Professional Documents
Culture Documents
NMC Lean Office Exercises
NMC Lean Office Exercises
Exercises
CIM
6/20/2017 12:37 PM 2
Company Name
Logo Designs & More
CIM
6/20/2017 12:37 PM 3
Product
Logo Designs & More
Example
CIM
6/20/2017 12:37 PM 4
Work Environment (Exercise 1)
CIM
6/20/2017 12:37 PM 5
Job Descriptions (Exercise 1)
Customer Service Representative
Process Incoming Customer Orders (issues Index Cards)
Designer I
Some Knowledge of Simple Geometry (able to draw an X)
Designer II
Basic Knowledge of Simple Geometry (good at drawing circles)
Designer Ill
Basic Knowledge of Simple Geometry (good at drawing squares)
Knowledge of Scale (knows how to draw things to proper scale)
Designer IV
Advanced Knowledge of Simple Geometry/Scale
CIM
6/20/2017 12:37 PM 6
Design Sample Process Flow
(Exercise 1)
Traditional Office
(Departments)
CIM
6/20/2017 12:37 PM 7
Tracking System (Exercise 1)
Order Tracking System
Order Number: < hand write order # in this box
Customer Service
CSR Receives Customer Order for New Logo Design
CSR Processes Order & Submits Order & Index Card to Design
Engineering
Design Engineering
Create a New Logo Design Based on Customer Inputs
Engineering Sample Approval
Give Sample to Customer
Lets Do It!
CIM
6/20/2017 12:37 PM 9
Design Sample Process Flow
(Exercise 1)
Traditional Office
(Departments)
CIM
6/20/2017 12:37 PM 10
Customer Order #1
Setup: Read Customer Requirements completely before processing this Customer Order!
CIM
6/20/2017 12:37 PM 11
Customers Current Logo Design
CIM
6/20/2017 12:37 PM 12
New Logo Design #1
CIM
6/20/2017 12:37 PM 13
Customer Order X-7
Setup: Read Customer Requirements completely before processing this Customer Order!
What if?
What if?
What if?
CIM
6/20/2017 12:37 PM
Wrong Color Index Card 16
Tracking Log
Tracking Log CSR Design Engineering Design Engineering Sample Shipped Status
Order Number Date Received Date Received Approval Date Ship Date
X-1 2/1/2008 2/1/2008 2/3/2008 In Process
X-2 2/1/2008 2/1/2008 2/3/2008 In Process
X-3 2/1/2008 2/1/2008 2/3/2008 In Process
X-4 2/1/2008 2/1/2008 2/3/2008 In Process
X-5 2/1/2008 2/1/2008 2/3/2008 In Process
X-6 2/1/2008 2/2/2008 2/4/2008 In Process
X-7 2/1/2008 2/2/2008 2/4/2008 Rush
X-8 2/1/2008 2/2/2008 2/4/2008 In Process
X-9 2/2/2008 2/2/2008 2/4/2008 In Process
X-10 2/2/2008 2/2/2008 2/4/2008 In Process
X-11 2/2/2008 2/3/2008 2/5/2008 In Process
X-12 2/2/2008 2/3/2008 2/5/2008 In Process
X-13 2/2/2008 2/3/2008 2/5/2008 Cancelled
X-14 2/2/2008 2/3/2008 2/5/2008 In Process
X-15 2/2/2008 2/3/2008 In Process
X-16 2/2/2008 2/4/2008 In Process
X-17 2/3/2008 2/4/2008 In Process
X-18 2/3/2008 2/4/2008 In Process
X-19 2/3/2008 2/4/2008 In Process
X-20 2/3/2008 2/4/2008 In Process
X-21 2/3/2008 2/4/2008 In Process
X-22 2/3/2008 2/5/2008 In Process
X-23
X-24
2/3/2008
2/4/2008
2/5/2008
2/5/2008
Value Added? In Process
In Process
X-25 2/4/2008 2/5/2008 In Process
X-26 2/4/2008 2/5/2008 In Process
X-27 2/4/2008 2/5/2008 In Process
X-28 2/4/2008 2/5/2008 In Process
CIM
6/20/2017 12:37 PM 17
Value Added Activities (Exercise 1)
Get Card
Draw Square
Draw Circle
Draw X
How long does VA activities take?
VA Cycle Time is measured in Seconds or Minutes.
NVA Cycle Time is measured in Minutes or Days!
CIM
6/20/2017 12:37 PM 18
Non-Value Add activities (Exercise 1)
Multiple Mental Setups
Lots of NVA (Waste)
Distances Between Each Process Step
Movement of Paper (walking)
Queues (waiting for work / piles of work)
Searching for Orders (emails, phone calls)
Inspection (Is customer willing to pay for it?)
Rework Loops (quality issues)
CIM
6/20/2017 12:37 PM 19
Work Environment (Exercise 2)
CIM
6/20/2017 12:37 PM 20
Design Sample Process Flow
(Exercise 2)
Cell Supervisor
LANE
Co-Located Office
(Workers Not Cross-Trained)
CIM
6/20/2017 12:37 PM 21
Tracking System (Exercise 2)
Order Tracking System
Order Number: < hand write order # in this box
Customer Service
CSR Pulls Customer Order from FIFO Board
CSR Processes Order & Submits to Design Engineering
Design Engineering
Creates a New Logo Design Based on Customer Inputs
Engineering Sample Approval
Give Sample to Customer
Lets Do It!
CIM
6/20/2017 12:37 PM 23
Design Sample Process Flow
(Exercise 2)
Cell Supervisor
LANE
Co-Located Office
(Workers Not Cross-Trained)
CIM
6/20/2017 12:37 PM 24
Customer Order #5
Square Color Red or Black?
Note: Read Customer Requirements completely before processing
this Customer Order!
Customer Requirements: Revise Logo Design. Draw a new version
of the current logo design centered on a GREEN 5 x 8 Index Card
(See original version attached on page 2 of this Customer Order).
Important! Customer has changed color scheme from original
design.
1. Must use GREEN 5 x 8 Index Card.
2. Square must be BLACK.
3. Circle must be BLACK and must be tangent to 4 sides of a BLACK
Square.
4. X must be BLACK and span corner to corner of RED Square.
5. Require 100% Inspection.
What if?
Setup: Read Customer Requirements completely before processing this Customer Order!
What if?
CIM
6/20/2017 12:37 PM
Wrong Color Index Card 27
Customer Order #2
Setup: Read Customer Requirements completely before processing this Customer Order!
What if?
CIM
6/20/2017 12:37 PM 29
Work Environment (Exercise 3)
CIM
6/20/2017 12:37 PM 30
Design Sample Process Flow
(Exercise 3)
Cell Supervisor
Work Cell
(Cross Trained Workers)
CIM
6/20/2017 12:37 PM 31
Tracking System (Exercise 3)
Order Tracking System
Order Number: < hand write order # in this box
Lets Do It!
CIM
6/20/2017 12:37 PM 33
Design Sample Process Flow
(Exercise 3)
Cell Supervisor
Work Cell
(Cross Trained Workers)
CIM
6/20/2017 12:37 PM 34
No Purple Cards
Customer Order #14
Setup: Read Customer Requirements completely before processing this Customer Order!
CIM
6/20/2017 12:37 PM 35
Work Cell - What did you observe?
Better Flow
All Work Flow is Visible (6S).
All Value Added Work is done in One Location
Pull Process Flow (Not Push)
NVA Minimized (thus Overall Cycle Time Minimized)
Fewer Queues/Work Handoffs
Fewer Mental Setups
Less PIP (thus Overall Lead Time Minimized)
CIM
6/20/2017 12:37 PM 36