Crude Oil Refining - Separators, Extractors,...
Crude Oil Refining - Separators, Extractors,...
PROCESSING
INDUSTRY
PRESENTED BY:
MALAYSIA BOLEH
RESEARCH &
CONSULTANCY
MALAYSIA BOLEH
RESEARCH &
CONSULTANCY
MALAYSIA BOLEH
RESEARCH & CONSULTANCY
1. MR. MOHD HILMI MOHD IDRIS
2. MS. ADLINA SNAWI
3. MR. MUHAMMAD SUFFIAN AHMAD
4. MR. ABDUL MAJID IBRAHIM
5. MR. SHAHRUDDIN KASSIM
6. MR. ZAKARIA ABU HASAN
7. MR. FAZIL MAT ZAIN
8. MS. ZURAIDAH KORNAIN
9. MS. ZAUYAH TARMIZZI
10. MR. MARZUKI ZAINAL ABIDIN
PROCESS FLOW
DIAGRAM
Testing
Yard
Big Silos
Day Silo
screener
De-Stoner
PREPARATORY
SECTION
Cracker
Cooker
Flakers
SOLVENT EXTRACTION
PLANT
Dryer
Extractor
Economiser
WET DOC
cyclone
DT-DC
Screener
Oversized lump
Evaporator
Lump-crusher
Mixing & Packing
CRUDE OIL
Storage
Tanks
DOC
Testing
Yard
Big Silos
Day Silo
screener
De-Stoner
Cracker
Cooker
Flakers
Dryer
PREPARATORY
SECTION
Extractor
WET
DOC
DT-DC
cyclone
Economiser
Screener
Oversized
lump
Evaporator
Lump-crusher
Mixing &
Packing
Stripper Cum
Dryer
Storage
Tanks
CRUDE OIL
Storage
Tanks
DOC
MATERIAL FLOW
DIAGRAM (Hexane)
(Miscella+Hexane)
(Jet + Chiller)
Extractor
DT-DC
Economiser
Cyclone
Evaporator
Condenser
Loss
Water-Solvent
Separator
MISCELLA
DOC
MAJOR WASTE
STREAMS/AREAS OF
LOSSES
PROCESS
1
2
WASTE/LOSS
PLACES/AREAS
Preparatory
Section
Day Silo to
Screener
Cracked Seed
Dust
Husk
De-Stoner
Mud Balls
Stone
Mechanical
Cracker
NIL
Condensed
the soy seed
Cooker
Steam
Water
Flaking
Flakers
Soy Seed
Drying
Dryer
NIL
PROCESS
PLACES/AREAS
WASTE/LOSS
Rotary Type
Extractor (RTE)
Hexane
10
Distillation
Hexane
Stripper
Hexane
Condenser
Hexane
11
12
Solvent
Extraction
(Crude Oil
Production)
Water/Solvent
Separator
13
14
Waste Water
Hexane
Hexane
Moisture
Heat
Desolvent
DT-DC
(De-Oiled Cake
Production)
Moisture
Heat
15
Cooling
16
Seaving
NIL
17
Packaging
NIL
FISHBONE DIAGRAM
FISHBONE DIAGRAM
Economiser
Leakage
Hexane supply
system
Evaporator
MACHINE
Chiller
condenser
Hexane/water
seperator
Stripper
(Dryer)
ENVIRONMENT
RTE
Jetcon
Poor air
quality
Inefficient
machine
Process control
not effective
RTE
Poor soy
seed quality
Poor hexane
quality
Poor equipment
calibration
METHOD
Hexane
recovery
system
DT-DC
High
humidity
No standard
operating
procedure
Hexane
Loss
MATERIAL
Human
error
Lack of
training
Lack of
motivation
Poor steam
quality
MAN
PROPOSED
GP OPTIONS
GP OPTIONS
GP OPTION
DESCRIPTION
NEW MATERIAL/
CHEMICAL
ALTERNATIVE
SUPPLIER
4 METHODOLOGY
GP OBJECTIVES
& TARGETS
2
TARGET
3
PROGRAM
1.1
Minimise
Hexane
Usage
2.1
Reduce
consumption
by 10%
within one (1)
year
3.1.1
Maintenance (Total
Productivity Maintenance
TPM)
Condition-based Maintenance
- CBM
3.1.2
Improve Calibration of
equipment
5
ACTION
RESPONSIBLE
PERSONS
4.1.1
5.1
Implement TPM & 5.1.1
CBM
Head of Dept
5.1.2
Maintenance Mgr
5.1.3
Maintenance
Technicians
5.1.4
Contractors
4.1.2
5.1.2
Scheduled
Approved Calibration
calibration
Agency or Company
6
TIME
FRAME
6.1.1
Start
Immediately
& monitor
within one (1)
year.
Annual
review.
6.1.2
Continuousbased on
equipment
validity
3.1.3
4.1.3
5.1.3
6.1.3
Replace old and unreliable
Reliablity Trending Maintenance Manager Continuousequipment
and Analysis
based on
equipment
condition and
technoeconomics
3.1.4
4.1.4
5.1.4
6.1.4
Improve Hexane Quality from Testing of raw
Testing
One (1) year.
Supplier
material
engineer/technician
Annual
review.
OBJECTI
VE
TARGET
PROGRAM
ACTION
RESPONSIBLE
PERSONS
TIME
FRAME
1.2
Reduce
moisture
content
in seed
2.2
Reduce
moisture
to
minimum
acceptabl
e limits
3.2
Incoming
seed
testing
4.2.1
Enforce
Contract
Specifica
tions
4.2.2
Test for
moisture
at
Incoming
Goods
5.2
5.2.1
Head of Dept
5.2.2
Testing Mgr
5.2.3
Testing
engineer/technici
an
5.2.4
Contractors
6.2
Start
Immedia
tely &
monitor
within
one (1)
year.
Annual
review.
1.3
Reduce
husk
content
in seed
2.3
Reduce
husk to
minimum
acceptabl
e limits
3.3
Incoming
seed
testing
4.3.1
Enforce
Contract
Specifica
tions
4.3.2
Test for
husk at
Incoming
Goods
5.3
5.3.1
Head of Dept
Contract &
Operations Sect
5.3.2
Testing Mgr
5.3.3
Testing
engineer/technici
an
5.3.4
Contractors
6.3
Start
Immedia
tely &
monitor
within
one (1)
year.
Annual
review.
OBJECTI
VE
TARGET
PROGRAM
ACTION
RESPONSIBLE
PERSONS
TIME
FRAME
1.4
Optimise
flake
thicknes
s in
Flaker
2.4
Optimis
e flake
to
accepta
ble
limits
3.4
3.4.1
Implement
TPM & CBM
3.4.2
Measure
flake
thickness
3.4.3
Ensure
reliability
of
equipment
4.4.1
Use TPM
4.4.2
Testing
for flake
thicknes
s using
specialis
ed tools.
4.4.3
Use
good
quality
equipme
nt
5.4
5.4.1
Head of Dept
Contract &
Operations Sect
5.4.2
Testing Mgr
5.4.3
Testing
engineer/technicia
n
5.4.4
Contractors
6.4
Start
Immediat
ely &
monitor
within
one (1)
year.
Annual
review.
GP POLICY
GP : POLICY
We are committed to :
1. Answer the societal demands for
higher productivity in a sustainable
manner with preserving the
environment.
2. Ensure the natural environment on
which society depends is not
degraded and polluted.
3. Make a better and cost-effective
approach in implementing efficient and
innovative GP solution.
4. Assist other companies in gaining
their competitive advantages and costeffective reduction of waste and
emissions.