WORK PERMIT
MAY SAVE A LIFE OR CAUSE DEATH !
Types Of Permit
Scaffolding Permit
Definitions
ISSUING AUTHORITY
Owner with operating control
Authority given after formal validation Knowledge of
operating area and permit system
RECEIVING AUTHORITY
Responsible for execution of specified job
Authority given after formal validation Knowledge of
operating area and permit system
ACCEPTOR
Any Permanent employee - Nominee of the Executor /
Receiving authority
Responsibilities
ISSUING AUTHORITY
Ensure proper Isolations
Make the job safe, specify the residual hazards & precautions.
Determine scope, effect - Ensure plant conditions remain
unchanged.
Convey residual hazards & precautions
Ensure Cross referencing of Permits
RECEIVING AUTHORITY
Fully understand the job, residual hazards & precautions
necessary to carry out the job..
Compliance of scope Scope remains unchanged
Ensure compliance by his team - ensure that requirements set
forth in PTW are followed by all personnel under his control
Use Correct / Inspected Tools / tackles for the job
Permit to Work
All Jobs Valid for 7 days (Max) Extendable upto 7 days (optional
feature, as per situation)
Hot Work Permit
All welding / cutting / grinding / drilling jobs Valid for 24 hrs (Max)
Vessel Entry Permit
All confined spaces entry (1 meter depth, Hazardous fumes, oxygen
deficiency) Not normal operating area Valid for 24 hrs
Excavation Permit
Agreed work
Information for all concerned
Identified equipment / job
Specified Precautions
All foreseeable Hazards identified
Formal hand over of control of Authority
Discussion between Issuing & Receiving authorities
PTW Requirements
Lockout
Preferred method
Tagout
Performing Lockout/Tagout
Preparation
Identify the energy source(s)
Determine how to control the energy
Dissipate residual energy
Block components subject to movement
Shutdown Equipment
Follow normal stopping procedures
Allow motion to stop
Applying Lockout/Tagout
Removing Lockout/Tagout
Atmospheric Hazards
Facility issued
Contractor issued
Supervisor prepares
Sign In / Out
Atmospheric testing
Hazard controls
Other Hazards
Attendants
Entrants
Be present continuously
Enter the space
Maintain headcount
Perform the work
Maintain contact with
Exit on Attendants
entrants
orders
Orders evacuation,
Supervisor
activates rescue
Perform air monitoring
Prevent unauthorized
Control other hazards
entry
Complete permit
Scaffolding Permit
Erected by Competent
Person
Sound, rigid footing
Tie-Off if no railing
Access ladders
No portable ladders on
scaffolding
Fitness certificate in
place
No overloading
Scaffold Grade Planking
Railings / toe boards