SAFE Operation & Maintenance Instruction
SAFE Operation & Maintenance Instruction
Copyright ABB.
. - 1 -
6/5/2017
C module unit
Cable
Compartment
ABB - 2 -
F module unit
Open Pushbutton Close Pushbutton
Operation Hole for LBS Energy Charge
Energy Store Indicator
Operation Hole of E.S.
Voltage Indicator
Fuse cabinet
Fuse status indicator
ABB - 3 -
V module unit
Operation Hole of
Protection relay Disconnecting switch
Operation Hole of E.S.
ABB - 4 -
Operation
Pull out the fuse handle. The fuses are firmly fixed in the fuse cover
ABB - 10
Fix the fuses to the fuse cover using the contact screw. The striker
must point out from the fuse canister for the fuse to function properly
-
Fuse installation and replacement
Fuse adapter
ABB - 11
Turn the handle on the fuse cover clockwise to lose and seal the fuse
canister
Close the fuse panel. The switches are ready for operation
-
V Module operation
Open ES
Close DS
Turn the operating handle clockwise to
charge the close/open spring
ABB - 12
Notice:
ABB - 18
7. Check battery
8. Confirm all fuses have been fixed properly. (F, M panel.)
9. Confirm all current circuit is not opened
10. Confirm all voltage circuit is not short circuit
11. Confirm the earthing system of equipment have been connected
the earthing network very well
12. Confirm the E.S. of incomer at open position before you
energize an equipment
13. Confirm the bushings of D unit be fitted with insulated cover if
ABB - 19
Routine inspection:
Check the manometer status (within green area)
Check the position indicator well working.
Check the EFI well working
Check all LED of Voltage Indicator flashing
Check if there are any abnormal temperature or sound in the
cable compartment or not
ABB - 20
-
Maintenance