Sistem Informasi Manajemen
Sistem Informasi Manajemen
MANAJEMEN
Introduction
Sub Systems ?
Elements of a System
Input
Processing
Output
Input
Output
Levels of Management
Upper or Top or Strategic Management
Strategic
Tactical
Operational
Decisions made
Time frame considered in the decisions
Types of report information needed to
make decisions
Facts
Emerged from the filed of artificial intelligence
(Creating computer systems that simulate human
reasoning and sensation)
Maintenance
Feasibility Study
System Analysis
Implementation
System Design
Testing
Software Development
SDLC cont..
Interviews
Questionnaires
Site Observations
Phase 6 : Testing
The system should be fully tested for errors (bugs) before
implementation.
Two types of tests are conducted
Integration testing, After completion of unit tests of all
modules, the modules are to be combined and be tested.
At this stage the test is done on actual data
Acceptance testing, Acceptance criteria is the agreement
made between the user and the system developer. The
acceptance criteria contains a list of important
requirements that the system has to satisfy. The tests
conducted to check the acceptance criteria are called
acceptance testing.
Phase 7 : Implementation
The phase contains two activities
The user training, The users are to be given training for operating a
new information system. Main topics of such type of training are:
o
Direct Implementation
o The entire system is replaced with the new system in
one go.
Parallel Implementation
o Both systems i.e. the new and the old systems are
executed in parallel for a certain defined period of time.
This strategy is helpful because of the following
Results of the old system can be compared with
the results of the new system
Failure of the new system at the early stage, does
not affect working of the organization
Phased implementation
o The new system is introduced in a phased manner
Pilot implementation
o New system installed in parts and executed successfully
for a considerable time period. When the results are
found satisfactory then the other parts are implemented
Phase 8 : Maintenance