Damar Gas Development

Jacket Lifting Study using QP 2000

PROPRIETARY

General Description Damar-A Platform


The Damar-A Facilities are described below:
Designation
Description
Field Location
Platform Coordinate

Damar A Platform
4 legged jacket with topside
Damar A Platform
E 301 224.97 (m) , N 738 124.58 (m)

Platform Orientation
Water Depth
Lift Weight (MT)

Jacket
Topside
Bridge
Helideck
Boat Landing
Riser Guard
Boat Fender
No of Leg
No of Skirt Pile
Installation Method
Fabrication Yard
Installation Method
Fabrication Yard
No of Piles
Diameter
Wall Thickness
No of Sections

45 degree
54 meter (mean sea level)
1650 (NTE)
1850 (NTE)
1 no. x 62.77 MT
1 no. x 58.5 MT
1 no., weight To Be Confirmed
4
Not applicable
Lifting
MMHE
Lifting
MMHE
18
60"
35m to 60mm (variable)
Leg A1/B1: 5 pcs (1 lead section and 4 addons) & Leg A2/B2: 4 pcs (1 lead section and 3
add-ons)

Penetration Depth (m)

Leg A1/B1: 126m & Leg A2/B2: 112m

Min / Equivalent Hammer Requirement

MHU270T & MHU800S

Pile monitoring
Grouting
No of Conductors
Diameter
Wall Thickness
No of Section
Penetration Depth

To be determined
20
26"
19mm
5
75m
Engineering, Load Out Interface,
Transportation and Installation of jacket,
topside, piles, conductors and other
appurtenances.

Jacket

Topside
Piles

Conductors

General Scope of Work

PROPRIETARY

Damar-A Lifting Study using QP 2000


TLO has proposed QP 2000 to lifts the Damar-A jacket and performed their
preliminary lifting studies.
The below parameters have been considered in their lifting studies:
o Damar-A Jacket NTE weight = 1650 MT (including weight
contingencies, rigging weights, etc.)
o DAF
= 15% (1.15)
o Max. Dynamic Hook Load = 1650 MT x 1.15
= 1898 MT
o QP2000 Main Lift Capacity
@ 32m radius (w/tieback) = 2000 MT
o Lifting Capacity
= 95%

PROPRIETARY

QP 2000 Lift Chart for Damar-A Jacket Lift Off

PROPRIETARY

FINDINGS & SUMMARY


At 95% lifting capacity, there is not much room for error.
At the 32-meter radius portrayed, the curve starts diminishing after this point,
so capacity will diminish if something is inaccurate.
Even though DAF can be changed, it will only limit weather criteria and
installation window which could cause significant stand-by time.
Based on TLOs performance in 2012, likely to incur operational delays,
which will put Damar installation at risk and will push Damar structural
installation nearing monsoon, which could cause significant stand-by time.
It is possible to lift Damar-A jacket using QP2000 but it is too restrictive as a
base case vessel for this lift.
A proper planning and execution to be in placed between Damar-A jacket
installation and Damar-A topside installation (which will be lifted by other
vessel) to ensure both operations are align and to avoid a significant stand-by
time.