Notes:
PTN 1 The actual time will be confirmed according to actual situation and requirements.
2 Service downtime will be twenty minutes averagely which depends on available
frequency channel, equipment configuration, switch connection and manpower
SDH condition.
Existing IF Cable
New IF /STM-1/ETH Cable
New MW equipment
Confidential
MW Swap Scenario 2: Ring node site
No. Step Action Influence Time
No frequency interference Install new ODU/hybrid/Ant./
-
1 install MW out-door part pole/IF cable
Insufficient Sufficient
Install new SDR or PTN -
Indoor Outdoor
Commissioning new link with
-
design or temporary frequency
Actions/Steps 2 pre-installation new IDU
Microwave traffic and NMS
-
configuration
1 Install new ODU/hybrid/Ant./
pole connect instrument to MW new
3 link test -
IDU for test
2 Install new IF Cable 4 New PTN connection test MW connect to PTN(Gbe) -
existing SDH connection Existing BTS 10
5 MW connect to SDH(STM-1)
3 Dismantle old IDU test traffic down minute
Existing BTS 15
6 Dismantle old IDU -
4 Install new IDU traffic down minute
Existing BTS
15
5 Parameter config 7 final install new IDU - traffic
minute
down
6 Antenna alignment New SDR
8 New SDR on air connect SDR to PTN&SDH
traffice on air
6 Link test Change MW freq point to Change Tx/Rx freq of the far New SDR 5
final one only for end MW NE traffic down minute
7 PTN / SDH connection 9 using temporary
frequency otherwise Change Tx/Rx freq of the near New SDR
skip this step end MW NE traffic up
8 Dismantle existing equipment
Dismantle existing Dismantle existing MW -
10
equipents Dismantle existing BTS -
PTN
shift
SDH Existing IF Cable
New IF /STM-1/ETH Cable
New MW equipment
Confidential
MW Swap Scenario 3: Ring node site
PTN
shift
SDH Existing IF Cable
New IF /STM-1/ETH Cable
New MW equipment
Confidential
MW Swap Scenario 5: Access site
SDR
SDR
shift
Existing IF Cable
BTS
New IF /STM-1/ETH Cable
New MW equipment
Confidential
MW Swap Scenario 7: Access site
No. Step Action Influence Time
No frequency interference Install new IDU/IF cable -
1 install new MW in-door part
Sufficient Insufficient Install new SDR -
Indoor Outdoor
Dismantle old MW out-door Dismantle old Existing BTS 40
2
part ODU/hybrid/Ant. traffic down minute
Actions/Steps Install new
ODU/hybrid/Ant.
1 Install new IDU
Commissioning new link
install new MW out-door with design or temporary Existing BTS 120
2 Install new IF Cable 3
part frequency traffic down minute
3 Dismantle old Microwave traffic and NMS
ODU/hybrid/Ant. configuration
4 Install new ODU/hybrid/Ant. MW new link test
E1 & ETH jump cable Existing BTS 10
5 Parameter config 4 E1Ð port test
connect traffic down minute
SDR
Existing IF Cable
BTS
New IF /STM-1/ETH Cable
New MW equipment
Confidential
MW Swap Scenario 8: Access site
SDR
shift
Existing IF Cable
BTS
New IF /STM-1/ETH Cable
New MW equipment
Confidential
Microwave Swap Fallback Solution