Drilling Presentation 2010

You might also like

Download as ppt, pdf, or txt
Download as ppt, pdf, or txt
You are on page 1of 17

Upstream Business Unit

ROMPETROL DRILLING & WORKOVER

2010

Drilling & Workover Division


Rompetrol Drilling & Workover Division (RDW) is a member of:
International Association of Drilling Contractors (IADC) since 1985
Romanian Association of Drilling Contractors (RADC).

RDW, implemented an integrated management system for quality


assurance, environmental protection and HSE, according to ISO
9001-2008, ISO 14001-2004 and OHSAS 18001-2007.

Drilling & Workover Division


Services Portfolio

Drilling oil, gas and water wells.


Well completion and workover.
Running casing and tubing strings.
Mudlogging services.
Mud engineering and consultancy for drilling and workover.
Refurbishing and maintenance of rigs.
Equipment and tools rental.
Pumping, testing operations and water wells sand cleaning.
Rig management.
Manpower provider.

Drilling & Workover Division


Brief History
Over 35 years of experience in providing cost effective,
expert labor and professional services to the international
oil and gas industry.
Over 550 wells drilled in Syria, Algeria, Egypt, Iraq,
Jordan, Libya, Sudan, Greece.
Over 210 workovered wells in Libya.
Mudlogging services in Holland, Tunisia, Moldova,
Denmark, Hungary, Bulgaria, Libya, Offshore Black Sea,
Romania.
Consultancy for drilling and workover in Algeria, Iraq,
Jordan, Greece, Ecuador, India, Libya.
Consultancy for mudlogging in Kazakhstan, Senegal,
United Kingdom, Sudan, Armenia.

Drilling & Workover Division


Drilling and Workover Achievements
Clients and Partners

SONATRACH , Algeria
GENERAL PETROLEUM CO, Egypt
IRAQ NATIONAL OIL COMPANY
SYRIAN PETROLEUM CO
SOUTH OIL CO. , Iraq
NATURAL RESOURCES AUTHORITY, Jordan
REPSOL OIL OPERATIONS, Libya
KUWAIT OIL CO
PETROLEUM PRODUCTION & UTILIZATION PROJECT, Sudan
HELLENIC PETROLEUM, Greece
DATALOG TECHNOLOGY LTD., North Sea
LASMO GRAND MAGHREB, Libya
VEBA OIL OPERATIONS, Libya
BOSNA-S OIL SERVICES, Libya
PETROPRODUCCION, Ecuador
YPC, Yemen
ONGC, India

Drilling & Workover Division


Locations
TRIPOLI Headquarters

KREMCO K160 Rig

AWBARI Base &


KREMCO K100 Rig

TW 125 Rig

Drilling & Workover Division


Drilling & Workover Assets
Depth
Description

Maximum
Hook
Load

Manufacturer

Present
location

Work
over

Drilling

tons

350

20

UPET Romania- 1985

Libya

FA - 25
KREMCO
100

3,650

2,000

100

National Oilwell - DRECO


- CANADA - 1998

Libya

KREMCO
160

6,000

2,500

160

National Oilwell - DRECO


- CANADA - 1997

Libya

TW 125 CA - A6

4,800

2,200

125

UPET Romania 2005 2006

Libya

WILSON 42
B 500

6,000

2,000

157

WILSON - USA

Ecuador

WILSON 42
B 500

6,000

2,000

157

WILSON - USA

Ecuador

COOPER
550 LTO

6,000

2,000

150

COOPER - USA - 1989

Ecuador

Offshore
Mudlogging
Unit

1 unit

Datalog Technology

Romania

Onshore
Mudlogging
Unit

2 units

Datalog Technology

Romania and
abroad

Drilling & Workover Division


Drilling equipment capabilities
Depth
Description

Maximum
Hook Load

Work over

Drilling

tons

350

20

FA - 25
KREMCO 100

3,650

2,000

100

KREMCO 160

6,000

2,500

160

TW 125 - CA - A6

4,800

2,200

125

WILSON 42 B 500

6,000

2,000

157

WILSON 42 B 500

6,000

2,000

157

COOPER 550 LTO

6,000

2,000

150

Kremco 100
Kremco 160

TW 125 CA A 6

Drilling & Workover Division


Mudlogging equipment capabilities
Drilling parameters Monitoring

User configurable displays


User configurable screen plots
User configurable charts

Database Reporting

Automatic time and depth databases


User configurable logs
Export to remote QLOG databases
ASCII export to 3rd party databases

Real time monitoring and historical


record of over 300 parameters

All rig parameters and functions


Hydraulics
Trip monitoring
Pore pressure
Geological parameters such as normalized gas
LWD-MWD Data importing

Drilling & Workover Division


Mudlogging screen

Drilling & Workover Division


Operations and work experience

Item

Denomination of project/ contract

Client

Completion period

Drilling 2 wells with one F 320 3 DH rig, maximum


depth 5,000 m.

SYRIAN PETROLEUM CO.


Damascus-SYRIA

1975 - 1977

Drilling 180 onshore oil wells with10 (ten) F 320 3 DH


rigs, maximum depth 5,000 m.

SONATRACH - Algiers,
ALGERIA

1976 - 1984

Drilling 22 onshore oil wells with one F 320 3 DH rig,


maximum depth 3,500 m

GENERAL PETROLEUM CO.


Cairo - EGYPT

1981 - 1987

Drilling onshore oil wells with 4 (four) F 200 2 DH rigs,


maximum depth 2,500 m

IRAQ NATIONAL OIL CO.


Baghdad - IRAQ and NORTH
OIL COMPANY - Kirkuk IRAQ

1982 - 1990

Drilling onshore oil wells with 2 (two) F 320 3 DH rigs


(maximum depth 5,000 m) and work over services with 2
(two) F 100 DH rigs

SOUTH OIL CO. Basrah IRAQ

1982 - 1990

Drilling & Workover Division


Operations and work experience contd
Item

Denomination of project/ contract

Client

Completion
period

Drilling works with two F200 2 DH rigs

DEP GREECE

1976 - 1982
1986 - 1990

Drilling works with one F - 125 rig

DEP GREECE

1982 - 1984

Mud logging operations with one DATALOG mud logging


unit

NATIONAL WORKOVER AND


DRILLING CO
Tripoli, LIBYA

1996

Association contract for carrying out work over operations


in Ecuador with 3 work over rigs

GEOPETSA S.A., Quito, ECUADOR

1996 until now

10

Mud logging operations in Holland with one mud logging


unit type DATALOG

DATALOG Technology Ltd. UK

1996

11

Mud logging operations in Moldova

DATALOG Technology Ltd. UK

1996

12

Mudlogging operations in DENMARK with one mudlogging


unit type DATALOG.

DATALOG Technology Ltd., UK

October 1998
January 2002

Drilling & Workover Division


Operations and work experience contd
Item

Denomination of project/ contract

Client

Completion period

13

Drilling 3 water source wells & 2 exploratory wells with


KREMCO K160 rig, with the depth range of 1,200 m to
1830 m.

REPSOL OIL OPERATION,


Tripoli, LIBYA

Dec.24, 2000
Sept.30, 2001

14

Drilling 3 water wells & worked over 2 water wells with


KREMCO K 160 rig, with the depth of 600 m.

LASMO GRAND MAGHREB


LTD.,
Tripoli, LIBYA

April 21, 2002 June


21, 2002

15

Drilling & completion of ground beds for cathodic


protection system, 5 wells with FA 25 rig, with depth of
230 m.

BOSNA - S OIL SERVICES


Co., Tripoli, LIBYA

2002

16

Work over services performed with KREMCO K 100 rig


with depth of 2,150 m.

REPSOL OIL OPERATIONS,


Tripoli, LIBYA

January 24, 2002


In progress

17

Drilling of 6 water wells with T 50 rig, with maximum


depth of 600 m.

TASHRIKIAT EL YANABIA,
Tripoli, LIBYA

Started in December
2001
May 2003

18

Work over services performed with KREMCO K 160 at


wells with total depth of 4,500 5,000 m

VEBA OIL OPERATIONS,


Tripoli, LIBYA

Started in 28 February
2003;
In progress

19

Running casing services, as Baker Oil Tools


Subcontractor

Repsol Oil Operations &


REMSA

Started in November
2005;
In progress

Drilling & Workover Division


Operations and work experience contd

Item

Denomination of project/ contract

Client

Completion
period

20

Mudlogging services with Rompetrols unit

STERLING RESOURCES, UK

2005

21

Mudlogging services with Rompetrols unit

EXXOIL, Tunisia

2005

22

Mudlogging services with Rompetrols unit

TOREADOR RESOURCES
CORPORATION, USA

2006, now in
progress

23

Manpower Consultancy Agreement to provide Data


Engineers and Mudloggers on Saturn Jack Up

DATALOG Technology Ltd. UK

2005-2008

24

Mudlogging services with own units

OMV Petrom; Ascent Resources;

2008-now in
progress

Drilling & Workover Division


Quality Policy Statement
For the achievement of the goals and objectives, established
through the contract and the company status, DRILLING &
WORKOVER DIVISION management aims to consolidate the leader
position in performing drilling & work over services and other special
operations at the oil, gas and water wells and also as a reliable
partner for its traditional clients from the country and from abroad. In
this meaning, we aim to act for:
Anticipation and fulfilment of the clients requirements, as well as
overcoming their expectations each time.
Permanent improvement of the working way in order to deliver the
best products and services, fast and with efficient costs compared to
those of our competitors.
For that matter we promote a quality policy that aims:
Process management, focusing on results and permanent
improvement, with accent on the client-supplier relationship.
Measuring and monitoring the satisfaction degree of our clients,
regarding the products/services that we give, thus being always
prepared to act towards the increasing of their satisfaction.

Drilling & Workover Division


Strengths
Strong relationship with our customers.
Highly professional, competent and motivated
staff.
Perform quality drilling, workover and oilfield
services at competitive prices.
Sustainable policy of investments to upgrade the
rigs and related equipment.
ISO 9001, ISO 14001 and OHSAS 18001
certification.

Drilling & Workover Division


Future Plans
To continue and develop the relationship with the
traditional clients, making efforts to continuously
improve our performance;
To earn new clients through our excellent
performance, quality and safe services;
To upgrade our fleet with new rigs, in order to satisfy
the market demands.

You might also like