Professional Documents
Culture Documents
Metode ME Tarakan
Metode ME Tarakan
Metode ME Tarakan
ADHI KARYA
GENERAL ENGINEERING CONTRACTOR
DIVISI KONSTRUKSI I
OutletTelephone Installation
Cable
Conduit
In bow dos
Outlet Telp
Cable
Telephone System Diagram
Extension Line
IDFT
grounding Travel Agent - 2 Direct Line
Extension Cable
Direct line
Sound System Diagram
Ceilings Speaker 6 w
4 x for Waiting Hall
Passenger Building
POWER SUPPLY
Ceilings Speaker
4 x for Public Hall
Passenger Building
Main Equipments
Ceilings Speaker
AM / FM
4 x for Waiting Hall
Passenger Building
TAPE DECK MIXER
HornSpeaker 25 w
REMOTE MIC 2 x for Parking Area
POWER AMP
HornSpeaker 25 w
2 x for Queuing Area
SELECTOR
HornSpeaker 25 w
2 x for Moveable Bridge
grounding
Wash Waste Diagram
Guard House
Closed FD
Grease Trap
Toilets
CO
Closed
Urinoir
Septic Tank
LV
FD
Gutter
Electrical Installation
Tray Cable Installation
Steel Structure
Hanger
Level adjustment
. .
Joint grounding cable (NYA 2,5 mm)
Step :
Marking tray cable & hanger position
Install hanger
Install tray cable
Install Cable NYA 2.5 mm for grounding junction
Fire Extinguisher Installation
Ramset / Dynabolt
Ramset / Dynabolt
150 cm
120 cm
Ceiling
Exhaust Air flow
grille
Exhaust fan
Wall Mounted
Step :
1. Fabrication ducting & hanger
2. Install ducting
3. Install exhaust grille
4. Install exhaust Fan
5. Install fan grille
Electrical System Diagram
LVMDP / MVMDP
DB PTB DB TA 1 & 2
Lighting & Socket outlet
PLN DB CT 2 DB CT 1
Lighting & Socket outlet
House
DB TS DB OL 1
Lighting & Socket outlet
Lighting & Socket outlet
CTM DB EG
DB GH (Existing)
DB MB DB CTP
TRAVO
DB PT Lighting & Socket outlet DB HP
LVMDP DB LLSDP
DB CS
Grounding position
Control Box
Of grounding system
Step :
1. Take a location for grounding system
2. Install casing pipe with Gip dia. 1.5
3. Install Copper rod inside Gip casing
Copper rod 4. Connect copper rod to BC Cable
from Lightning protection head
Other Facilities
Exit Gate House Power House For Vessel
Elevated
Gate Valve Water
Tank
M Gate Valve Gate Valve
Meter air
Public Toilet Canteen Truck Scale Guard House
Gate Valve
Ground
tank
Gate Valve
Foot
Valve
Tank Pump
Lorry Gate Valve
PDAM Pump Room
To Gutter
Electrical Installation
Generator Set Accessories Installation
1. Install Attenuator 6. Install Exhaust pipe
2. Install Flexible duct for attenuator 7. Install Tank Fuel
3. Install ducting for jointing atternuator with genset unit 8. Install Fuel pipe
4. Install Attenuator grille 9. Install pump & Valve
5. Install Silencer
Roof Genset room
Daily
Tank
Electric
pump
Manual
Pump
Monthly
Tank
Sanitary Installation
.
Squatting Closet Installation
Hanger pipe
Ceiling
Gip Installation
Hanger pipe
Clean Water
Faucet Faucet
Closet Closet
From other Closet & CO
CO