Measure Analyze Improve Control Page 52 FMEA Version 2.1 2004 American Society for Quality.
All Rights Reserved.