Presentation For Expectation On Requirement of Site Engineer, Contractor and Builders
Presentation For Expectation On Requirement of Site Engineer, Contractor and Builders
ON REQUIREMENT OF SITE
ENGINEER, CONTRACTOR AND
BUILDERS
BY. MANISH DHOKAI
Trade / Non-Trade
Trade/Non-Trade
Trade
25%
Trade
Non-Trade
Non-Trade
75%
Most Prefer Brand
Pripority of Brand
UITRATECH
AMBUJA
TATA
HATHI 15 % J .K LAXMI
B IN AN I
7%
SIDHEE 9 % KAMA L
S A NGHI 3%
SANGHI 19 %
TATA
UITR ATECH
J.K LAXMI 15 %
Mix
19%
PPC
19% OPC
62%
S TR ENGTH
EFFECTIVE FECTOR
S ETTING TECHNICAL
TIM E S UP P ORT
AF TER S ALE
S ERVICE
C OLOR P ACKING 8% 12 % S TRENGTH
9% 22%
DELIVERY
DELIVER Y 17 %
P AC KING
COLOR
AF TER S ALE 9%
S ER VIC E
S ETTING TIME
2 3%
TEC HNIC AL
S UP P OR T
Payment Terms
CAS H
Mo re than 7 DAYS 6%
38% ADVANCE
0% 3 DAYS
13%
M o re t han 7 D A Y S
68%
Strength
o High Strength for special task
o Strength as per requirement no more no less
o Special cement for underground tank
Setting Time
o Too high, requirement little bit slowly.
o Require high setting time specifically in winter
o Initial setting time should be slow final is good
enough.
Expectation
Color
o Color is not a matter
o Need more Black or dark
o Its not effect the construction; however it’s
create cosmetic value.
Delivery
o On time delivery
o Need to improve
o At present its better try to maintain. (for Tata)
o On time material supply it’s also create a brand
image.
Technical
Expectation Support
o Design an audio visual movie in local language in
that way the contractor can easily
understand.
o At least provide cube testing special in high earth
quack zone.
o Provide technical equipment like measurement
unit.
o Testing facility should be providing by independent
lab only.
o In the proportion of water cement ratio there is no
any equipment to measure water. Need
some measurement unit.
o Organize Technical meets for special for
contractor.
Perception