DESIGN BASIS
The Ash Unloading System has to be able to store fly
ashes coming from a pneumatic ash handling system and
to discharge them in open trucks and in closed tankers.
The water used for the fly ash moistening (open truck
unloading) is supplied by the Waste Water Treatment
Plant Sump or by the service water distribution system
Operation
Start-Up
- Fly ash unloading is started locally from local controller. Fly
Ash Silo A/B Filter Fans are started automatically from DCS by
request from Fly Ash Handling System (FAHS)
Shutdown
- Fly ash unloading is shutdown locally from local controller. Fly
Ash Silo A/B Filter Fans can be shutdown manually from DCS.
Abnormal Operation
- If the differential pressure of one filter fan installed on the top
of silo is high, the fly ash handling system on silo defect will be
stopped. If the two silos are full, the fly ash handling system
will shut down automatically.
Alarms
Following alarms are generated:
- Fault of dry unloading on silo A/B
- Fault of wet unloading on silo A/B
- Very high level (MAX3) on silo A/B
- Very high level Fly Ash Silo Sump.
- High temperature on FA Air Heater A/B