HS Construction MED : (Date Month 20XX, Name, Department, Etc.)
HS Construction MED : (Date Month 20XX, Name, Department, Etc.)
Until last year each country was working with different HS Plans,
different versionsFrom a SBU point of view, was not under
control!
All Modules except MOD III, will be the same for every country.
This means that, MED will control the revisions of the rest of
Mocules except MOD III. This will be responsibility of the
countries.
MOD.II
MOD. II
MOD. III
MOD. IV
Risk Assesmment
Emergen-
cy Plan
Unloading on site.
Signaling, fencing, barricades
Preparation and Installation of main components
HV Wire
Ladder, safety line, elevator
Energization
-
MOD.III;
-
Appendix II;
- This must be placed inside each turbine after the installation, during
the commissioning.
Appendix II
Others;
Annexes to HS Plan;
What is an annex to HS Plan? Document including a WKI/procedure &
RA explaining how to do a work step by step.
When do we need to work out an annex? If the work to be done is not
include in the HS Plan.
Who must check if the works are included in the HS Plan? PM is
accountable.
Who must work out the WKI/procedure? PM is accountable.
Who must work out the RA and annex? Local HSE Coordinator from
Vestas.
How can we establish a method to ensure that we are covered all the
time? Trough weekly meetings, Normally on Thursday afternoon.
Follow WKI for artificial lighting. This WKI explain the material needed, ilumination
towers, portable lightining, luximeter, etc. How to do, where
For this case, the HSE coordinator will adapt these contents to local law including
same information.
Will create a doc. including correspondences of both docs.
2. Maybe the HS Plan is responsability of each subcontractor and Main contractor doesn
t develope this plan.
Two possibilities:
o
o
We send our HS Plan to the subcotractor and they change Vestas Logo by theirs.
Or, Sustainability will compare our HS Plan with theirs ir order to ensure that the
requriements are the same, in any case MOD. II for Installation of the WTG will be
ours.
Name of WF
Project Manager and Installation Supervisors of Vestas
Main Contractor/s
Flowchart of companies (Customer, main contractors, subcontractors)
Scope of contract; EPC, Supply and Installation, Supply, supervision and commissioning,
Type of WTG, model, Number of WTGs, Hub height and type of foundation (Anchor cage?)
Mod.III EN.doc
All reference to legislation, royal decrees, laws, technical standards, directives, etc. that are
applicable to a construction site as described herein must be included in Module III so that the
relevant ones are included for each area. In any event, this document shall never be used in its
standard form. It must be adapted to the characteristics of each project, taking into account possible
variations, building system changes.
Costumer data:
Human resources
Minimum and maximum people working in the WF in the different phases of the project; civil works,
electrical works, transmission lines, Installation of WTGs, commissioning.(estimate).
Substation
Where is main substation where the WF substation will be connected? Or where is going to be
connected the evacuation line?
- Name
and address of the Electrical company?
Budget
WF Location, address.
10
The PM will be accountable of this recruitment following the document Safety care service
specifications VSEGSPEC.
During work:
Access control and staff on site
- Signaling, barricades.
During operations where main components are being mounted, access roads
must be blocked as follows:
For erecting of T1 and T2: Maximum height of crane for lifting the "T" section, plus 30 mts.
For erecting of T3, T4, (T5 to T6 towers of 119 m and 7 for towers of 140 meters) Nacelle, blades and hub (if mounted
above) they shall refer the hub height plus 40 mts.
Both for point 1 to 2, will be measured from the base of the turbine.
For more information about see Summary guide, attached.
Lifting plans
Microsoft Word
97 - 2003 Document
Incident reporting
How does the IDB works?
What FR are you using?
Exercise; Create an incident and upload it into the IDB
Have you received training about Incident management?