Download as ppt, pdf, or txt
Download as ppt, pdf, or txt
You are on page 1of 28

Digital Cable Records Management System

(A solution for Cable Records management using Geo Enabled Surfing on Customer Access Network (gSCAN))

An initiative of BSNL, Kerala Circle

Digital Cable Records Management System

Why DCRMS?
1.
2.
3.
4.
5.
6.

To Reduce Access Network Fault Rectification Time.


To enable Focussed/Location based Marketing.
Make Spare Pair Availability information on Finger Tip.
To Check the feasibility of new connections at Junction Points.
To Know the Customer Location and Link from MDF to Customer Premises.
Preparation of Cable Diagram with Google Map

How it is different from Conventional CRMS Systems?


1. Integrated with CDR data to fetch maximum information on Cable Terminations.
2. Geo Enabled Interfaces will enable the Geographical Area View during data entry.
3. Multi-Tier architecture for Data Entry in a Phased Manner.

Digital Cable Records Management System

Three Tier System Architecture

1. Cable Network Termination Nodes Capture Module


2. Cable Network Termination Mapping Module
3. Cable System Mapping Module

Digital Cable Records Management System


Multi Tier Data Capture DCRMS

1. Customer Transfer
from CDR

4. Cable
Terminations
Mapping

2. Master Data
Capture from CDR

5. Cable Network
Entry

3. Master Data
Entry/Edit by
Exchange

6. Cable System
Mapping

Digital Cable Records Management System

Data Sources

1.

CDR Data

2.

MDF Diagram

3.

Primary Cable Diagram

4.

Distribution Cable Diagram

5.

Other sources

Digital Cable Records Management System


Data Capture

1. Customer Transfer
from CDR

3. Master Data
Entry/Edit by Exge

2. Master Data
Capture from CDR

CDR/IT
1

Customer Master

Termination Details

Main Locality

Sub Locality

Exchange
IT

Cable Routes

Pillar

Locations

DP

Pillar Locations

DP Locations

DP Termination Size

Exchange
Exchange
1

MDF-Pillar Mapping

Pillar-DP Mapping
4. Cable
Terminations
Mapping

Cable Along Routes


5. Cable Network
Entry

Exchange
1

6. Cable System
Mapping

Mapping of Cables
at MDF, Pillars and
Joints

Digital Cable Records Management System

CDR

DCRMS

Main Locality

Cable Routes

Sub Locality

Locations

Roads in which
Cables are Laid

Locations of Pillars, DPs, Joints and Diversions


Concept of Main Locality, Sub Locality, Routes and Locations

Digital Cable Records Management System

Step 1 : Exchange Entry in CRMS

Exchange Location

Exchange Area

Cable Exit Face Line

Zoom Factor (Default


16)

Telephone
Exchange

Digital Cable Records Management System

Cable Routes
It is the route along which the cable is laid in the Main Locality. This
is Mandatory. Two Interfaces are available
1.

Text Mode Interface


DCRMS=>Master Data=> Cable Route Details Entry

2.

Graphical Mode Interface in gSCAN

Digital Cable Records Management System

Step 2 : Routes Entry in CRMS/gSCAN

Moscat Hotel
Road

Nandancode
Road

Vayalar Statue-PMG Bose Statue


Road

Route Name

Route Type

Route Start LatLon

Telephone
Exchange

Digital Cable Records Management System

Locations

It is a point where Pillars, DPs , Joints etc are situated in a sublocality.


This is mandatory.
Two Interfaces are available
1.

Text Mode Interface


DCRMS=>Master Data=> Location Details Entry

2.

Graphical Mode Interface in gSCAN

Digital Cable Records Management System

Hera Flat

Step 3 : Locations Entry in CRMS/gSCAN


PWD Office
LMS Jn

Pillar

DPs
Diversions

Corporation
Office
Kanakanagar

Joints
1

Route

Sub Locality

Location Name

Location Marked Side

Location LatLon

Devarajan
Statue

Telephone
Exchange

Digital Cable Records Management System

Pillar Edit

Pillar Data with Pillar No and Name will be Made available from CDR.
Pillar Name and Pillar Size can be edited.
Location and Side should be added

Text Mode Interface


DCRMS=>Master Data=> Pillar Details Entry

Digital Cable Records Management System

Step 4 : Pillar Edit in CRMS

LMS Jn

Pillar

Pillar Name

Pillar Number

Pillar Size

Pillar Location

Pillar Side

Telephone
Exchange

Digital Cable Records Management System

DP Edit

DP Data with DP No and DP Name will be Made available from CDR.


DP Name , DP Size and No of DP Terminations can be edited.
Location and Side should be added

Text Mode Interface


DCRMS=>Master Data=> DP Details Entry

Digital Cable Records Management System

Step 5 : DP Edit in CRMS


Corporation
Office

DPs

PWD Office

DP Name

DP Number

DP Size

DP Terminations Size

DP Location

Telephone
Exchange

Digital Cable Records Management System

MDF-Pillar Mapping
MDF Tags and Pillar-In Tags can be Mapped using this Interface.
MDF No

Vertical

Pillar

CTBox

CT Box

Tag From

Tag From

Tag To

Tag To

Text Mode Interface


DCRMS=>MDF-Pillar Mapping

Digital Cable Records Management System

Pillar-DP Mapping
Pillar Out Tags and DP Tags can be Mapped using this Interface.
Jumpering on PillarIn - PillarOut will happen automatically.

Pillar
CTBox

DP

Tag From

Tag From

Tag To

Tag To

Text Mode Interface


DCRMS=>Pillar-DP Mapping

Digital Cable Records Management System

Cable Network Entry

Cable Laid along routes can be added through this module.


100% Data to be collected and recorded in the system.
Two Interfaces are available
1.

Text Mode Interface


DCRMS=>Cable Network Entry

2.

Graphical Mode Interface in gSCAN

Digital Cable Records Management System

Step 6 : Cable Entry in CRMS/gSCAN

Cable Size

Cable Name

Start Termination

Starting Location

Ending Location

Cable Road Side

MDF Exit

Cable Laid Type

Kanakanagar

Joint

Telephone
Exchange

Hera Flat

Digital Cable Records Management System

Hera Flat

Step 7 : Cable Diversions in CRMS/gSCAN


SFS Flat Jn

Convent School Jn

Petrol
Pump Jn
Kanakanagar

Exchane Jn

Joint

Telephone
Exchange

Digital Cable Records Management System

Cable Network Mapping


This is the Mapping of Cable Pairs with MDF Tags, Pillar Tags, DP Tags and
Other cable pairs in joints.
100% Data to be collected and recorded in the system.
Pair Status as Working or Spare will be automatically recorded by the
system using CDR Data.

Text Mode Interface


DCRMS=>Cable Network Mapping

Digital Cable Records Management System

Step 8 : Cable System Mapping in MDF using CRMS


SFS Flat Jn

Convent School Jn

Petrol
Pump Jn
Kanakanagar

In MDF
Cable
Name

Pair From

Pair To

MDF

Vertical

1200/0.5

1101

1200

18

CTB Pair
From

CTB Pair
To

Tail End

100

Joint

Joint

CTBox

Exchane Jn

Telephone
Exchange

Hera Flat

Digital Cable Records Management System

Step 9 : Cable System Mapping in Joint using CRMS


SFS Flat Jn

Convent School Jn

Petrol
Pump Jn
Kanakanagar

Cable
Name

Head End
Pair From

Head End
Pair To

Head End
Cable

Head End
Pair From

Head end
Pair To

1000/0.5

901

1000

1200/0.5

1101

1200

Terminated
In
Joint

Exchane Jn

Joint

Telephone
Exchange

Hera Flat

Digital Cable Records Management System

Feasibility Check
Using this interface, feasibility can be checked if any of the following is
known.
1. DP Number/DP Name
2. Location
3. Sub Locality
4. Nearest Telephone Number of Applicant
System will give the feasibility report from MDF to DP.
If required, the pair can be marked as a reserved pair.
Text Mode Interface
DCRMS=>Feasibility Check

Digital Cable Records Management System

Add-Ons
Phone Number Edit
If required, any terminations regarding a Phone Number can be edited
through this link.
Text Mode Interface
DCRMS=>Phone Number Edit
Status Change
The status of Spare Tags can be changed through this interface.
DCRMS=>Status Change.

Digital Cable Records Management System

Action Plan
1.

The rollout date needs to be decided and to be inputted by the concerned SSA
for each set of exchange.

2.

The action plan and rollout progress will be coordinated centrally by Circle
office (OP Section/ L2 DCRMS L2 Team)

3.

For any queries / support, field unit may contact only through
dcrmsL3krl@bsnl.co.in (IT Cell-L3 Team)

4.

Field units may ensure correctness of data extracted from CDR (Pillar / DP /
Locality / TAGs / Verticals) before operating DCRMS.

5.

Field units may ensure the synchronization of termination data in both CDR
and DCRMS simultaneously, whenever it occurs.

Digital Cable Records Management System

Thank You

You might also like