1. The document reports on the performance of a trial to upgrade the TOLGATECKRMW site from 3 to 6 sectors.
2. Key findings of the report include reduced power, CE, and code utilization, as well as decreased call rejections due to power congestion and improved RTWP.
3. Drive test results showed improvements in coverage indicators like RSCP and EcNo after the sector upgrade.
Original Description:
Original Title
Final Report Trial 6 Sector_jkb680_tolgateckrmw_ 20140120
1. The document reports on the performance of a trial to upgrade the TOLGATECKRMW site from 3 to 6 sectors.
2. Key findings of the report include reduced power, CE, and code utilization, as well as decreased call rejections due to power congestion and improved RTWP.
3. Drive test results showed improvements in coverage indicators like RSCP and EcNo after the sector upgrade.
1. The document reports on the performance of a trial to upgrade the TOLGATECKRMW site from 3 to 6 sectors.
2. Key findings of the report include reduced power, CE, and code utilization, as well as decreased call rejections due to power congestion and improved RTWP.
3. Drive test results showed improvements in coverage indicators like RSCP and EcNo after the sector upgrade.
Jan 20 th , 2014 HUAWEI RNP TEAM HUAWEI Confidential 2 Site Overview C E L L I D
C E L L N A M E
U A R F C N U P L I N K
U A R F C N D O W N L I N K
P C P I C H P O W E R
M A X T X P O W E R
P S C R A M B C O D E
46801 N_TOLGATECKRMW1 9688 10638 360 448 86 46802 N_TOLGATECKRMW2 9688 10638 360 448 94 46803 N_TOLGATECKRMW3 9688 10638 360 448 102 46804 N_TOLGATECKRMX4 9713 10663 360 448 86 46805 N_TOLGATECKRMX5 9713 10663 360 448 94 46806 N_TOLGATECKRMX6 9713 10663 360 448 102 26801 N_TOLGATECKR6SECMW7 9688 10638 360 448 204 26802 N_TOLGATECKR6SECMW8 9688 10638 360 448 212 26803 N_TOLGATECKR6SECMW9 9688 10638 360 448 220 26804 N_TOLGATECKR6SECMX10 9713 10663 360 448 204 26805 N_TOLGATECKR6SECMX11 9713 10663 360 448 212 26806 N_TOLGATECKR6SECMX12 9713 10663 360 448 220 Antenna Configurations Sectors Azimuth Tilting Before M-tilt After M-tilt Before E-tilt After E-tilt 1 25 2 2 5_5 5_5 2 210 4 3 5_5 5_5 3 300 4 3 5_5 5_5 Antenna Height 18 m Site Configuration Details Before After RNC Homing RNC MERUYA RNC MERUYA CE Configuration 768/384 768/768 Sectors 3 6 Configuration S222 S222222 IUB BW WBBP Board 2 2 HUAWEI RNP TEAM HUAWEI Confidential 3 Summary TOLGATECKRMW 1. Cutover for 6 sector at TOLGATECKRMW already done on Mar 29 th , 2013 2. Power utilization is decreased from 70% to 40% 3. CE utilization UL&DL are decreased from 90% to 20% 4. IUB utilization is decreased from 40% to 25% 5. HSDPA Code utilization is decreased from 80% to 10% 6. Call reject due to power congestion are reduced after cut over 7. RTWP on busy hour is improved and CQI is maintained 8. Mean TCP is decreased from 41% to 39% 9. SHO Overhead is increased 10. Traffic Voice, PS, HSDPA, & HSUPA payload are slightly decreased due to several sites OA 11. Based on DT, the RSCP > -75 dBm decreased from 50.46% to 49.88% and Ec/No > -9 dB increased from 15.34% to 58.83%
HUAWEI RNP TEAM HUAWEI Confidential 4
Utilization & Congestion HUAWEI RNP TEAM HUAWEI Confidential 5 Power, CE, Code and Iub Utilization HUAWEI RNP TEAM HUAWEI Confidential 6 Call Reject Due to Power Congestion Call reject due to power congestion are reduced after cut over HUAWEI RNP TEAM HUAWEI Confidential 7 RTWP, Mean TCP, CQI & SHO Overhead HUAWEI RNP TEAM HUAWEI Confidential 8 RTWP, Mean TCP, CQI & SHO Overhead RTWP is improved and CQI is maintained Mean TCP is slightly decreased SHO Overhead is increased
HUAWEI RNP TEAM HUAWEI Confidential 9 Performance Statistics HUAWEI RNP TEAM HUAWEI Confidential Accessibility CSSR CS Voice is maintained CSSR PS is maintained CSSR HS is maintained
HUAWEI RNP TEAM HUAWEI Confidential Retainability CCSR CS Voice is maintained CCSR PS is maintained CCSR HS is maintained
HUAWEI RNP TEAM HUAWEI Confidential Mobility SHO is maintained ISHO is maintained IFHO is maintained HUAWEI RNP TEAM HUAWEI Confidential Voice traffic, PS, HSDPA, & HSUPA Payload are slightly decreased due to several new sites OA Traffic & Payload HUAWEI RNP TEAM HUAWEI Confidential 14 Drive Test Result HUAWEI RNP TEAM HUAWEI Confidential 15 RSCP / EcNo Distribution Based on DT, the RSCP > -75 dBm decreased from 50.46% to 37.79% and Ec/No > -9 dB increased from 15.34% to 61.42% Ranges Percentage (%) Before After RSCP -130 to -105 0.00 0.00 -105 to -95 0.35 2.10 -95 to -85 21.52 14.26 -85 to -75 27.66 45.85 -75 to -65 21.03 33.39 -65 to 0 29.43 4.40 EcNo -30 to -18 24.64 0.07 -18 to -15 20.31 0.37 -15 to -12 18.89 5.12 -12 to -9 20.82 33.02 -9 to -6 13.92 43.10 -6 to 0 1.42 18.32 HUAWEI RNP TEAM HUAWEI Confidential 16 3G RSCP POST PRE HUAWEI RNP TEAM HUAWEI Confidential 17 3G EcNo POST PRE HUAWEI RNP TEAM HUAWEI Confidential 18 3G SC Plotting POST PRE HUAWEI RNP TEAM HUAWEI Confidential 19 Justification Cannot Access Route 330 Note : Cannot Acces Due to Higly Resident. People Whos live inside the resident or friend in this resident can enter this resident (Resident Mediterania). 1 HUAWEI RNP TEAM HUAWEI Confidential 20 Justification Cannot Access Route Note : Cannot Acces Due to Higly Resident. People Whos live inside the resident or friend in this resident can enter this resident (Resident Mediterania). 1 HUAWEI RNP TEAM HUAWEI Confidential 21 Panoramic Pictures HUAWEI RNP TEAM HUAWEI Confidential 22 0 30 60 90 Sector 1 : 40 HUAWEI RNP TEAM HUAWEI Confidential 23 120 150 180 210 Sector 2: 195 HUAWEI RNP TEAM HUAWEI Confidential 24 240 270 300 330 Sector 3 : 310 HUAWEI RNP TEAM HUAWEI Confidential 25 Site Audit HUAWEI RNP TEAM HUAWEI Confidential Antenna Type 26 Site Audit Azimuth = 40 M-Tilt = 2 E-Tilt = 6 Sector 1 With Add Sectors . HUAWEI RNP TEAM HUAWEI Confidential Antenna Type 27 Site Audit Azimuth = 195 M-Tilt = 3 E-Tilt = 6 Sector 2. HUAWEI RNP TEAM HUAWEI Confidential 28 Site Audit Azimuth = 310 M-Tilt = 4 E-Tilt = 4 Sector 3 With Add Sectors .
. Antenna Type HUAWEI RNP TEAM HUAWEI Confidential 29 Optimization History HUAWEI RNP TEAM HUAWEI Confidential 30 SITE ID SITE NAME SECTOR RECCOMENDATION DESCRIPTION VALUE (BEFORE) RECOMMENDATION JKB193 TOLKAPUKMUARAMW 1/3 Physical Antenna Adjustment for Optimum Coverage Ant Ht: 5m Az30/150/270 E: -/-/- M: 6/8/6
Ant Ht: 5m Az70/160/250 E: -/-/- M: 4/4/4 *May 07, 2013 JKU560 KAPUKMUARAMW 1/3 Physical Antenna Adjustment for Optimum Coverage Ant Ht: 24m Az30/150/280 E: 4/4/4 M: 4/5/4
Ant Ht: 24m Az10/120/250 E: 4/4/4 M: 4/5/4 *May 07, 2013 JKB680 TOLGATECKRMW 1/3 Physical Antenna Adjustment for Optimum Coverage Ant Ht: 18m Az25/195/310 E: 5/5/5 M: 2/4/4
Ant Ht: 18m Az40/195/310 E: 6/6/4 M: 2/3/4 *Nov 23, 2013 JKU560 KAPUKMUARAMW 1/3 Physical Antenna Adjustment for Optimum Coverage Ant Ht: 24m Az20/120/240 E: 4/4/4 M: 4/3/2
Ant Ht: 24m Az0/100/240 E: 4/6/4 M: 4/3/2 *Jun 19, 2013 JKU032 VILAKAPUKMASMW 1/3 Physical Antenna Adjustment for Optimum Coverage Ant Ht: 35m Az30/210/300 E: 5/6/7 M: 4/4/2
Ant Ht: 35m Az30/180/300 E: 5/4/6 M: 4/4/3 *Jul 24, 2013 JKU137 MUARAKARANGSTPMW 1/3 Physical Antenna Adjustment for Optimum Coverage Ant Ht: 22m Az70/190/310 E: 6/6/2 M: 2/3/2
Ant Ht: 22m Az70/190/310 E: 5/5/4 M: 2/2/2 *Sep 12, 2013 HUAWEI RNP TEAM HUAWEI Confidential 31 Surrounding Site Traffic & payload HUAWEI RNP TEAM HUAWEI Confidential 32 Surrounding SHO Overhead HUAWEI RNP TEAM HUAWEI Confidential 33