RMS Pre-Bid Presentation
RMS Pre-Bid Presentation
COMPANY
SCOPE:
Design, Supply, Installation and Commissioning
of Remote Meter Reading System (RMS)
inclusive of static energy meter as per Wapda
Specifications by utilizing RF with GSM/GPRS
based hybrid system or totally GSM/GPRS
based fixed network.
Query No.1
Reply
At
present
situation,
LESCO is not inclined for
the option of PLC as RMS
System
due
to
reservations
of
PLC
System. However any
prospective Bidder can
offer PLC System with its
enhanced technological
benefits with proven track
record and up to date
technological standards.
Query No.2
Reply
Query No.3
Reply
Query No.4
Reply
Query No.5
Reply
Query No.5
Reply
Query No.6
Reply
This is an optional
provision can be offered
as an additional feature
as
the part of the
proposal of the Bidder.
Query No.7
Reply
Query No.8
Reply
Query No.9
Reply
Query No.10
Reply
Query No.11
Reply
The
No
of
meters
communicating with one
DCU, the limit is 64.
However the bidder can
enhance its capacity over
this limit according to
design and topology of
network.
Query No.12
Reply
It
is
understood
that
proposed DCU as a part of
network has the ability to
communicate its standalone
components irrespective of
singly phase, three phase or
CT-operated meters. The
operational supply voltage of
DCU is 240 volts and 410
volts 50 Hz.
Query No.13
Reply
Query No.14
Reply
Query No.15
Reply
Query No.16
Reply
Query No.17
Reply
Query No.18
Reply
Query No.19
What exact norms for
meter housing protection
level are expected.
Reply
The specified meter as per
Wapda
specifications
DDS-75, DDS-50, DDs-65,
are well defined like fully
enclosed in poly carbonate
cover.
Query No.1
Please give details of the
"future
meter
reading
needs?
Reply
This is basically
scalability and expansion
of the system
Query No.2
Reply
Query No.3
Reply
Please elaborate
improving revenue
collection methods. Please
also share your vision as
to how this becomes an
objective of the RMS?
Prompt,
correct
and
accurate
reading
will
generate confidence of
customer resulting quick
revenue collection and
better services. At later
stage the ultimate goal
will be customer access to
meter reading through
web.
Query No.4
Reply
Query No.5
Reply
Query No.6
Reply
Query No.7
Reply
Query No.8
Reply
It is mentioned that
MIU/LAN
should
use
telecom technologies such
as RF, Bluetooth, Wi-LAN
etc. and WAN should use
technologies GSM, GPRS,
CDMA, fiber Optic etc.
Please explain what is the
vision behind monitoring
multiple
telecom
technologies whereas at
other
places
it
is
specifically mentioned that
the system should use
only RF/GPRS/GSM.
It
is
an
optional
technological advantage
that a bidder can utilize
while
preparing
its
solution.
Query No.9
Reply
No
Query No.10
Reply
LESCO at present is
running its own billing
system which requires to
be interfaced with the
RMS host server, the
detail of which can be
obtained from LESCO
computer section (o/o of
Director MIS)
Query No.11
Reply
Query No.12
Reply
Query No.13
Reply
There is a contradiction
between number of years
the data is be kept current.
At one place it is
mentioned as 03 years
and at the other place it is
01 year. Please clarify?
Query No.14
Type wise number of
customers
for
each
transformer
is
not
provided. This information
is mandatory to design the
telecom network (LAN and
WAN) and also for the
choice
of
telecom
hardware including MIU
and DCU. A realistic,
practice and cost-efficient
solution can not be offered
without this information.
Reply
The detail information
the mentioned area
sub-division
can
verified at site.
of
of
be
Query No.15
Reply
Reply
These are the optional
requirement to be offered
by the bidder.
Query No.19 to 29
Reply
Please refer page 41,
However the Bidder may
come up with better
computer
hardware
specifications meeting the
latest
international
standard compatible to his
system to be offered.
Query No.1
Reply
Query No.1
of the tender described
under clause IT- 1 (1). The
referred annex- binding
impression to the vendors
for RF based system. We
may suggest that LESCO
should amend Annexure-A
to keep tender document
open for any kind of
system may be offered by
the vendor.
Reply
Query No.2
Reply
Query No.3
Reply
Statement
regarding
connections under Canal
Road
Sub-Division
mentioned on Page 26 &
27 contradicts with each
other.
Please
issue
amendment//correction
accordingly.
The
detail
of
the
connections mentioned is
well elaborated. However,
any particular clarification
will be answered.
Query No.4
Reply
Query No.5
Reply
The
Radio
Frequency
preferably being offered
from a free band. However,
over its particular frequency
selection range will depend
on the choice of the bidder .
Query No.6
Reply
Query No.7-A
Reply
a) 05% upon
commissioning of
complete system.
b) Remaining 05% will be
kept as retention
money for defect
liability and will be
released against
submission of
retention bond for 12months.
Query No.7-B
Reply
B100 % delivery of
meters shall be completed
within
180
days
after
opening of L/C and prototype
approval which ever is later.
Since the installation of
meters
at
consumer
premises is dependent upon
LESCO
convenience
therefore
the
meter
installation work will be
completed within 150 days
(Uninterrupted by LESCO)
after the commencement of
installation work.
PAST
PAST
CURRENT
CURRENT
LEAPFROG
LEAPFROG
Why
RMS ?
Connectivity in AMR
Architecture
1. GSM Based Communication
Single stage communication between Meter and
central station through GSM Modem
2. Hybrid Communication
Two stages of communication in AMR System
Hybrid Communication
Two stages of communication in AMR System