construction start?
Condition of Roads
Daily operations
Traffic condition
Avoid trasport of material
at peak hours
Time taken for the
transportation of material.
Safety of others road
users
Keep transportation
costs in mind, as well.
Understand that costs
Daily operations
Disturbance
Construction may cause
disturbance to the
surrounding
Minimize the pollution
and maintain good air
condition
Construction should be
done in the night to
prevent voice pollution
that affect the school
To avoid (solution):
Electricity cables
Pipe sewer
Issue
WATER LEVEL
Solution
a. Subsoil drainage
- installed within the ground in
order to remove excessive
water from the soil, so that it
doesnt cause damage to
buildings or to the landscape.
b. Dewatering treatment
Dewatering is the removal of
water.
It involves pumping from wells
or sumps to temporarily lower
groundwater levels, to allow
excavations to be made in dry
and stable conditions below
natural groundwater level.
TYPES OF SUBSOIL
Chalk
Clay
High level of moisture content
of Clay may cause expansion
and shrinkage
Foundation only can be built
at the depth when clay
moisture content remain stable
British Standard 8004
recommends a minimum depth
of 1m for foundations
A traditional strip foundation
is sometimes acceptable but it
is important not to overdig as
Temporary work
Types of Fencing
Timber fence
Metal
fence
Acoustic
Electric fence
SCARFFOLDING
Putlog
Scaffold
Partly supported
by building
Set 1.25m /1.30m
away
Used mostly for
Independent
Scaffold
Accomodation