SYRIA

Contract HSE Risk Assessment

April 2008

-
SYRIA

Objectives of this workshop

To understand the risk assessment process and


risk assessment matrix

To practice application of the risk assessment


process

To categorize the HSE risk of


selected key contracts

-
SYRIA

Why do a contract risk assessment?


Implementation of Contractor HSE Management standard
AFPC management decision to implement new standard by end 2008
Structured process covering pre and post award
Step 1 assess the risk of each contract

Goal Zero 5 must win improvement areas


Leadership
Land transport
Process safety
Worksite hazards
Contractor HSE management

Prioritization of activities and resources


Management team focus
Contract holder capability
Contractor HSE plans and supervision
-
SYRIA

Application of the risk assessment


Contract Holder competency
HSE competence requirements depend on contract HSE risk
Competence gap analysis, plan to close gaps

Contract HSE clauses


Appropriate clauses depend on contract HSE risk
Contract Holder will select relevant clauses from matrix

Selection of contractors
More capable contractors required to manage higher risks
Impact on bid lists, prequalification and evaluation criteria

HSE plans
More controls required to manage higher risks
Contract Holder will apply relevant HSE plan template from procedure

-
SYRIA
Typical Examples of Jobs By Risks

High Risk

Road Transport

Working At Heights

Confined Space Work


Catering in
Camps
-
SYRIA
Typical Examples of Jobs By Risks

Medium Risks

Office
Maintenance
Vehicle Maintenance

Security Car Rentals


Electrical Maintenance

-
SYRIA
Typical Examples of Jobs By Risks

Office
Low Risks Cleaning

General IT
Services

Admin Support

Pantry
Activities

-
SYRIA

Risk assessment process

1) Identify the hazards associated with activities in the


contract work scope

2) Assess the HSE risk of each hazard using the Risk


Assessment Matrix
Estimate the severity of potential consequences
Estimate the likelihood of these same consequences
Assess the risk rating

3) Categorize the contract HSE risk


corresponding to the highest risk
inherent in the contract scope

-
SYRIA

Risk Assessment Matrix

-
SYRIA

What is the Contract Mode?

MODE 1 CONTRACT MODE 2 CONTRACT MODE 3 CONTRACT


Contractor provides people The contractor executes all Not Work Related Activities.
and tools for the execution of aspects of the job under its own Contractor operates within its
work under the supervision, HSE MS that interfaces with the own HSE MS that has no
instructions and HSE MS of Company HSE MS and provides interfaces with Company
Company. the necessary instructions and
supervision and verifies the HSE performance data is not
The contractor has a MS to reported to Company.
provide assurance that its proper functioning of its HSE
personnel are qualified and MS.
healthy and that its tools and Company is responsible for
machinery are properly verifying the overall
maintained and suitable for effectiveness of the HSE
the job. management controls put in
place by the contractor.

Small maintenance Drilling rig, well services, Off site manufacture or


company working on completion or sub sea fabrication of major
project owned equipment intervention contract, standard components,
at a Company location. EPC contract. design office work.

-
Assessing the Contractor Capability
SYRIA

Contract
Clauses
HSE
Capability
Questionnaire
Mode 1
High
Contract HSE
Risk Mode 2 Contractor Past
HSE Risk Capability HSE
Assessment Performance
Mode 3 To mange
HSE
Risks
Hazard On site Audit
&
(if required)
Environment Mode 1
Register
Medium
HSE Mode 2
Risk

Other Mode 3
HSE Risk
Assessments

Historical
Performance
Mode 1 Shall be
Low Evaluated
HSE &
Risks Mode 2 Deemed
Acceptable
Shell
Yellow Mode 3
Guide
No
Activity Assessment
HSE Risks Required
- Contract mode
SYRIA

Recording the results


DATE: PROJECT / PLACE:
DOCUMENT NO: CONTRACT HOLDER:
CONTRACT / ACTIVITY:
CONTRACT M ODE 1 2 3
RISK CATEGORY: LOW Medium HIGH
EVALUATION TEAM: HSSE: SCM: CONTRACT USER:
RAM: SEVERITY: LIKELIHOOD: TARGET:
COMMENT

Contract Scope:

RISK IDENTIFICATION AND ASSESSMENT

HAZARD RISK CONSEQUENCE TARGET RAM

Signatures

HSE ADVISOR CONTRACT HOLDER SCM/C&P CONTRACT USER


-