Ekonomi Teknik 1

You might also like

Download as pptx, pdf, or txt
Download as pptx, pdf, or txt
You are on page 1of 28

Pendahuluan

Mengapa ekonomi teknik


diperlukan?

Mengapa (engineers) perlu


mengetahui aspek ekonomi dalam
pekerjaan-pekerjaan keteknikan
WHAT IS ECONOMICS ?
The study of how limited
resources is used to
satisfy unlimited human
wants
LAND
All gifts of nature, such as: water,
air, minerals, sunshine, plant and
tree growth, as well as the land
itself which is applied to the
production process.
LABOR
The efforts, skills, and knowledge
of people which are applied to
the production process.
CAPITAL
Real
Real Capital
Capital (Physical
(Physical Capital
Capital ))
Tools,
Tools, buildings,
buildings, machinery
machinery --
-- things
things which
which have
Dollar Bills have
been
been produced
produced which
which are
are used
used inin further
further production
production
Financial
Financial Capital
Capital
Assets
Assets and
and money
money which
which are
are used
used in
in the
the production
production
process
process
Human
Human Capital
Capital
Education
Education and
and training
training applied
applied to
to labor
labor in
in the
the
production
production process
process
Mengapa sebuah pabrik
dibangun?

Bagaimana memastikan
bahwa investasi yang
ditanamkan akan
mendatangkan pendapatan
yang lebih besar?

Bagaimana menghitung
nilai pabrik apabila akan
dipindahtangankan kepada
pihak lain?
Bagaimana bendung dapat memberi manfaat bagi
masyarakat luas? Bagi petani? Bagi upaya
pengendalian banjir?
Bagaimana mengetahui dampak ekonomi bagi
pemindahan penduduk yang seringkali terjadi dalam
proyek banjir? Apakah biaya ini sepadan dengan
manfaat yang akan diperoleh?
Dari mana kita
mengetahui manfaat
pembangunan jalan?

Bagaimana mengetahui
kelayakan
pembangunan jalan?

Apakah ada bedanya


kelayakan ekonomi dan
finansial investasi
kelayakan
Dalam pekerjaan-pekerjaan sipil yang
dilakukan didaerah perdesaan, apa yang
perlu diperhatikan untuk memastikan
manfaat pembangunan bisa diperoleh
secara optimal?
PRODUCTION POSSIBILITY FRONTIER
Video Recorders

Personel Computers
PRODUCTION POSSIBILITY FRONTIER
Video Recorders

300
Personel Computers
PRODUCTION POSSIBILITY FRONTIER
Video Recorders

500

300
Personel Computers
PRODUCTION POSSIBILITY FRONTIER
Video Recorders

500

300
Personel Computers
PRODUCTION POSSIBILITY FRONTIER
Video Recorders

500

300
Personel Computers
PRODUCTION POSSIBILITY FRONTIER
Video Recorders

500

300
Personel Computers
PRODUCTION POSSIBILITY FRONTIER
Video Recorders

500

Unused
Resources

300
Personel Computers
PRODUCTION POSSIBILITY FRONTIER
Video Recorders

500 Unavailable
Resources

Unused
Resources

300
Personel Computers
PRODUCTION POSSIBILITY FRONTIER
Video Recorders

500

Unused
Resources

300 500
Personel Computers
PRODUCTION POSSIBILITY FRONTIER
Video Recorders
600

500

Unused
Resources

300 400
Personel Computers
PRODUCTION POSSIBILITY FRONTIER
Proses Pengambilan Keputusan

step rational decision making proses:


1. Mengenal Permasalahan
2. Definisikan Tujuan
3. Kumpulkan Data yang Relevan
4. Identifikasi alternatif yang
memungkinkan (feasible)
5. Seleksi kriteria untuk pertimbangan
alternatif terbaik
6. Modelkan hubungan antara kriteria, data
dan alternatif
7. Prediksi hasil dari semua alternatif
8. Pilih alternatif terbaik
Biaya ?
Biaya Historis
Biaya mendatang (Future Cost)
Biaya Kesempatan (Opportunity
Cost)
Biaya siklus hidup (penelitian,
pengembangan, perancangan,
pembuatan, pengetesan,
operasional, perawatan
Biaya ?
Biaya Modal (Kuiper,1971): jumlah
semua pengeluaran yang dibutuhkan
mulai dari prastudi sampai proyek selesai
dibangun.
Biaya modal terdiri dari:
1. Biaya langsung (direct cost)
ex: pembangunan jembatan: biaya
pembebasan tanah, biaya galian dan
timbunan, biaya beton bertulang, biaya
konstruksi baja
Biaya ?
2. Biaya tidak langsung (indirect
cost)
. biaya yang tidak diduga dari biaya
langsung (5 %, 10%, 15%, tergantung
pada perencana atau pemilik)
. biaya teknik (engineering cost): biaya
pembuatan desain, studi kelayakan,
biaya pengawasan
. bunga
Biaya ?
Biaya tahunan (annual cost)
biaya selama proyek berlangsung,
terdiri:
bunga
depresiasi
biaya operasi pemeliharaan
Biaya ?
Biaya tetap (fixed cost)
Biaya yang besarnya tidak
dipengaruhi oleh volume produksi
ex: biaya gedung, biaya tanah, biaya
mesin, peralatan
Biaya variabel (variable cost)
Biaya yang besarnya tergantung
pada volume produksi
ex: biaya bahan baku, biaya tenaga
kerja langsung
1. Biaya Tetap Total
(Total Fixed Cost), Biaya Produksi
TC
TFC = f (Konstan).
2. Biaya Variabel Total TVC
(Total Variabel Cost),
TVC = f (output atau
Q).
3. Total Cost (Total TFC
Cost), TC = TFC +
TVC Q
1. Average Fixed Cost,
Biaya Produksi
AFC = TFC/Q
2. Average Variabel Cost, MC
AVC = AVC/Q
3. Average Cost, AC
AVC
TC TFC TVC
AC AFC AVC
Q Q
Biaya Marjinal (Marginal
Cost); TFC
MC = TC/ Q
Q

You might also like