Professional Documents
Culture Documents
Ekspose PLN Litbang For HIDA-METI
Ekspose PLN Litbang For HIDA-METI
PLN
PLN R&
R& D
D--
PLN
PLN-CERTIFICATION
CERTIFICATION
Our Brief
History
2003
2003
Electricity
Electricity
Technical
Technical
Services
Services -Business
Business Unit
Unit
(( UB
UB JTK)
JTK)
1998
1998
Electricity
Electricity
Technical
Technical
Services
Services
(JTK)
(JTK)
Electric
Electric
Research
Research
Center
Center
(PPMK)
(PPMK)
1975
1975
1972
1972
1970
1970
Power
Power
Instute
Instute
(LMK)
(LMK)
Electric
Electric
Power
Power
Research
Research
Institute
Institute
(LPMK)
(LPMK)
Laboratory
Laboratory
1961
Project
1961
Project of
of
PLN
PLN
1966
1966
1964
1964
HV
HV System
System
Calibration
Calibration
Hydro
Hydro Power
Power
1996
1996
R&
R&-D
D
Accreditation
Accreditation by
by KAN
KAN as
as
Product
Certification
Product Certification Body
Body
and
and Technical
Technical Inspection
Inspection
Certification
Certification Body
Body
Acreditation
Acreditation by
by RvA
RvA as
as
Testing
Laboratory
Testing Laboratory
(( Testimed
Testimed at
at 2004)
2004)
Accreditation
Accreditation by
by-Quality
Quality System
System
Certification
Certification Body
Body
Technical
Technical Services
Services-Quality
Quality Management
Management Services
Services-Accreditation
Accreditation of
of KAN
KAN as
as Testing
Testing &
&---Calibration
Laboratory
Calibration Laboratory
Quality
Quality Monitoring
Monitoring
System
System
Product
Product Testing
Testing
-Commisoning
Commisoning
-Standardizati
Standardizati
on
on
2000
2000
April
April 2004
2004
-- Present
Present
AND QA
GENERATION DIVISION
TRASNMISSION &
DISTRIBUTON
HR & FINANCE
POWERPLANT RELIABILITY
LABORATORY
HIGH VOLTAGE
LABORATORY
STANDARIZATION
HUMAN RESOURCES
CHEMICAL, ENVIRONMENT
AND CIVIL LAB
LOW VOLTAGE
LABORATORY
ADMINISTRATION
ADMINISTRATION
POWERPLANT EFICIENCY
LABORATORY.
CALIBRATION
LABORATION
MANAGEMENT SYSTEM
AND CONSULTAN
FINANCE
POWER SYSTEM,
INSTALLATION &
PROTECTION
LABORATORY.
KNOWLEDGE
MANAGEMENT
IT
SHORT CIRCUIT
LABORATORY
Human Resources
TOTAL HR = 190
2. PRIMARY ENERGY
LABORATORY
Lay out
Established in 1972, as a micro/mini hydro testing
Lay out
Head : 27 32 mtr.
Inflow : 1,6 m3/s (max).
RESERVOAR
OFFICE
Head : 42 47 mtr.
Inflow : 1,6 m3/s (max).
LTA CIPAYUNG
PENSTOCK 1;
0,7;0,5 mtr
7 mm thickness
RESERVOIR / HEAD
POND
20 x 8 x 6 meter (
1000 m3)
INTAKE GATE
BY PASS CHANNEL
TAIL RACE
Completed Research
Next Project
Terima Kasih
Thank you
Arigato
Gamsa Hamnida
Xiexie
12
Central - I &
II
CENTRAL - 2
CENTRAL - 1
= 331
turbine.
rpm....
back
Central III
Gross Head : 27 32 mtr.
Net Head : 25,47 mtr
Inflow : 1,6 m3/s (max).
Currently Not
Operating.
Turbine has been
moved to Central IV.
back
Central IV
back
Annual Production
back
back
back
back
Main Activities
Research
- According to direction from Holding
Co
- According to request from
BusinessUnits/Subsidiaries
- R&D Activities Identified by PLN R&D
- Technical consultation, Investigation
- Assessment of
technology/system /method prior to
implementation in PLN
1.Testing Laboratory
Acting as independent
accredited testing
laboratory
2. Calibration
Electrical and non-electrical
equipment
Systems
ISO 14001 : Environment Management
System
OHSA 18001 : Occupational Health and
Safety Management System
- SA 8OOO : Social Accountability (in
planning)
Research Groups
1.
2.
3.
4.
5.
b,
instrument-control lab.
Details of What We Do
Testing
Electrical
Distribution equipment, switchgears, cables, home
appliances test
LV and MV equipment test
High voltage test ( switching impulse, partial discharge
)
High power short circuit test
Material / Mechanical
Material test
NDT of power plant components
Vibration, balancing & noise of power plant systems
Details of What We Do
Civil & Environment
Soil mechanics test in laboratory and in situ
tests, concrete test
Geotechnical and hydrology survey
Topography mapping and measuring
Chemical & Material Analysis
chemicar anarysis of lubrication oil, transformer
oil, cooling water
Material hardness and corrosion analysis
Sea water infiltration and pollution on electrical
installation analysis
Details of What We Do
Calibration
Electrical measuring equipment / instrument
Details of What We Do
Other Facilities & Services
Technical information
Industrial standards
Library & Literature retrieval services
Technical Seminar / Dissemination
Development of Company Standards
Future Roles
PLN head office have indicated they would
efficiency
improvement,
reliability
enhancement and quality improvement, of
power production and delivery
Future Roles
PLN R&D is expected to conduct research
of
Outdoor
Insulator
Performance in Chemically Polluted Area
(Kamojang Geothermal)
6. The change of MCB characterization
type C and CL on Harmonize Current
7. Assesment of Insulator Damage in
Denpasar
Generation
1. Undersized