Download as pptx, pdf, or txt
Download as pptx, pdf, or txt
You are on page 1of 23

Basic Cementing Calculation

PT. COSL INDO

2016. 10
Cement Plug TOC

Plug in casing Plug in open hole Plug in open hole & casi
Cement Plug TOC

Ite Unit
m
1 Cap DP (Drill Pipe ID)2/1029.4 bbl/ft
2 Cap CSG (Casing ID)2/1029.4 bbl/ft
3 Cap OH (Open Hole ID)2/1029.4 bbl/ft
4 Cap TUB (Tubing ID)2/1029.4 bbl/ft
5 Plug DP (Drill Pipe OD)2/1029.4 bbl/ft
6 Plug TUB (Tubing OD)2/1029.4 bbl/ft

Diameter unit: inch


Cement Plug TOC
Plug Volume=(D1-D2) x Cap CSG

TOC

D2

Plug Volume
TOC=D1Cap
-
CSG Plug DP + Cap DP

D1

Plug in casing
Cement Plug TOC
Plug Volume=(D1-D2) x Cap OH x (1+EOC)

TOC

D2

TOC=D1 - Plug Volume


Cap OH x (1+EOC) Plug DP + Cap DP

D1

Plug in open hole


Cement Plug TOC
Plug Volume=(D1-D2) x Cap OH x (1+EOC)
+ (D2-D3) x Cap CSG
TOC
Plug Volume OH=(D1-D2) x (Cap OH x (1+EOC
D3 - Plug DP + Cap DP)

D2

TOC=D2 Plug
- Volume - Plug Volume(OH)
Cap CSG- Plug DP + Cap DP

D1

ug in open hole & casing


Cement Plug TOC
Plug Volume=(D1-D2) x Cap CSG

Plug Volume 1=(D1-DT) x (Cap CSG Plug TUB


TOC
+ Cap TUB)
D2

DTubing TOC=DT - Plug Volume Plug Volume 1


Cap CSG Plug DP + Cap DP
1

D1

Plug in casing
Cement Plug TOC
Plug Volume=(D1-D2) x Cap OH x (1+EOC)

Plug Volume 1=(D1-DT) x (Cap OH X(1+EOC)


TOC
Plug TUB + Cap TUB)
D2

DTubing TOC=DT - Plug Volume Plug Volume 1


Cap OH x(1+EOC) Plug DP + Cap
1

D1

Plug in open hole


Cement Plug TOC
Plug Volume=(D1-D2) x Cap OH x (1+EOC)
+ (D2-D3) x Cap CSG
TOC
Plug Volume 1=(D1-DT) x (Cap OH X(1+EOC)
D3
Plug TUB + Cap TUB)
D2
Plug Volume 2=(DT-D2) x (Cap OH X(1+EOC)
2 Plug DP + Cap DP)
DTubing
1
Plug Volume Plug Volume (1+2
D1 TOC=D2 -
Cap CSG Plug DP + Cap DP
ug in open hole & casing
Flusher ahead & Flusher behind

Flusher Volume
Flusher Ahead Column=
Cap CSG- Plug DP

D2
Flusher behind volume= Column x Cap DP

D1

TOC

Flusher in casing
Flusher ahead & Flusher behind

Flusher Ahead Column=


Flusher ahead volume
Cap OH X (1+EOC)- Plug DP

D1
Flusher behind = Column x Cap DP

TOC

lusher in open hole


Flusher ahead & Flusher behind

Flusher Ahead Volume1=


( TOC - D1) x (Cap OH X (1+EOC)- Plug
D2
Flusher Ahead Volume2=Total volume - Volu
2
D1
Flusher column 2= Volume 2
1 Cap CSG- Plug DP
TOC

Flusher behind = Column (1+2) x Cap DP

sher in open hole and casing


Flusher ahead & Flusher behind

Flusher Ahead Volume1=


( TOC - DT) x (Cap OH X (1+EOC)- Plug
D2
Flusher Ahead Volume2=
3
D1 (DT D1) x (Cap OH X (1+EOC)- Plug D
2
DTubing
1
TOC Flusher column 3= Volume- Volume(1+2)
Cap CSG- Plug DP

Flusher behind = Column 1 x Cap TUB +


Flusher in open hole
Column(2+3) x Cap DP
Casing Standoff

A=open hole diameter


B= casing outside diamete
Pressure Calculation

psi=0.052 x ppg x ft
Psf Calculation
Velocity Calculation

V=open hole velocity, m/s


Rm=Mud pump rate, gpm
Rc=Cementing rate, bpm
Dd=Drilling collar diameter, in
Dc=casing diameter, in
Do=Open hole diameter, in


PY YP
Mud, Flusher
PV=R600-R300, cps

YP=R300-PV, lbs/100ft2

Spacer
V=R600-R300, cps

P=(0.511*R600-1.022*PV)*2.0904, lbs/100ft2

Cement
PV=(R300-R100)*1.5, cps

YP=R300-PV, lbs/100ft2
PY YP

YP pump pressure of starting to pump slurry


PV pump pressure gradient of increasing pump rate
BHST BHCT

BHST=TVD x PsTG + AST..


(B.1)
BHST estimated bottom-hole static temperature, expressed in
centigrade().
AST assumed constant-temperature-layer temperature/sea bottom
mud line temperature, expressed in centigrade().
PsTG geothermal gradient, expressed in centigrade per one hundred
meter(/100 m).
TVD actual vertical well depth below constant-temperature-layer
/vertical depth below the mud line, expressed in meters(m).
BHST BHCT

T=Ki x BHSTi.. (B.2)


Kiconversion factor between wireline logging bottom-hole temperature
after i hours static and 24 h bottom-hole static temperature (see Table
B.1);
BHSTibottom-hole static temperature measured after i hours static,
expressed in centigrade ().

after i hours static Ki

0-11 1.15

12-14 1.13

15-21 1,08

21-23 1.03

24 1.00
BHST BHCT

PsTG=(BHST-AST)/TVD..
(B.3 )
PsTG geothermal gradient, expressed in centigrade per one hundred
meter (/100 m).

BHCT=F x BHST..
(B.4)
BHCT bottom-hole circulation temperature, expressed in centigrade
().
F empirical factor of local area,0.70 0.85, the deeper the well is and
the smaller the annular space outside the pipe is, the larger the factor is.
BHST BHCT

Question:

Current drilling BHCT --

Current TVD --

AST --

TD BHCT -- ???

You might also like