 BRTS
 What is BRTS ?

 Components of BRTS.

 Reasons for its implementation.

 IMPACT OF BRTS
 On environment.

 In increasing comfort levels for public.

 In reducing the hazards that are being created by traffic


jams.
 BRTS IN VISAKHAPATNAM
 City profile.

 Why BRTS in Visakhapatnam ?

 Modification of existing roads in Visakhapatnam.

 Detailed analysis and its implementation.

 CONCLUSION
 BRTS combines many of the
features of rail systems with
the flexibility & cost savings of
over-the-road vehicles.
BRT Transition
2003-08 Chiragh Delhi
 RUNNING WAYS

 VEHICLES

 STATIONS

 SERVICE

 FARE COLLECTION

 INTELLIGENT TRANSPORTATION SYSTEM


REASONS FOR IMPLEMENTING
BRTS
• Shorter trip times
• Short wait
• Easy to use
• Accessibility
• Comfortable
• Integrated.
• Distinctive
• Low environmental impact
• Incremental development
IMPACT OF
BRTS ON
ENVIRONMEN
T
ACCIDENT COLLISION MATRIX
TYPE HEAVY LIGHT NMT
FAST FAST
Truck / Lorry 1 0 0
Bus 0 1 0
Tempo/Van 0 0 0
Jeep 0 0 0
Car 1 0 0
Three Wheeler 7 13 0
Two Wheeler 32 46 0
Bi-Cycle 8 9 0
Pedestrian 20 89 1
Inmates/Auto passenger 0 9 0
Self 1 2 0
Pillion rider 0 1 0
Existing scenario ….

 Chaos at bus shelters


 Bus stops in the middle of the road; commuters don’t use bus shelters
 Commuters cross six lanes to access bus shelters
 ABOUT 4.5 lakh REGISTERED VEHICLES (2007)
 Cars (12%), Two Wheeler (73%), Autos (6%)  90%
 CITY PUBLIC TRANSPORT
 600 CITY BUSES
 DAILY PUBLIC TRANSPORT TRIPS – 3 lakh
 SUPPLY OF 25 CITY BUSES / lakh RESIDENTS
 PASSENGER DEMAND IS SHOWING DECREASING TRENDS
 TOTAL ROAD ACCIDENTS 1000
 10% ARE FATAL
 239 PERSONS KILLED
 INTERMEDIATE PUBLIC TRANSPORT (AUTORICKSHAW &
CYCLE RICKSHAW)
 AVERAGE SEATING IN AUTO RICKSHAWS IS ABOUT 4 IN
THE PEAK HOURS
Aruku

a
at
lk
Ko
Vepagunta STC
Co r
rido i
r ili
im
Simhachalam Hill Bh

NAD Maddilapalem
Jn
PTC C
o rridor

it y
e rs
iv
Air Port Un
a
d hr
An

s t
ru
T
rt
Old Town
Po

l
ga
g
za

en
Vi

B
of
Gajuwaka

y
Ba

VIEW OF VIZAG CITY


 THERE ARE ABOUT 4.5 LAKH (BY NOV 2007) REGISTERED VEHICLES
- 90% ARE CARS & TWO WHEELERS
 TRAVEL DEMAND OF 12 LAKH PASSENGER TRIPS PER DAY
 PRIVATE VEHICLES CONTRIBUTE TO 65% OF TRAVEL NEEDS (7.8
LAKH TRIPS)
 TRAVEL DEMAND PROJECTED TO GROW TO 16 & 28 LAKH TRIPS PER
DAY BY 2011 AND 2021
 IN FUTURE ROAD CAPACITY WILL BE A CONSTRAINT
 TRANSPORT NETWORK WILL NOT ONLY REQUIRE EXPANSION BUT
WIDENING / STRENGTHENING, AS WELL ..
 ARREST THIS TREND AND PROMOTE PUBLIC TRANSPORT - TARGET
ABOUT 50% MODAL SPLIT BY 2011 (present share below 20%)
 THEREFORE, PLANNING, DESIGN AND IMPLEMENTATION OF A HIGH
CAPACITY PUBLIC TRANSPORT SYSTEM IS A PRE-REQUISITE
OF PROPOSED BRTS
CL CORRIDOR

NMV MV LANES
LANES PROPOSED CURB PROPOSED CURB

PROPOSED PAVEMENT
STONE
Bus Lanes STONE

PROPOSED PAVEMENT
MARKING (with MARKING (with
Thermoplastic Paint) Thermoplastic Paint)

 SLOPE 2.50 %  SLOPE 2.50 % SLOPE 2.50 % SLOPE 2.50 %


PROPOSED
FOOTPATH

PROPOSED
FOOTPATH
NMV PROPOSED PROPOSED BRTS PROPOSED NMV
CARRIAGEWAY CORRIDOR CARRIAGEWAY

2.00 2.50 6.50 7.00 6.50 2.50 2.00


0.10 0.40 0.40 0.10

R O W 30.00M

FOR TENDER PU
NOTE : ALL DIMENSIONS ARE IN MM.

GREATER VISAKHAPATNA
CLOF PROPOSED BRTS
CORRIDOR

PROPOSED CURB
STONE

PROPOSED PAVEMENT PROPOSED PAVEMENT


MARKING MARKING

 SLOPE 2.50 % SLOPE 2.50 % SLOPE 2.50 % SLOPE 2.50 %


ROW

ROW
PROPOSED
FOOTPATH

PROPOSED
FOOTPATH
PROPOSED PROPOSED PROPOSED PROPOSED BRTS PROPOSED
NMV CARRIAGEWAY NMV
BUS SHELTER BUS BAY CORRIDOR CARRIAGEWAY

2.00 2.50 6.50 3.40 7.00 6.50 2.50 2.00


0.10 3.00 0.40 0.10

ROW - 36.00M

FOR TENDER PURPOSE ONLY


NOTE : ALL DIMENSIONS ARE IN MM.

GREATER VISAKHAPATNAM
MUNICIPAL CORPORATION
\ \An u\e\ PAWA N\SREI - LOGO.jpg
DESIGN & IMPLEMENTATION OF BUS RAPID
Infrastructure Finance Ltd.
TRANSIT SYSTEM IN VISAKHAPATNAM CITY
CORRIDOR :- P T C. CORRIOR
MODE SURE (%) UNSURE (%)
CAR 18 28
2-WHEELER 21 32
AUTO 54 19
CYCLE 15 42
CYC RICK 32 35
RANGE (25 TO 40%)
 It is estimated that about 10% of Cars, Two
Wheeler and Cycle passengers will shift to BRT
 Highest shift of passengers is likely to be 50%
from auto rickshaw commuters – current fares
are higher than city bus
 The Growth of the nation is dependant on its
transport system
 BRTS provides
 Savings in fuel consumption in terms of foreign
currency
 Safety to users
 Faster commutation
 Attraction of foreign tourists

BRTS can be implemented under BOT system, which


reduces initial investment by government

Hence there is an urgent need to improve the transport


system and the only answer is BRTS
 Greater Visakhapatnam Municipal
Corporation
 Excerpts from International Seminar on
BRTS organized by GVP College of
Engineering and IGIAT.
Queries
???
* The Background depicts the coast of

You might also like