Geotechnical Engineering Ecg 503 Lecture Note 11 Topic 40 Ground Improvement
Geotechnical Engineering Ecg 503 Lecture Note 11 Topic 40 Ground Improvement
Geotechnical Engineering Ecg 503 Lecture Note 11 Topic 40 Ground Improvement
ENGINEERING
ECG 503
LECTURE NOTE 11
Learning outcomes:
At the end of this lecture/week the students would
be able to:
solution cavities in
Pounder (Tamper) limestone
vibrator makes a
hole backfilled ..and compacted Densely compacted
hole in the weak stone column
ground
Blasting
For densifying granular soils
Sheepsfoot roller
Big weights dropped
from 25 m, compacting
the ground.