Presentation of Energy Conservation in Govt. Buildings of Maharashtra State

You might also like

Download as ppt, pdf, or txt
Download as ppt, pdf, or txt
You are on page 1of 23

Presentation of

Energy Conservation
in
Govt. Buildings
of
Maharashtra State.

Energy Saving

Energy Saved is Energy Generated.

Saving of Energy is the need of the day.

Government is one of the major consumer of


Energy.

The Govt. has to lead others by taking


effective steps to save the energy

Energy Saving

278 million units of energy per annum are


consumed by Maharashtra State Government
Office Buildings

This is equal to 105 MW Generation during


working hours under the assumption of 10
hours /day, 22 days /month, 12 months /year.

One unit saved is TWO units generated.

Annually Rs.111 crores are spent by the


Government on energy bill .

Energy Saving

Energy Efficient Lamps and Equipments can


save energy bill up to 30 %.

100/60/40 watts bulbs can be replaced by


CFL lamps of 22/11/9 watts having power
factor more than 0.9.

40/36W Fluo. fittings can be replaced by


28W E+/T5 fluo. fittings or their chokes
by electronic chokes.

Four pillars of successful


Energy Management

Four pillars of successful


Energy Management : Key

Successful energy management programme needs the total


Elements
support of senior management.

The other important requirements are

A well-charted strategy plan.

An effective monitoring system.

Adequate technical ability for analyzing and implementing energy


saving options.

In any organization, which does not already possess an energy


efficient ethics, good communication downwards from senior
officials will be vital first step.

Active participation & planning for the energy management

Ways of Energy
Awareness
Conservation

Replacement of conventional fittings with E+ fluo. fittings

Replacement of conventional pumps with submersible


pumps/energy efficient pumps

Replacement of old water coolers with energy efficient


water coolers

Replacement of GLS lamps with CFL lamps

Incorporating timers for passage lights

Incorporating digi guards for ACs

Incorporating DPSD for compound & street lights

Ways of Energy
Replacement of electric water heaters with solar water
Conservation
heaters

Replacement of water coolers with heat pumps

Replacement of resistance type regulators with electronic


regulators

Replacement of conventional chokes with electronic chokes

Incorporating VFDs for hydro pneumatic systems, pumps &


central AC plants

Incorporating 3VF drives for lifts

Smart Card (SIM) based Power Controller

Energy Saving at Vidhan


Bhavan

Sr.
No
.

Year

Use of fitting /
Equipment

Nos.

Capital
cost
(Rs.
Lacs)

Date
of
commi
sioning

Saving
in bill
(Rs.
Lacs)

Simple
paybac
k
period
(yrs)

200102

VFD for water pump

6
Nos.

8.17

12/01

2.97

2.8

200102

Power factor
correction capacitor
panel

350
KVAR

13.8

12/01

5.49

2.5

200102

E+ 28 W tube fitting
in place of 40 W
fitting

1493

12.02

2/02

5.37

2.2

200102

Using reflector for


4 X 2 X 20 W

1493

3.22

2/02

1.79

1.8

An
expenditure of Rs. 40.43 lacs has accrued
saving
of Rs.2/02
17.41 lacs
per annum.
5 2001- New reflector with
1493
3.22
1.79
1.8
02

one tube in place of

Energy Saving at Mantralaya

Sr.
No.

Year

Equipment
Used

Quantit
y
(Nos.)

Cost of
installatio
n
Rs.Lakhs

200102

Capacitor
panel

180
KVAR

3.66

120
KVAR

3.47

Units
save
d

Saving
in
energy
bill
Rs(Lakh
s)

Simple
pay back
YearsMonths

2.67
10 months

200203

4.28

200203

E+fluo.
Tubes

1238

10.78

7293
3

3.65

2 -11

200304

E+fluo.
Tubes

2705

21.77

1593
57

7.97

2-8

200304

Capacitor
panel

50
KVAR

1.58

6 expenditure
2004E+fluo.
3572
2032
10.16
An
of
Rs. 79.05 lacs
accrued 27.77
saving of Rs.
36.45 lacs
in four
05
Tubes
46
years ( 5% increase in load).

2 -8

Sr. No .

Energy Efficient Equipments used


in New Govt. Building works
CFLStreet
Electro
during
2001-2005
E+
Electronic
Solar

Solar
Solar
CFL Lamp (Nos.)
DPSD (Nos.) Light
nic
Fitting
Regulator
Street water
(Nos.)
choke
(Nos.)
(Nos.)
Light heate
(Nos.)
9 Watt 11 Watt 2x11W 1x18 W 2x26W
125W 250W 11W 18W
r

Name of
Circle

Mumbai

10436

269

1003

350

48

1128

1353

123

535

20

Pune

3127

1410

641

150

233

Aurangabad

1397

598

255

43

62

Nagpur

2310

331

526

16

262

52

Total

17270

269

3342

876

960

1390

1598

10

63

526 123

169

46

52

30

264

470

734

85

836 133

By this Demand Side, 822 KW is saved.

Saving by Awareness in J.J. Hospital Units 0.8 MU & Amount Rs. 38.53
Lakhs in three years

Saving by use of VFD in New Administrative Building -- Unit 30,000/year &


Amount Rs.1.5 Lakhs/ year

Energy Saving Proposals


submitted to Govt. for 35 bldgs.
attracting EC Act 2001

Sr. Category
No.

Present

Replaceme
nt
(Quantity)

Capital
Cost
(Rs.
lacs)

Energy
bill
saving /
year
(Rs.
lacs)

Paybac
k
period
(yrs)

469.06

399.16

1.2

1.

Fluo. fitting

Conventional
40W
(76023 Nos.)

E+(28W)
(53303
Nos.)

2.

Passage
Lights:

Conventional
40W fluo.
fitting (1896
Nos.)

CFL 11 W
(1896 Nos.)

2.84

7.98

0.4

3.

Water
Pumps

Conventional
(61 Nos.)

Submersibl
e
(61 Nos.)

18.3

13.97

1.3

4.

Passage
Lights:

Without Timer With Timer


(144 Nos.)
(144 Nos.)

0.3

0.76

0.5

Energy Saving Proposals


submitted to Govt. for 35 bldgs.
attracting EC Act 2001

Sr. Category
No
.

Present

Replaceme
nt

Capital
Cost
(Rs.
lacs)

Energy
bill
saving /
year
(Rs.
lacs)

Paybac
k
period
(yrs)

6.

AC units

Without
Digiguard
(539 Nos.)

With
Digiguard
(539 Nos.)

19.94

12.76

1.6

7.

Compound &
Flood Lights

Without
DPSD
(614 Nos.)

With DPSD
(614 Nos.)

17.19

9.88

1.74

8.

Water Heating
System

Electric
(1145 Nos.)

Solar
(167 Nos.)

480

75.23

6.4

9.

Water Cooling

Water
Coolers
(425 Nos.)

Heat
Pumps
(9 Nos.)

90

32.39

2.7

Energy Saving Proposals


submitted to Govt. for 35 bldgs.
attracting EC Act 2001

Sr. Category
No.

Present

Replaceme
nt

Capital
Cost
(Rs.
lacs)

Energy
bill
saving /
year
(Rs.
lacs)

Paybac
k
period
(yrs)

11.

Water Pumps

Without VFD
(41 Nos.)

With VFD
(41 Nos.)

202.18

41.26

12.

Lifts

Without 3VF
drive
(19Nos.)

With 3VF
drive
(19Nos.)

48.94

13.84

3.5

13.

Ceiling Fan
Regulators

Resistive
(6716 Nos.)

Electronic
(6716 Nos.)

12.08

12

Sr.
No.

Energy Saving Proposals


submitted to Govt. for 35 bldgs.
attracting EC Act 2001
Present

Replace by

Capital Cost for


replacement (Rs.
Lacs)

Saving in
energy Bill Pay back
every year Period
(Rs. Lacs)

14

Heat water Pump for


Water coolers (328
Chilled water/ A.C. (151
Nos.)
Nos.)

261.76

51.6

15

Water coolers & L. Hot & chilled water heat


P. G. at New
pump system
(
Council Hall
6 Nos.)

20.4

7.32

2.8

16

Centralised Air
condition units
(6 Nos.)

Split AC Units
( 73 Nos)

36.54

37.49

17

60/ 80W ceiling


fans ( 1728 Nos.)

Energy Efficient ceiling


Fans ( 1728 Nos.)

16.03

13.32

1.2

1723.12

763.19

2.26

Total ::

An expenditure of Rs.1723.12 lacs can save 17.09


Millions Energy units per annum & accrues saving of Rs.

ENERGY SAVING PROPOSAL OF OTHER GOVT. BUILDINGS


E+ fittings
Sr.
no.

Department

Home (Police)

Home (Jail)

Qty
(Nos)

Capital
Cost

CFL Fittings
Qty Capital
(Nos)
Cost

Solar Water
Heaters
Qty
(Ltrs)

(Rs. in Crores)
Grand Total

Capital Capital
Cost
Cost

Energy Saving
per year
(million units)

35057

3.09

7386

0.11

0.00

3.20

3.01

7415

0.65

1653

0.02

0.00

0.67

0.64

Law & Judiciary

32288

2.84

5521

0.08

0.00

2.92

2.7

Education

46199

4.07

8907

0.13

0.00

4.20

3.92

Social Welfare

9342

0.82

2807

0.04

0.00

0.86

0.85

34907

3.07

7496

0.11

0.00

3.18

34938

3.07

12772

0.19

287750

5.80

3.26

6.52

Revenue
Public Works (NonResi)
Pblic Works (Resi)

6084

0.54

1288

0.02

0.00

0.56

0.52

Other Administrative.

16759

1.47

2146

0.03

0.00

1.50

1.36

92

0.01

16

0.00

0.00

0.01

0.01

855

0.08

134

0.00

0.00

0.08

0.07

63638

5.60

11385

0.17

0.00

5.77

5.35

13 Finance

3974

0.35

826

0.01

0.00

0.36

0.34

14 Animal Husbandry

3245

0.29

638

0.01

0.00

0.30

0.28

15 Fisheries

861

0.08

334

0.01

0.00

0.09

0.08

16 Tech. Education

337

0.03

53

0.00

0.00

0.03

0.03

17 Dairy Deptt.

425

0.04

209

0.00

0.00

0.04

0.04

296416

26.10

63571

0.93

287750

5.80

27.03

28.72

10 Labour Dept.
11 Vidhan Bhavan
12 Public Health

An expenditure of Rs. 27.03 crores accrues saving of Rs. 12.92 crores per annum & 28.72 million units .

ENERGY SAVING PROPOSAL OF OTHER GOVT. BUILDINGS


E+ fittings
Sr.
no.

Department

Home (Police)

Home (Jail)

Qty
(Nos)

Capital
Cost

CFL Fittings

Solar Street
Light Fittings

Qty Capital Qty Capital


(Nos)
Cost
(Nos)
Cost

Solar Water
Heaters
Qty
(Ltrs)

(Rs. in Crores)
Grand Total

Capital Capital
Cost
Cost

Energy Saving
per year
(million units)

35057

3.09

7386

0.11

4424

10.35

0.00

13.55

4.15

7415

0.65

1653

0.02

776

1.82

0.00

2.49

0.84

Law & Judiciary

32288

2.84

5521

0.08

1952

4.57

0.00

7.49

3.2

Education

46199

4.07

8907

0.13

2992

7.00

0.00

11.20

4.69

Social Welfare

9342

0.82

2807

0.04

1590

3.72

0.00

4.58

1.26

Revenue
Public Works (NonResi)

34907

3.07

7496

0.11

2937

6.87

0.00

10.05

3.76

34938

3.07

12772

0.19

3942

9.22 287750

5.80

18.28

7.54

Public Works (Non-Resi) 6084

0.54

1288

0.02

1118

2.62

0.00

3.18

0.81

Other Administrative.

16759

1.47

2146

0.03

477

1.12

0.00

2.62

1.48

92

0.01

16

0.00

0.00

0.00

0.01

0.01

855

0.08

134

0.00

72

0.17

0.00

0.25

0.09

63638

5.60

11385

0.17

3822

8.94

0.00

14.71

6.33

13 Finance

3974

0.35

826

0.01

470

1.10

0.00

1.46

0.46

14 Animal Husbundary

3245

0.29

638

0.01

513

1.20

0.00

1.50

0.41

15 Fisheries

861

0.08

334

0.01

195

0.46

0.00

0.55

0.13

16 Tech. Education

337

0.03

53

0.00

35

0.08

0.00

0.11

0.04

17 Dairy Deptt.

425

0.04

209

0.00

203

0.48

0.00

0.52

0.1

296416

26.10

63571

59.72 287750

5.80

92.55

35.3

10 Labour Dept.
11 Vidhan Bhavan
12 Public Health

0.93 25518

An expenditure of Rs. 92.55 crores accrues saving of Rs. 15.89 crores per annum & 35.3 million units .

Energy Saving in Important


Govt.Bldgs : 2004-2005 (Rs. In

Name
of the
Lacs)
Building

Consumption in
units

Saving

Energy Bill

2003-04

2004-05

(units)

4037085

3959960

77125

1.91%

260.58

1325600

1225000

100600

7.59%

681996

675855

6141

Manora

2346520

2294500

J J Hospital

1570770

1561000

9961971

9716315 245656

Mantralaya
Navin Vidhan
Bhavan
Mumbai High
Court

Total

2003-04 2004-05

Energy Saving
Rs.

229.94

30.64

11.76%

90.27

74.04

16.23

17.98%

0.90%

46.87

41.27

5.6

11.95%

52020

2.22%

159.59

157.17

2.42

1.52%

9770

0.62%

60.62

52.47

8.15

13.44%

2.47%

617.93

554.89

63.04

10.20%

Energy Saving of Electrical


Wing Offices of PWD
Annual Energy Saving of Electrical Wing
Sr.
Month & Year Units
No.
3

Month &
Year

units
Consumed

Differnce
Units
8

Percentage
9

Mar-04

22125

Mar-05

17063

5062

22.88

Apr-04

19691

Apr-05

16726

2965

15.06

May-04

24379

May-05

20770

3609

14.80

Jun-04

21280

Jun-05

16221

5059

23.77

BOT Pilot Projects of PWD


Bldgs

MLA Hostel, Nagpur

Ravi Bhavan, Nagpur

Golf Club, Nashik (Circuit House)

Inspection Bunglow, Pune

Subhedari Rest House, Aurangabad

BOT Pilot Projects of PWD


Bldgs : Abstract (Rs. In Lacs)
Sr.
No.

Name of the Building

No. of
Suits

LPD
Capacity
(Ltrs)

E+
CFL
Fittings Fittings
(Nos.)
(Nos.)

Capital
Cost

Expected
Net
Saving

Payback
Period

IRR

M.L.A. Hostel, Nagpur

386

39000

1158

1644

70.71

17.23

7 YRS

15.46%

Ravi Bhavan, Nagpur

128

6600

340

130

14.4

3.47

7 YRS

15.08%

Golf Club, Nashik

51

4700

58

139

9.66

2.37

7 YRS

15.69%

Subhedari Rest House,


Aurangabad

45

4500

177

256

12.43

2.62

8 YRS

14.01%

Inspection Bunglow, Pune

56

8400

200

15.31

4.56

5 YRS

14.93%

666

58700

1933

2169

122.51

30.25

Total

Similar Proposals for BOT


can be implemented for other
departments
after
their
assurance to share the saving
with the BOT operator.

One Unit of Energy saved is


equivalent to Two Units of Energy
Generated.

Thank You
Save Energy To Build Nation.

You might also like