Before commencing their job


they conduct TBT discussing JSA
and brief them their Task.

Status: Positive

Area: Dewatering area (S-5)

Observation:
Poor house keeping ,
Substandard Electrical cable
joints are used only with taping.
Action Taken:
Ask them for doing house
keeping, keeping should be
maintain all the time & avoiding
use of substandard electrical
cable joints

Status: Open

Area: Dewatering area (S-5)

Observation:
it was observed that material
placed in existing bushed and
on ground Sling Belts etc.
Action Taken:
It should store properly & not on
ground directly for avoiding
snake bite cases, also bush
cutting required in all
dewatering working areas

Status: Closed

Area: Near Site office

Observation:
it was observed that contractors
team was doing material
shifting job with equipment and
manually without sufficient
Lighting arrangement
Action Taken:
Stop them and ask them for
doing their job in day Light.

Status: Closed

Area: Dewatering area

Observation:
it was observed that they used
compressed gas cylinders in
day time without trolley & Left
them in same condition in night.
Action Taken:
Ask them for arranging proper
gas cylinders trolley with chain
for safe use.

Status: Open

Area: Near Main check Post

Observation:
it was observed that contractor
personnel's were doing Road
Roler repair job in night time.
While they dont have proper
Lighting
Action Taken:
Stop them & counseling done

Status: Closed

Area: Mining Pit Hongda area

Observation:
it was observed that a Chinese
Supervisor and a worker was
standing on returning wall
Action Taken:
Stop them & counseling done

Status: Closed