AUTOMATION PROJECT

OMPUTER STITCHING PROJECT

OAL:
crease productivity and Quality
OJECT ORGANIZATION CHART

PROJECT LEADER
Tedi T

Production
IE Mechanic
Atik
Taupik Janip
Production
Analyzer Pallet designer control

Yaya Sulastri
Data tracking Operator
TOMATION PROJECT
Model Name
EKIDEN ONE PLUS
:
Passion Brand
KALENJI
:
Category/Gender
RUNNING
:
Size Range (Sample
36 - 47
Size) :
Factory
PT. DWI PRIMA SENTOSA
: On Hand Order Ekiden One Plus
Supplier Code 2016
P3 927 - 2017
:
120,000
Supplier Country Total : 399,353 Prs
100,000 INDONESIA
: 80,000
60,000
40,000
Pairs
20,000
-
TOMATION PROJECT
ter stitching Opportunity on Ekiden One Plus
3.
Stitching
Eyestay
L/M to
upper

4. 2.
Stitching 1. Stitching
Mudguar Stitching Decorati
d L/M to Logo L/M on
Upper to Quarter
Quarter Medial
arison (Stitching Logo to Quarter)
Before
Average Output per
hours
36 Prs

Mp Needed for 120 prs


1. Cement Logo 2. Attaching 3. Stitching per hours
Logo to Quarter Logo to Quarter 4 person
CT = 4.5 Second CT = 3.7 Second (FBSN)
Note : We have use 2 head pallete
CTfor every size to quick change over pallet
= 98.1
Plan Second
Average Output per
hours
156 Prs

Mp Needed for 120 prs


per hours
1. Attach 1. Attach Logo 1. Stitching 2 person
Quarter Computer
Lat / Med CT = 8 Second CT = 23 Second
arison (Stitching Logo to Quarter)
Saving
(Before) (Plan/After) Saving

Man Power : 4 Mp 2 Mp 2 Mp
Electric : Not Yet Calculate
Tooling : Not Yet Calculate
Material : Not Yet Calculate

Total Saving :

t Status : On Going (Still analyze on Line 2 Sewing)


Thanks . . .

Any question Please . . .. ?????