Zamzam 2
Zamzam 2
Water Factory
August 2014
SCOPE
Production
POLICY
Zamzam is committed to delivering a high quality
standard drinking water to comply with our
customers requirements.
This can be achieved by continuous improvement and
applying advanced process technologies and
involvement of all employees regarding their safety in
the first place with provide safe work environment and
welfare facilities.
Zamzam is also committed to prevent any kind of
environmental pollution and to protecting the health &
Safety of communities surroundings the areas of our
work.
C.E.O
August 2014
,
,
,,
.
.
August 2014
C.E.O
OBJECTIVES:
YE
S
PURIFICATIO
N
NO
TURBIDI
TY
CHECH
YE
S
Sludg
e
waste
FILTRATION
Solid
wast
e
NO
COD /
BOD
CHECK
YE
S
DISINFECTION
NO
CHLORID
E
RESIDUE
YE
S
CL2
INJECTION
UV SYSTEM
FILLING &
PACKAGING
MINERALS
NO
WEIGHT /
APPEARA
NCE
CHECK
INVENTOR
Y & SALES
Markets
YE
S
Quality Plan:
Process
INTAKE FROM
WELLS
PH
CHECK
PURIFICATION
TURBIDI
TY
CHECH
FILTRATION
COD /
BOD
CHECH
Stage
W.I
Q. Charactestics
Responsibilities
WI-PR-01
Flow Rate
Production Operator
Determination of raw
water PH
WI-QC-01
PH
Quality Inspector
WI-PR-02
Flow Rate
Production Operator
Inspection of purified
water Turbidity
WI-QC-02
Turbidity
Quality Inspector
Filtration of water
from fine
suspended solids
WI-PR-03
Flow Rate
Production Operator
Determination of
COD and BOD of
water
WI-QC-03
COD / BOD
Quality Inspector
Purification of
water from large
suspended solids
Process
DISINFECTION
CHLORID
E
RESIDUE
FILLING &
PACKAGING
WT /
Appearan
ce
CHECK
INVENT
ORY &
SALES
Stage
W.I
Q. Charactestics
Responsibilities
Disinfect of water
from germs and
bacteria
WI-PR-04
Production Operator
To check chloride
concentration in
water
WI-QC-04
Chloride Residue
Quality Inspector
Inject of minerals ,
filling and
packaging of the
product
WI-PR-05
Production Operator
WI-QC-05
Weight /
Appearance
Quality Inspector
Storing ,
selling and
marketing of
product s
SMP-01
Batch Size
Production Operator
R.R
CONTROL
CL2 Inhalation
Back injuries
from manual
handling
I.R
CONTROL
Chemical Leak
(anti-Scaleior)
Sludge waste
from purification
unit
Plastic waste
from packaging
unit
NCRS
CORRECTION
CAUSE
CORRECTIVE ACTION
Manual
handling used
due to lack of
handling
equipment's
according to
the clauses
(5.1(e)) , (7.5.1
(c))
Provide
handling
machine such
as fork lift as
soon as
possible
- Lack of
handling
equipment's
- Lack of
reporting
system
Applying of
Automatic handling
system with next
production order
(conveyor
mechanical )
-Availability of
data records
Misunderstandin
g of reporting
system
-Activation of
reporting format
system.
- Developmental
training for
employees on data
analysis techniques
-Perform fire
drill next week
- Lack of
management
commitment
Strength
Weakness
Governance
Application of powerful
regulations
Less Supervisory
Policies
Management commitment
Capabilities
Resources availability
Information
System
Abuse of IT System
Cultural
Lack of awareness
and culture
Standards
Difficulty in applying
modified standards
Opportunity
Threat(s)
Legal
Economic
Prices fluctuations
Technological
Political
Difficulties of importing
spare parts due to the
international
restrictions
Environment
Contamination of the
ground water by
external factors
Interested Parties
Stakeholders
Needs
Employees
Board members
Government
Customers
Contactors
Agency
MRM AGENDA