EQUIPMENT LIFE AND

REPLACEMENT
PROCEDURES
Chapter 3 Introduction

Introduction

Equipment Life

Physical Life

Equipment Life Factors


Profit

Life
Economic Life

Depreciation Costs and


Replacement

Investment and Inflation

Maintenance and Repair costs

Downtime

Obsolescence

10

Summary of Costs

11

Losses Resulting from Improper


Equipment Replacement

12

Replacement Analysis
Theoretical

Methods
Intuitive Methods
Minimum Cost Methods
Maximum Profit Method
Payback Period Method
Mathematical Modeling Method
Practical Methods
Public Agency Methods
Sensitivity Analysis
13

Replacement Equipment
Selection
Replacement Decision Making
Decision Making Foundations
Examination of Alternatives
Decision

to Invest

14

General Factors
Machine Productivity
Product Features and
Dealer support

Attachments

Price

15

Thinking About
Work and
Equipment

16

Aerial View

17

Work Being Done


Install

10 wide, 4 sidewalk along


road, consisting of unreinforced
concrete
Install ADA ramps as necessary
Adjust firehouse driveway as needed.
Driveway to consist of 8
unreinforced concrete

18

Street Views

19

Street Views

20

Street Views

21

Street Views

22

Street Views

23

Street Views

24

What Work is Needed?


#

WORK

25

What Tools and Equipment are


Needed?
#

WORK

TOOLS/ EQUIPMENT

26