Professional Documents
Culture Documents
RADWIN Mobility Case Study v07
RADWIN Mobility Case Study v07
Company Overview
RADWINs Solution
CASE STUDIES
Project Status:
Outdoor and underground Proof of
competitors
Phase #1:
Outdoor
Trial
Phase #2:
Tunnel
Trial
Way#
2
2169 m
Way#
1
2150 m
5/24/12
Confidential
Pilot
area
sensitive data
Project Status:
5/24/12
Confidential
BS
Installatio
n
Train
Installatio
n
5/24/12
Confidential
10
Camera
Installatio
n
Metro NOC
5/24/12
Confidential
11
full duplex
4 operational patrol cars
Tough environment -
Page
Customer: IDF
Project requirements:
Integrate RADWIN solution in the G-NIUS UGVs (Unmanned Ground
Vehicles).
6km range of border.
Provide 3Mbps full duplex for 3 operational UGVs simultaneously.
100% availability, ensuring high resolution video even while driving
on creeks.
Page
ME Border Deployment
IDF Operational
UGV
Page
Customer: ACSA
Project requirements:
Transmission of high resolution video streaming from CCTV
Ethernet Access
5 operational patrol and emergency vehicles
100% availability, ensuring high resolution video, low latency for
PTZ cameras
5/24/12
Confidential
15
Customer: Codelco
Project requirements:
Unmanaged mine tractor control
Provide 6Mbps full duplex for HD camera
100% availability, ensuring high resolution video even while driving
Thank You!