Purpose
1.Requirement on the site photo-taking
2.explanation on the engineering quality check table
3.Site check sequence and photo spots
4.outdoor photo spots
5.Indoor photo spots
6.Examples
7. The collection and transfer of the check table and photo
documentation, file condensation
8.Uploading to the server of After Sale Quality Dept
9.How to condense the photos in the PPT and WORD documentation

Purpose

Let the quality inspection staff from ZTE or ZTE partner


company understand the requirement on site engineering
quality check and photo-taking as well as the appraisal
comparison method.

1.Requirement on the site photo-taking

50 photos/site is the minimum required number to reflect the


real status of one complete site. And the exact photo-spots
are illustrated in the following slides.
Notice on the site checksetting the photo size/pixel

The photo size/pixel is 1M ,like 1024*768 or 1280*960.


The date and displayed date setting should be ready beforehand
(YYYYMMDD .
It is not recommended to use the mobile phone camera due to the
limited pixel, but in case the pixel setting is adjusted to the
satisfactory level or under special environment ( like the standard
camera is not allowed to use in the equipment room), it is still can be
applied.

dont

Dont modify the original picture file name.


Dont include/minimize the other equipment or items which are not
related to the check items.

2.explanation on the engineering quality check table


I t must be known to all inspection staff )

please use the latest version of the engineering quality


check table
The check table can be downloaded from the following
path ecc.zte.com.cn--TSM>after sale
documentation>procedure and regulation
documentation>quality management

3.Site check sequence and photo spots

Site photo spots The following information can be reflected from the photos:
complete site lay-out
Site type ( green field, roof top, indoor or shelter, outdoor, urban and less
populated area)
CAF type DG set, tower, shelter and lay-out)
others civil foundation, fence, gate, ground status
Equipment installation (rack arrangement, fixture and cables lay-out, labels ,
DC/AC distributors , cable tray , grounding bar, Air conditioner , fire
extinguisher
Grounding manner( indoor equipment, inner/outer grounding bar, earthing pit,
metallic structure grounding
AC supplying manner aerial suspension , ground buried, duct-laying,
transformer, power distributors )
Site environment
Highlights and problematic points
More details can be perceived through zooming in/out upon the photos such as
the cable joints, label marking.

4.outdoor photo spots


AC access

Feeder
window
sealing and U Feeder
cable
bend
grounding

Cable lay
out and
binding

Feeder cable
grounding and
bar
Grounding
of the AC
support
pole

Ground
ing
point
for the
IGB(int
ernal
groundi
ng bar)

Cable
inlet

Shelter
grounding
point

External
grounding bar
and down lead

Cable
tray
fixture

Grounding for
cable tray and
other metallic
part

Base
Earth ring joint

Container earth ring

Ground
access

Mast earth ring

Tower ground
access and
lightning
down lead

5.Indoor photo spots


AC

Feeder
window

Feedercable
lightningarrest
andaccess

Cablelay
out

AC
A/CPDB
and
lightning
arrest

A/CPDB

power

Racktop

Cabinet
inside

Cableaccess
hole

Feeder
cablelabel

BTS

Rackfixture

Internal
groundingbar
andcable

Internalground
andenvironment

Fire
extinguisher

Ground
accessfor
IGB&EGB

6.Examples -outside panorama

Greenfield+room

Greenfield+shelter

Rooftop+shelter

Rooftop+room

6.Examples -inside panorama

Thesequentialpicturescanbeusedtocoverthe
panorama

123

1234

6.Examples environment and safety

Notice: The following potential safety risks should be


reflected in the check result:

inflammablesneartheDGsetbase

Unstableguyedwire

Uncoveredpowercable,
unprotectedcable
lugs

Nopropercable
plug

ACcableinletcouldbedamaged

6.Examples- civil works and foundation (shelter,


tower, DG set) only for the turnkey project

4 -5 pcs of photos should be taken around the building or shelter including the covered
area which are related to the quality check like the area underneath the shelter
The enclosure wall/fence and gate can also be checked and pictured( turn key project.

gate

Foundation(DGsetandshelter)

Foundationandground(tower)

Ground,enclosurewallandfoundation(tower)
OutdoorBTSfoundationandgroundingbar

towerandgrounding

ACinlet

6.Examples tower 1

6.Examples- tower2
Withoutthefollowingpictures,itmightbeconsideredthe
towerisnotgroundedatall.

Towerfootgrounding

Cabletray
grounding

Cabletraygrounding
Downleadconductor

Shortcircuitcablebetween
thecabletray

Cabletray
grounding
Earthingcable
diameter

Fencegrounding

Groundingbardownleadcable

6.Examples- tower3

Aviationobstructionlight

Lightningrodanddown
leadconductor

Antennainstallationmanner

Waterproofwrap

Feedercablelayout,fixtureandgrounding

6.Examples- tower, cable tray and shelter


Sequentialpictures:Thecitedpicturesareonlypartialexamples.

Towerfoot,bodyandtop
Cabletrayandfeedercablelayout&grounding

Outdoorgroundingbaranddownleadconductor

Cabletrayandshelter

Generalappearanceandfixture

Cablelayoutandgrounding

Outdoorgroundingdetails(groundingbar,
earthingcable,labels,anticorrosive
treatment

6.Examples- inside the shelter 1

Sequentialpictures:Thecitedpicturesareonlypartialexamples.

sheltersurroundingsandcableinlet Entranceandfloor

Cabletrayandcable

Cablearrangement

Equipment
layout

Layoutandfizture

Cablearrangementabovetherackandlabels

Racktop

Racktopdetails

Feedercablelightningarrestandgroundingcabledirection
Frontviewofthefeederwindow
Indoorgroundingbarandlabels

6.Examples- inside the shelter 2

Sequentialpictures:Thecitedpicturesareonlypartialexamples.

ACinlet

ACdistributorlocation

InletandgroundingoftheAC
AClightningarrestorindices
distributor
cablelayoutinsidethedistributor

Cabinet
inside2

Cabinet
inside1

Cabinet
inside3

Cabinet
inside4

Batteryrackandgrounding

Fireextinguisher

Airconditionerlocation,layoutandfloor

Sensors

Indoorgroundingbatoutlead

7. The collection and transfer of the check table and


photo documentation, file condensation

The site photo should be archived as per the site directory . Documentation and
the proof pictures can be archived separately under specific directory. The photo
should be kept with the displayed data without any modification.
The site photo should be archived as per the site directory under the general
project directory which is named after the specific project which include the site
subdirectory and related tables. Transfer can be done after file condensation. In
case the file size is too big to be transferred ( more than 50M), more
subdirectories can be created like project subdirectory 1, 2,3 and transferred
separately. The folder structure is recommended as following:
folder-- --XX engineering quality check results including X sites --subdirectory ---XX engineering project XX site --- site photos

The file can also be transferred as per the site subdirectory marked with exact
project name in case of poor networking conditions.

In case the file can not be uploaded due to very poor networking condition, the
software copy can be taken by the colleagues to After Sale Quality Dept. Located
on the 31st floor of the Shenzhen R & D building or uploaded domestically by the
said colleagues.
It is recommended the photos be condensed before archiving and transferring .
The xat.com Image Optimizer P can be used for this purpose which is
available on the server of After Sale Quality Dept.

8.Uploading to the server of After Sale Quality


Dept.

Server address ftp://10.17.186.11/


Login name: gczljc, password: cjlzcg
Directory : quality check results-2012country

9.How to condense the photos in the PPT


and
WORD
documentation
Click
the right mouse button against anyone of the photos in the
documentation, select the setting the photo format and proceed as
the following all the photos in the documentation can be
condensed.