Professional Documents
Culture Documents
Tswako IE Services
Tswako IE Services
Open Pit
Underground
DESIGN
Equipment Matching
Truck/Shovel allocations
Long term mine planning Best
strategy to double the output
Waste deposition strategy
Finding the most economical
positioning of waste for
rehabilitation
Dispatch systems
Optimizedispatch rules
Haul Road Design Test of
proposed travelling routes
Crusher Throughput analysis
Test changes in crusher
availabilities, reduce queuing
times at tip, test impact of
fragmentation on crusher
throughput
Six Sigma
Implementation
Implementation of simulation
results by accredited black belt
consultants
Mine Design/development
Determine number and size of
shafts, equipment selection and
mining method to maximize NPV
Mine Production- Optimizing the
number of LHDs, drill bolters, drill
rigs to achieve the mine plan and
reduce missed blasts
Shaft Scheduling : Testing of
men and materials vertical
transport to improve mine
production
Surface Logistics
IMPLEMENT
Financial Modelling
Business
Simulation Game
Theory