The Channel Tunnel is a railway tunnel under the English Channel that connects France and the UK. Construction began in 1988 and it opened for service in 1994. At the time, it was the largest undersea tunnel project ever built, utilizing large tunnel boring machines. The tunnel provides a safe and efficient transport link between France and the UK for passengers and goods, shortening the trip to just a few hours.
The Channel Tunnel is a railway tunnel under the English Channel that connects France and the UK. Construction began in 1988 and it opened for service in 1994. At the time, it was the largest undersea tunnel project ever built, utilizing large tunnel boring machines. The tunnel provides a safe and efficient transport link between France and the UK for passengers and goods, shortening the trip to just a few hours.
The Channel Tunnel is a railway tunnel under the English Channel that connects France and the UK. Construction began in 1988 and it opened for service in 1994. At the time, it was the largest undersea tunnel project ever built, utilizing large tunnel boring machines. The tunnel provides a safe and efficient transport link between France and the UK for passengers and goods, shortening the trip to just a few hours.
What Kind of Structure is it? The Channel Tunnel is a railway tunnel built underneath the English Channel When Was the Tunnel Built? The tunneling began in 1988 and the tunnel opened in 1994 Where is it Located? Under the English Channel at the Strait of Dover Between the UK and France What is the Purpose of the Structure? To transport people and goods between France and the UK How is the Structure Innovative? At the time it was built it was the largest undersea tunnel project ever designed utilizing very large drills in its construction. What Makes it a Wonder of the Modern World? The tunnel provides safe and efficient access between France and the UK It shortens the trip to just a couple hours Since 1994 it has carried 330 million passengers It averages 56k daily passengers Which Engineering Specialists Likely Collaborated on the Design? All 5 fields of civil engineering were involved in the design of Channel Tunnel Structural- Tunnel design itself Water Resources- To ensure that the project was doable and that it would not affect the Ocean above negatively Transportation- Railway Design Geotechnical- Involved in the drill design Environmental- Paired with water resources to ensure water safety and overall pollution control