INTERNAL PLASTERING WORK

BULL MARKING SHOULD BE DONE ONE DAY


BEFORE. (ROOM DIAGONAL, PLUMB AND
MEASUREMENT SHOULD BE CHECKED AT AFTER
DOING THE BULL MARK).

MESH PACKING BELOW THE BEAMS, FOR ELECTRICAL


PIPES SHOULD BE DONE.(ONE DAY FOR PACKING AND
NEXT DAY FOR MESH FIXING AND MAKING SURFACE
ROUGH)

ALL LOOSE PARTICLES SHOULD BE REMOVED OF ALL


HOLES, GAPS, SHOULD BE PROPERLY PACKED.

ELECTRICAL MODULAR BOXES SHOULD BE ALIGNED


PROPERLY AND SHOULD BE KEPT SAND OR
THERMOCOL BEFORE PLASTERING.

SAND, CEMENT & WATER SHOULD BE MIXED


PROPERLY, MIX PROPORTION 1:5 FOR INTERNAL
WALLS.

ALL WINDOWS, VENTILATORS DIAGONAL SHOULD BE


CHECKED.

CHEJJA, LOFTS SHOULD BE IN TUBE LEVEL AND AS


PER MEASUREMENT.

AFTER PLASTERING WALL ADULATIONS AND SURFACE


EVENNESS SHOULD BE CHECKED.

LEAVE SKIRTING AREA AT THE BOTTOM FOR MIN - 9".

MODULAR BOX SHOULD BE CLEANED PROPERLY.

WHEREVER TILES NEEDS TO BE PLACED THAT AREA


SHOULD BE MADE ROUGH.

THE END