ICSS Loop Test Presentation Updated
ICSS Loop Test Presentation Updated
By
Eng. Ahmed Adel A. Megeid
OWS
OWS
Open Loop
JB
JB
Transmitter
Transmitter
DCS
DCS
Closed Loop
JB
JB
Transmitter
Transmitter
Control
ControlValve
Valve
Tools Required;
1) Hand held Communicators
2) HP Hand Pump with digital Gauge & Druck
3) Current source (4-20 mA),
4) Multi-meter measurement (AVO) Fluke,
5) Water Pump for level transmitters loop test.
6 ) TRX or DPI-620 device for temperature
transmitters loop test.
7) Radio (Waki-talki) for communication from control
building and field
8) Instrument Air network to ready OR using Air
compressor with air dryer.
9
10
11
HP
HPPUMP
PUMP
JB
JB
OWS
OWS
PT
PT
HP
hose
12
Druck
DruckTRX
TRX
device
device
JB
JB
TT
TT
TRX cable
connectio
n
13
3A)Level transmitter GWR (side to side mounted):1) Water pump shall be used for GWR- LTs (HART or FF)
to perform loop test at values 0%, 25%, 50%, 75%,
100% of calibration range (rising & falling) by using
water.
2) Follow Analog Input test procedure as per item AI test
procedure .
DCS/IPS
DCS/IPS
3) Record the result in Loop test
check List
JB
JB
OWS
OWS
Water
WaterPump
Pump
LT
LT
Hose
14
3B) Level transmitter GWR, Top mounted:1) Hand Held communicator 475 shall be used for GWR
LTs (HART or FF) to simulate loop test at values 0%,
25%, 50%, 75%, 100% of calibration range (rising &
falling).
2) Follow Analog Input test procedure as per item AI test
procedure .
DCS/IPS
DCS/IPS
3) Record the result in Loop test check List.
JB
JB
OWS
OWS
Hand
Handheld
held
communicator
communicator
LT
LT
Device cable
15
OWS
OWS
JB
JB
Hand
Handheld
held
communicator
communicator
Device cable
FT
FT
16
OWS
OWS
JB
JB
CV
CV
Multimeter
I/P
Positioner
18
20
22
ROV Loop
DCS
DCS
IPS
IPS
IPS
IPSEWS
EWS
DCS
DCSOWS
OWS
JB
JB
RZC/O
RXV
ROV
ROV
23
28
DCS
DCS
Remote
Start
Remote
MCC
MCC
Stop
Local/Remot
e
Run Status
Not Available Status
IPS
IPS
ESD Trip
29