INDUSTRIAL TRAINING

Satyug Darshan Institute of Engineering &


technology

INTRODUCTION
Dheeraj Kumar Sharma
ME-13/016
B.TECH MECHANICAL
4th YEAR

Dheeraj

ABOUT NTPC
Indias largest power generating company
National thermal power corporation Limited, is the largest
power generating company of India . A public sector company
wholly owned by the government of India, it was incorporated
in the year 1975 to accelerate the power development of the
country.
Within a span of 40 years NTPC has emerged as truly
National power company with power generating facilities in
all major regions of the country. NTPC is the 6th largest
power generating company & the second most efficient on
terms of capacity utilization amongst the thermal activities in
the world with total installed capacity of 47178 MW.

NTPC set a target to generate 128,000MW by the year 2032.


NTPC Operating 25 coal based , 7 gas based & 9 renewable
energy power stations across the country.
In addition under JVs/subsidiaries 8 stations are coal based &
one station uses natural gas as fuel with 17.76% of the total
nation capacity. NTPC contributed 27.19% of total power
generation.
A constant high level performing operation NTPC Limited
provide the bench mark for the Indian power sector
NO. OF PLANTS

CAPACITY (MW)

NTPC Owned
Coal

25

33,015

Gas/Liquid Fuel

4,044

Renewable energy projects

95

41

37,154

5,974

50

43,128

Total
Owned By JVs
Coal & Gas
Total

INTRODUCTION OF NTPC FARIDABAD


1 Location
Located near village Mujedi & Neemka in Faridabad district of Haryana State.
2 Major Milestones
Ever since then honorable Prime Minister Sh. I.K. Gujral laid down the foundation
stone on 03rd august 1997.
First two units of 138MW were commissioned on 21st Jan 2000 and 22nd March, 2000
and one unit of 156MW was commissioned on 16th July 2001 by Haryana Vidyut Prasaran
Nigam.
Faridabad project was taken over by NTPC from HVPN on 13th Feb, 2002.
It is the only power plant in this country to supply its entire power to a state i.e. Haryana
rather than to the national grid.

FARIDABAD GAS POWER STATION


Capacity
Location
Land
Fuel/source

: 432MW
: Faridabad, Haryana
: 321.4 Acres
: Natural Gas From HBJ

Beneficiary

pipeline
: Naphtha
: Rampur distributory of
Gurgaon Canal
(27 cusec Linkage)
: 100% power to Haryana

state
Associated transmitted
Systems(ATS)

Optional fuel
Water source

Funding

220KV lines to

Samay pur & Palla


(Power grid owned )
: Loan from japan bank of
International Corporation
(formerly OECF)

Installed Capacity
Stage I (GT) = 2 X 138 MW
Stage II (ST) = 1 X 156 MW

Production source
1 Inputs Water Source:
Rampur Distributaries of Gurgaon Canal

2 Fuel:
Natural Gas (Main Fuel) (To be piped from HVJ pipeline by GAIL)
Naphtha (Alternate Fuel)
High Speed Diesel

3 Anti-Salient Features
Cost of Generation: Rs. 2.05 / Kwh
Mode of Operation: Base Load
Rated Output: 135 MVA for GTG & 191.6 MVA for STG
Rated Terminal Vol.: 10.5 KV for GTG & 15.75 KV FOR STG
Rated Speed: 3000 rpm
Type of Cooling: Air Cooled
Black start facility:3.5 MW Diesel Generator Set: 2000 rpm
1kw power = 1975kcal of fuel

WORKING OF THE POWER PLANT

Process of Gas
Turbine

1. Air Intake System -:

2. Air compressor-:

4. Combustion chamber

5.Gas turbine

6. Generator

7. Step up transformer

Steam turbine -:The plant is provided with one steam turbine


generating unit. The turbine is a 3000 rpm
condensing set without any extraction for feed
heating.
It is a 160 MW, 50 Hz two cylinder condensing
type turbines.
The first cylinder (H.P) is a single flow type 25
reactions stages and the second cylinder (L.P)
is a double flow with 7 reaction stages. It is
provided with two main and two LP stop and
control valves.

Thus two vacuum pumps are used to


Condenser-: maintain
the vacuum pressure of 0.9
Kg/cm2.

Steam turbine generator -:

Cooling towers-:

FUEL-:

1. Natural gas

Natural gas is an ideal fuel in gas turbine. It contains primarily Methane (CH 4) other
gases are ethane (C2H6), Nitrogen (N2), Carbon dioxide (CO2) and Sulphur(S). It has
following advantages:
clean burning.
Availability at lower cost.
particularly free from solid residue.
High calorific value of Methane.
Low Sulphur content.

SPECIFICATION OF GAS TURBINE


MAKE
MODEL
CAPACITY
COMPRESSOR
TURBINE
BURNER
COMBUSTER
AIR INTAKE FILTER
BY PASS STACK
AMBIENT TEMP
AMBIENT PRESSURE
RELATIVE HUMIDITY

SEIMENS, GERMANY
V-94.2
137.76 MW
16 stages
4 stages
Hybrid dual fuel
Sielo type
Pulse cleaning ( 576 nos)
Vertical 70mtr. Height
27 degree C
113 M bar
60%

SPECIFICATION OF STEAM TURBINE


MAKE
INDIA
CAPACITY
MAIN STEAM PRESSURE
MAX. TERMINAL OUTPUT
CONDENSOR VACCUME

BHEL, haridwar, India


2 cylinder condensing turbine
156.07 MW
160 MW
76.4 & 4-83 bar
92 (-ve), 3000 rpm

K
N
A
H
T
U
O
Y
DHEERAJ KUMAR

SHARMA