Ramula Primary

School
The school
Renovation
needs to be renovated,
Report

putting in consideration the following


areas:
Re-Screeding of floor
Reinforcement on Veranda
Putting Black boards
Internal and external s plastering
Painting
Replacing of windows
Fixing of Doors
Reinforcing of veranda by pillars
Facial boards
Repainting and replacing of Spoiled
iron sheets
New Latrines for teachers, boys and
girls
Putting up of water tank (5,000 ltr) to
reserve some rain water from the roof.
At least several Desks per classroom
Some chairs and tables for teachers

SCHOOL MEASUREMENTS:
Length: 2,400 cm
Width: 600 cm
Height: 310 cm
Window size: 1000 mm x
1000 mm
Door size: 1000 mm x
2,200 mm

Damaged wall inside

Current Photos of the School

Veranda and apron that needs to be renovated

us
ed
be
i ng
oa
rd
Sm
In all s
a c ize
l as
o
sro f bl
om ack
b

Broken/scrapped floor s of classrooms ,staff room & verand

Open Doors that needs to be fixed

Internal images of classrooms and


staff room with
damaged walls, no black boards ,
no Notice board, No desks,
No chairs with broken/
damaged floors.

Completely damaged/broken
latrines with no roof and doors

Windows that needs to be replaced

Unfinished apron and Veranda