13 Direct Fixed Cost Estimate Methods
13 Direct Fixed Cost Estimate Methods
ESTIMATES
ESTIMATE METHODS FOR
AUXILIARIES AND SPECIFIC
COMPONENTS
AUXILIARY FACTILITIES
AS LISTED IN THE TEXT:
GENERAL CATEGORIES
PLANT UTILITY SYSTEMS
STEAM
WATER
http://www.syska.com/
AIR
Energy/images/StPOWER
Joes-Boiler-plnt.jpg
NATURAL GAS
MINOR UTILITIES
FIRE SYSTEMS
INERT GASES
WASTE DISPOSAL
SEWERS
HAZARDOUS MATERIAL
TREATMENT SYSTEMS
DISTRIBUTION &
TRANSPORTATION SYSTEMS
ROADS
RAILS
DOCKS
http://www.smvrhm.org/2misc/un
k-boxcar-loading.jpg
ESTIMATE FACTORS
DEPEND ON TYPE OF FACILITY
ESTIMATES DEPEND ON
FOLLOWING FACTORS
TYPE OF SYSTEM
http://www.welcoser
WELDED
vices.com/pic3b.jpg
SCREWED
SWAGED FLANGES
WELDED FLANGES
MATERIALS OF CONSTRUCTION
SEE TABLE 12-2 FOR ALTERNATE
TYPES
MAXIMUM VELOCITIES
OTHER CONSTRAINTS
CODES
ASME B31.3 PROCESS PLANT PIPING
ASME B31.1 STEAM PIPING
SYSTEM CURVES
www.fluidedesign.com/downlo
ad-free/chapter4-extract.pdf
SUBSURFACE PIPING
GENERALY LOCATED IN
TRENCHES
RADIOGRAPHY REQUIREMENTS
http://www.valvediagno
stics.com/media/pictur
s/gate.gif
http://www.offshore247.com/n
ews/article.asp?Id=3226
http://www.valvediagnostics.c
om/media/pictures/check.gif
SPECIFIC EXAMPLE
Cl2 PLANTS
PRODUCTION ECONOMICS FOR DIAPHRAGM Cl2
Cl2 Capacity
Cl2 Production
ST/Y
ST/Y
275000
275000
450000
450000
1100000
1100000
208
330
662
Off-Sites
Total Fixed Capital
100
308
158
487
317
978
ST/Y
ST/Y
250000
250000
450000
450000
1100000
1100000
DATA
FROM T. PAVONE
Off-Sites
Total Fixed Capital
221
350
702
93
314
148
497
297
999