The document provides instructions for internal plastering work. It states that bull marking should be done one day before checking measurements. Mesh packing should be done below beams for electrical pipes over two days before fixing the mesh and making the surface rough. All loose particles and gaps must be properly packed. Electrical boxes should be aligned and protected before plastering begins. The plaster mix should be in proper proportion of 1 part cement to 5 parts sand. Windows and ventilators should be checked for being level. Lofts and chejjas should be at proper tube levels and measurements. The finished wall should be checked for evenness and texture. A 9" skirting area should be left at the bottom. Modular boxes and tile areas should
The document provides instructions for internal plastering work. It states that bull marking should be done one day before checking measurements. Mesh packing should be done below beams for electrical pipes over two days before fixing the mesh and making the surface rough. All loose particles and gaps must be properly packed. Electrical boxes should be aligned and protected before plastering begins. The plaster mix should be in proper proportion of 1 part cement to 5 parts sand. Windows and ventilators should be checked for being level. Lofts and chejjas should be at proper tube levels and measurements. The finished wall should be checked for evenness and texture. A 9" skirting area should be left at the bottom. Modular boxes and tile areas should
The document provides instructions for internal plastering work. It states that bull marking should be done one day before checking measurements. Mesh packing should be done below beams for electrical pipes over two days before fixing the mesh and making the surface rough. All loose particles and gaps must be properly packed. Electrical boxes should be aligned and protected before plastering begins. The plaster mix should be in proper proportion of 1 part cement to 5 parts sand. Windows and ventilators should be checked for being level. Lofts and chejjas should be at proper tube levels and measurements. The finished wall should be checked for evenness and texture. A 9" skirting area should be left at the bottom. Modular boxes and tile areas should