Design Considerations
Vessel Particulars
Environment
Water Depth
Waves
Wind
Current
Turret Design
Configuration
Size
Location
Loads
Turret Mooring of
Production Vessels
Fluid-Transfer Requirements
Well Heads
Subsea Manifolding
Risers
Turret Manifolding
Swivels
Offloading
Pigging
Storage / Tonnage
Topsides Layout
Vessel Motions
Mooring System
Anchor Legs
Anchors
Risers
Thrusters & DP
Control
Project Schedule
Short, fast-track schedules
Project Design Basis not well defined
Interfaces and Communication
Installation in Deepwater
Installation engineering, equipment, costs
Project Milestones
2002 Mar.
2002 Apr.
2002 Jun.
2002 Aug.
2002 Oct.
2002 Nov.
2002 Dec.
2003 Mar.
2003 Apr.
2003 May
Launching
2003 Jul.
2003 Sep.
Tow Out
2003 Oct.
Offshore Installation
2003 Oct.
Application
FPSO weathervaning SPM
Large field (>100,000 bbld)
50 to 100+ risers
Deep to ultra deep water
Worldwide
Weathervaning advantages
Mooring tensions
Tandem offloading
Radial
Bearing
Main
Deck
I-Tubes
Vertical Bearing
Riser Hang-Of
Support Columns
Chain
Table
Anchor Legs
Chain Supports
No shadowing to allow
inner row installation and
replacement
Conclusions
Schedule
Fast-track: 18 22 months
Complex systems require more commissioning time